
Before starng assembly, please check
contents are as follows:
•1 STERLING lter (removed from plasc bag)
•2 white pre-lter bag
• - metal retaining springs
SEP 120 = 1 x 170 mm
SEP 360 = 1 x 250 mm
SEP 900 = 2 x 400 mm
service interval kit containing:
• printed card
• self-adhesive mestrip
Insert the boss on the reverse
of the mount (c) into the pre-
drilled hole in the separator
lid.
Peel backing from mestrip (a)
and aach to the plasc card
(b) within the doed lines.
Flex the card, passing the ends
through the slots on the top
surface of the mount.
To acvate, press rmly on
the mestrip label at the point
indicated.
Aer a few minutes, a red line
will appear, to indicate ‘me in
service’ up to 12 months.
A replacement card and
mestrip will be supplied with
each service kit.
maintenance kit installation guide
SEP 120/360/900 MRK
1
service indicator - assembly and aachment
(b)
(c)
(a)
i
ii
iii
general installaon notes
• Please ensure a steady fall in the
pipe run from the outlet point to the
sanitary drain.
• When used in conjunction with
timed solenoid drain, set drain “open”
duration to minimum setting (1-2
seconds).
• When used in conjunction with
motorized ball valve or high capacity
drain (ie Drain-all®) a de-pressur-
ization chamber must be installed
between drain and Sepura unit.
• Never discharge condensate to a
storm drain or to suface water; always
connect to a sanitary drain or sewer.
• Remember that it’s the user’s
responsibility to check with the local
authority as to the permissible dis-
charges in their area.
tesng quality
Replace lters before
outlet cloudiness
exceeds the ppm limit
for your region.
Test outlet quality
weekly using kit
provided.