nor-tec UL10 User manual

OPERATION MANUAL
TKZ: 315 011 002 002
Ausgabe: 01 / 2015
CHARGER / DISCHARGER
UL10
0 – 40V / 0 – 40A
TKZ: UL10.040000
Software-Version 20.108a
Dated 22.01.2013
COPYRIGHT ©2003-2015 by
NorTec Electronics GmbH & Co. KG
An der Strusbek 32 B
D – 22926 Ahrensburg
Tel.: +49 4102 42002
Fax: +49 4102 42840
Email: info@nortec-electronics.de
Web: www.nortec-electronics.de

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014 1

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
2 © NorTec Electronics 2014
CHARGER / DISCHARGER UL10

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014 3
Contents
1General ................................................................................................................................. 6
1.1Application............................................................................................................................. 6
1.1.1Range of functions ................................................................................................................ 6
1.1.2Design................................................................................................................................... 6
1.2Sphere of application............................................................................................................. 7
2Organs of control and indication ............................................................................................ 8
2.1Front instrumentation panel................................................................................................... 8
2.2Rear Instrumentation wall...................................................................................................... 9
2.2.1Mains cable........................................................................................................................... 9
2.2.2Source of acoustic signals..................................................................................................... 9
3Principle of operation........................................................................................................... 10
3.1Connection.......................................................................................................................... 10
3.2Installation........................................................................................................................... 10
3.3Commissioning.................................................................................................................... 10
3.3.1Mains Connection................................................................................................................ 10
3.3.2Warning............................................................................................................................... 11
4Ratings................................................................................................................................ 12
4.1Input & Output Parameters.................................................................................................. 12
4.2Working temperature range................................................................................................. 12
5Controls............................................................................................................................... 13
5.1General ............................................................................................................................... 13
5.1.1Indikation............................................................................................................................. 13
5.1.2Keyboard............................................................................................................................. 14
5.2Self-Test.............................................................................................................................. 16
6System adjustment.............................................................................................................. 17
6.1Language Selection............................................................................................................. 17
6.2Date Input............................................................................................................................ 18
6.3Time Input ........................................................................................................................... 18
6.4Print out functions................................................................................................................ 19
6.4.1General ............................................................................................................................... 19
6.4.2Print Equipment................................................................................................................... 19
6.4.3Printing Programs................................................................................................................ 20
6.5Program Selection............................................................................................................... 22

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
4 © NorTec Electronics 2014
6.5.1Principles of Program Selektion........................................................................................... 22
6.6Types of batteries................................................................................................................ 24
6.7Programming Matrix............................................................................................................ 24
6.8Input of battery data ............................................................................................................ 25
6.8.1General ............................................................................................................................... 25
6.8.2Operation without battery Р:00 ............................................................................................ 25
6.8.3Operation without Lead acid batteries ................................................................................. 25
6.8.4Operation with nickel-cadmium batteries............................................................................. 28
6.9Readings on the LC display of program data 420................................................................ 30
6.9.1Program 420 Stage 1 .......................................................................................................... 31
6.9.2Program 420 stage 2........................................................................................................... 32
6.9.3Program 420 stage 3........................................................................................................... 33
6.9.4Program 420 stage 4........................................................................................................... 34
6.9.5Program 420 stage 5........................................................................................................... 35
6.9.6Program 420 stage 6........................................................................................................... 36
7Tabulated program progress display.................................................................................... 37
7.1Program 0. Discharge – any battery type ............................................................................ 37
7.2Program 10. Discharge – air-tight aircraft lead acid battery ................................................. 38
7.3Program 11. Discharge – Pb battery sealed commercial ..................................................... 39
7.4Program 16. Discharge – Pb battery vented commercial..................................................... 40
7.5Program 20. Discharge – enclosed aircraft nickel-cadmium battery .................................... 41
7.6Program 31. Discharge – enclosed aircraft nickel-cadmium battery .................................... 42
7.7Program 110. Commissioning – air-tight aircraft lead acid battery....................................... 43
7.8Program 111. Commissioning – Pb battery sealed commercial........................................... 44
7.9Program 116. Commissioning – Pb battery vented commercial........................................... 45
7.10Program 120. Commissioning – enclosed aircraft nickel-cadmium battery .......................... 46
7.11Program 210. Charging – air-tight aircraft lead acid battery................................................. 47
7.12Program 211. Charging – Pb battery sealed commercial..................................................... 48
7.13Program 216. Charging – Pb battery vented commercial..................................................... 49
7.14Program 220. Charging – aircraft nickel-cadmium battery ................................................... 50
7.15Program 221. Charging – aircraft nickel-cadmium battery VARTA ...................................... 51

