
45m 4 Arm Rotary Washing Line(LYQ205-45S)
Assembly & Operation Instructions
Parts Included
Directions for Use
1. Carefully remove all packaging.
2. Please remove protective cap on upper section (a) before assembly.
Lower section (b) is to be inserted into upper section (a).
3. Establish a suitable location for the airer. Please ensure there is enough
room for it to rotate freely when fully open (2.07 meters diameter.)
4. Installing the ground spike – Note; Ensure you concrete just the ground
spike before assembling any other parts.
Permanent fixing
a. Dig a hole 20cm square and 40cm deep.
b. Partly fill the hole with concrete and place the spike upright in the centre.
c. Complete filling with concrete and ensure when installing the ground spike
that it is firmly located in the vertical position.
d. Allow 48 hours for setting before use.
Non - Permanent fixing
Using a piece of wood to protect the top of the spike, strike it with a hammer
driving your spike into the ground, stopping occasionally to check the spike
always maintains a vertical position.
Continue driving your spike into the ground until the top of the spike is at
ground level
Operation
4 stage locking system - push progressively upwards for warm weather
locking positions.
Care Instructions
When not in use we recommend that the airer is covered and securely tied.
If removing from the ground spike for storage please ensure that
the airer is covered and kept out of the reach of children.
WARNING - Do not use this rotary in adverse weather conditions as this will
void your guarantee.
Please use the Spike or Socket which is provided with your rotary if you do not
this could invalidate your guarantee.
Maximum loading is 28KG evenly spaced.
This product imported by:
Consumable Direct Ltd
M32 0JT
UK
Operation
(a)
Upper
Section
(b)
Lower
Section
(c)
Metal
Ground
Spike
(d)
Rotary
Cover
20cm
40cm
1
3
2