NADklima WKD 380 User manual

KEEP THIS GUIDE
Maintenance and installation guide
Industrial diuser
WKD 380 and 381
nadklima.com
CANADA
M
A
D
E
I
N
Québec
NAD Klima (head oce)
144 Léger, Sherbrooke (Qué) J1L 1L9
(819) 780-0111
1 866 531-1739
info@nadklima.com
Ontario
NAD Klima Ontario
2840 Argentia Road, Unit 6
Mississauga (Ontario) L5N 8G4
416 860-1067
ontario@nadklima.com

2
CONFIGURATION AND MODE OF OPERATION
1
3
422
Mode of operation
The air ow entering the
turbulence chamber (1) creates an
intensive helical movement,
depending on the positioning of
the nozzle (4). The airow at the
deector outlet (3) will produce air
induction and a variable penetra-
tion.
Square
Round
Nozzle : Position 1
Stable vertical air ow
with large penetration.
Nozzle
: Position 2
Vertical airow with
a helical eect.
Nozzle
: Position 4
Horizontal air ow
(even in free suspension)
with a maximal
horizontal reach and an
elevated primary induction.
Nozzle
: Position 3
Horizontal helical air ow
and a relatively weak reach.
Cooling
Heating
Conguration
WKD 380 & 381
WKD 380 only
DN 6oo
DN 6oo
DN 8oo
DN 1000
603 mm X 603 mm
(23 3/4 in X 23 3/4 in)
Ø 603 mm (23 3/4 in)
Ø 800 mm (31,5 in)
Ø 1016 mm (40 in)

Diuseur
Diuseur
Diuseur
Plaster frame
A) Opening in the gypsum
Choose one of the three (3) options
instalation shown at right.
Option 1
- Cut a square in the gypsum
of the dimension of diuser minus 13 mm
(1/2 in).
Option 2 et 3
- Cut a square in the gypsum
of the dimension of diuser plus 13 mm),
(1/2 in).
- Around this hole, insert a plaster frame
and x it
B) Install diuser
The plenum will be suspended with
metal wire through suspension’s holes (4)
predrilled for this purpose
As shown in the drawing on the right,
install the plenum by adjusting its height.
According the option 1,
the base of the diuser will
will press
outside the gypsum‘s hole, directly to
the ceiling.
or
according option 2 and 3 ,
the base of the plenum should be ush
to the hole.
Gypsum
Drywall mounting
Option 3
diuser ush with the ceiling
Gypsum
Drywall moulding
Option 2
diuser on frame
Gypsum
Option 1
diuser under the ceiling
INSTALLATION IN A GYPSUM CEILING
WKD 380 & 381 - Square
Équerres (4)
pour
suspension
parasismique
Gypsum
3

Diuseur
Diuseur
•
INSTALLATION IN A GYPSUM CEILING
WKD 380 & 381 - Round
Gypsum
Diuser
Paraseismic
hanging plate (3)
Flexible drywall moulding
A) Opening in the gypsum
Choose one of the two (2) instalsation
options shown on the right.
Option 1
- Measure the diuser’s diameter
( ØD ).
- REMOVE 13 mm (1/2 inch)
-
Cut a circle in the gypsum equivalent to
this new measure (ØD -
13 mm (1/2 inch)).
- Around this hole, place the gypsum
guide and x it.
Option 2
- Measure the diuser’s diameter
( ØD ).
- ADD 13 mm (1/2 inch)
- Cut a circle in the gypsum equivalent to
this new measure
(ØD +
13 mm (1/2 inch)).
- Around this hole, place the drywall
moulding and x it.
B) Install the diuser
The plenum shall be hanged by the
paraseismic hanging plate (3) with metal
wire.
As the drawing on the right shows,
install the diuser by adjusting its
height either:
according option 1, diuser rim
will be supported under the ceiling
or,
according option 2, the base of the
plenum must be ush to the hole.
Gypsum
drywall moulding
Option 2
diuser ush to the ceiling
4
Gypsum
Option 1
diuser below the ceiling