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014 5
7.16Program 230. Charging – aircraft nickel-cadmium battery type SAFT.................................. 52
7.17Program 231. Charging – aircraft nickel-cadmium battery type НКБН ................................. 53
7.18Program 410. Maintenance – air-tight aircraft lead acid battery........................................... 54
7.19Program 411. Maintenance – Pb battery sealed commercial............................................... 55
7.20Program 416. Maintenance – Pb battery vented commercial............................................... 57
7.21Program 420. Maintenance – enclosed aircraft nickel-cadmium battery .............................. 58
7.22Program 421. Maintenance – enclosed aircraft nickel-cadmium battery type VARTA.......... 59
7.23Program 430. Maintenance – enclosed aircraft nickel-cadmium battery type SAFT............. 60
7.24Program 431. Maintenance – enclosed aircraft nickel-cadmium battery type НКБН ............ 61
7.25Program 510. Direct current charging – air-tight aircraft lead acid battery............................ 62
7.26Program 511. Direct current charging – Pb battery sealed commercial ............................... 63
7.27Program 516. Direct current charging – Pb battery vented commercial ............................... 64
7.28Program 520. Direct current charging – enclosed aircraft nickel-cadmium battery............... 65
7.29Program 800. Constant power supply – without battery...................................................... 66
7.30Program 810. Constant power supply – air-tight aircraft lead acid battery .......................... 67
7.31Program 811. Constant power supply – Pb battery sealed commercial .............................. 68
7.32Program 816. Constant power supply – Pb battery vented commercial.............................. 69
7.33Program 820. Constant power supply – enclosed aircraft nickel-cadmium battery.............. 70
8Replacement of printing paper and ribbon ........................................................................... 71
8.1Ribbon replacement ............................................................................................................ 71
8.2Replacement of printing paper............................................................................................. 71

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
6 © NorTec Electronics 2014
1 General
1.1 Application
1.1.1 Range of functions
The battery charger-discharger UL10 serves to test, charge and discharge all types of batteries
based on their particular approved characteristics and using various programs.
A menu and a touch-input keyboard control all the programs.
Also, the device can serve as a direct current source without connecting any battery.
The following software is available to measure and register voltages of individual batteries according
to the current charging program or independently of operations underway:
- Measurement of voltage of an individual battery (Р)
Sphere of application
The device is contained in a body to be used indoors. Its rugged design enables to install it on vibra-
tion-proof racks or to carry it in a handbag during field exercises. It is used by the navy as a tester.
Types of batteries:
The types of the batteries are the following:
00 no battery connected
10 air-tight aircraft lead acid electrolyte-filled batteries
11 Pb battery sealed commercial
16 Pb battery vented commercial
20 enclosed aircraft nickel-cadmium batteries
21 enclosed nickel-cadmium batteries type VARTA
30 enclosed nickel-cadmium batteries type SAFT
31 enclosed nickel-cadmium batteries type НКБН
Different programs serve to enter parameters of various batteries (nominal voltage, number of cells
in a battery and nominal capacity) into the UL 10 enabling to ensure their long service life.
1.1.2 Design
The device consists of three main components:
1. A functional pull-out unit 19 inches. Up to 5 units can be installed in a pile. The performance
of the device is tested during manufacture.
2. A read-only memory specified by a customer of energy independent reprogrammable sto-
rage with a relevant instruction manual.
3. A body
4. A set of cables (specified by the customer)

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014 7
1.2 Sphere of application
The normal body of the device is designed for indoor operation without any special ventilation.
It can be installed in a laboratory, a charging room, etc.
The device is fully adapted for field service when packed into a polyethylene or corrugated card-
board transport case.
The fully functional pull-out unit can be used in a separate vibration protected body or in groups of
mobile or stationary framework racks.