Diuseur
Grid
moulding
A) Grid moulding
Make sure that the grid moldings of the
suspended ceiling match the diuser’s
face dimensions.
(610 X 610 mm (24 X 24 in)
Also, make sure that the moldings of
the ceiling are rmly anchored.
B) Install the diuser
The diuser can be heavy weight.
If he leans on the grid moulding,
make sure that these are very well
anchored.
Slowly move and place the diuser and
plenum box in the ceiling space.
Secure the support with metal wire by
suspending the plenum through 4
antiseismic suspension holes..
Gypsum
Grid mouling
INSTALLATION IN A SUSPENDED CEILING
WKD 380 & 381 - Square DN 600
Panel of suspended ceiling
5
Diuser
Paraseismic
hanging plate
(4)

6
INSTALLATION IN FREE SUSPENSION
WKD 380 & 381
Top air intake Side air intake
Using the anchoring bracket situated on the side of the diuser, suspend the diuser
at the desired height. In order to obtain a precise adjustment, we recommend using the
anchoring system CCA with an aviation type cable (3048)
Verify that the diuser is well anchored.
Once this process is nished you can connect the air intake
////////////////////////////////
Aviation type cable
Adjustable anchorage system (CCA)
Diuser
Seismic proof anchorage bracket

7
MAINTENANCE
The diusers WKD 380 and WKD 381 of NAD
Klima requires no special maintenance other than
periodic cleaning.
We recommend cleaning the diuser with a
multi-lament brush or duster microber that
you will pass softly on the diuser. It has
thermo-lacquered nish for an easy cleaning, as
dust does not stick to it.
When cleaning, gently move the brush or duster
on diuser.
Make sure nothing is obstructing the proper
operation of the diuser.

NAD Klima (head oce)
144 rue Léger, Sherbrooke (Qué) J1L 1L9
(819) 780-0111
1 866 531-1739
info@nadklima.com
NAD Klima Ontario
2840 Argentia Road, Unit 6
Mississauga (Ontario) L5N 8G4
416 860-1067
ontario@nadklima.com
Quality
NAD Klima
®
NAD Klima diusers are the result of a manufacturing
process in which our experts successfully meet your
requirements and particular challenges.
Our range of equipment comprises the latest technological innovations.
Our passion for work well done and digital precision ensure that the resulting
product will guarantee the highest standards.
Manufactured in Sherbrooke, Quebec, (Canada) and distributed all
across North America, our products raise the bar in terms of
standards of quality, eciency and energy savings.
A leader in air diusers for LEED projects,
NAD Klima is always striving to provide
better comfort to consumers.
NAD Klima all products are the pride of
an inventive, innovative and devoted team.
Our goal is not only to supply diusers,
but to create outstanding results.
We are NAD Klima.
Quality
NAD Klima
®
®
CANADA
M
A
D
E
I
N
This manual suits for next models
1
Table of contents
Popular Accessories manuals by other brands

ROSE DISPLAYS
ROSE DISPLAYS GOTCHA WITH ONEUP GOTCHA CLIPS instruction sheet

ThunderDog
ThunderDog TH6005BB instruction manual

BEANAIR
BEANAIR BeanDevice Wilow AX-3DS quick start

Microsonic
Microsonic mic+25/IU/TC instruction manual

iSysmart
iSysmart SGZ716 user manual

Conrad
Conrad 1168455 operating instructions

Stadler Form
Stadler Form Jasmine operating instructions

Honeywell
Honeywell Ademco 5800SS1 installation guide

Bogen
Bogen NR100 Installation & use manual

SOMFY
SOMFY Sunis WireFree RTS Light Sensor Programming/Operating/Installation Instructions

Trust
Trust ACDB-7000A user manual

Sengate
Sengate 4PH-75BQE quick start guide