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
8 © NorTec Electronics 2014
2 Organs of control and indication
Organs of control, indication and connection of the UL 10 device for testing batteries are easily ac-
cessible from the front panel. Connections of specifically requested cells for automatic registration of
voltages of batteries, such as aircraft batteries and batteries for torpedoes or connections of several
PCs to the mains, are arranged on the rear face.
2.1 Front instrumentation panel
1) The POWER ON / OFF switch with a LED indicator
а) triggers the device on and off
b) The red LED indicates that the device is connected to the mains
2) The automatic protection circuit 16 Аprotects 220 V AC power supply.
The indicator
The LC graphic display (2 lines, 40 characters) serves to transmit information to the user and to in-
dicate the parameters of operation of programs in the progress of charging.
2) The touch-input keyboard
The keys BREAK, CLEAR, PRINT, ENTER↵ serve to interrupt programs, to delete erroneously en-
tered data, to print out results and to confirm input of requested data, respectively.
The digital unit enables the user to enter digital data, such as parameters of batteries and the opera-
tor number.
The key * ensures access to the information about the system menu.
3) The printer
The built-in printer for printing out protocols can be enabled at any moment before and after opera-
tions with a battery. It prints out all basic parameters of a battery and all errors, if necessary.
6) The battery tester
The battery tester is connected to the UL10 device with a plug-and-socket connector type VG 95
328 C10-6SN (6-contact). The battery tester enables to measure voltages of batteries between
-4.0 to + 4.0 V.
7) Mains connection to the battery
The battery is connected via special connecting cables to the UL 10 device with two 4-pin Plug and
socket connectors type VG complying with requirements VG 95 234.
8) The manufacturer/ designation of the UL 10 device

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014 9
2.2 Rear Instrumentation wall
2.2.1 Mains cable
2.2.2 Source of acoustic signals
The source of acoustic signals informs the operator of the condition of the device; accordingly them
the operator receives relevant instructions to execute. An error of input, a failure or operation finish
can induce an acoustic signal.

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
10 © NorTec Electronics 2014
3 Principle of operation
3.1 Connection
Connection is made following the instructions below:
- connect to the 220 V AC mains
- connect the battery
- put the mains switch POWER ON / OFF (2.1.1a) into position ON
- check if the red LED indicator is on.
After that the automatic self test follows.
NOTE!
The procedure is interrupted in case of an error message. After a successful self-test the parame-
ters of the connected battery should be entered by selecting a corresponding item. This is done with
the keys 4; 6 and ENTER↵. The available types of batteries correspond to item 1.1.2.
3.2 Installation
The device should be installed so that uninterrupted ventilation of and air exhaust from the device
are ensured (at least 5 cm free space from the back face of the device).
The cooling air is delivered from below and exits through the rear face. When the device operates
in the open air, e.g. under a tent, check that it is placed n a dust-free base otherwise the cooling
process can be inhibited.
The device should be operated in the buildings designed for this purpose on corresponding bases
because the pull-out unit is fitted with a fan without any extra case so that the device without a pro-
tective body can be damaged or the servicing personnel can be traumatized.
3.3 Commissioning
3.3.1 Mains Connection
- put the switch POWER ON/OFF into the position OFF
- connection to the mains 220 V AC is made with a mains cable extending through the rear face and
fitted with a connector type CEBEC (at an angle 90о)
- connect the cable from the battery to the device (+ and -). It is impossible to confuse the polarity
because the connector is provided with a special key
- connect the measuring cable when operating with nickel-cadmium batteries
- the battery is connected to the UL10 with the cables from the delivery set (the cables with clamps
(+ and -)). Check the polarity! When connecting the battery with the cable with tapered outlet clamps
with built-in temperature sensors it is impossible to confuse the polarity because of the geometry of
the poles of the battery.

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014
11
3.3.2 Warning
Be cautious when touching!
The rear face of the pull-out unit can heat, specifically when executing the discharge programs.
The device disconnects in case of an intolerable temperature rise.
Do not open the device when it is on!
Even when the device is disconnected from the 220 V AC mains there remains inside the device a
level of voltage dangerous to touch. Exclusively the manufacturer can perform servicing of the de-
vice otherwise the warranty becomes null.
Note:
The manufacturer bears no responsibility for losses due to improper installation, commissioning or
operation. Only the materials approved by the manufacturer should be used.
- Only the manufacturer can repair and calibrate the device UL 10 when it is used in aircraft.

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
12 © NorTec Electronics 2014
4 Ratings
4.1 Input & Output Parameters
input voltage 220 V + 10% (single-phase alternating)
input frequency 45-60 Hz
input power 2000 VА
external mains protection 16 А, mean inertia
fan power about 100 / 300 l/min
charge current range 0.5 – 40 А
discharge current range 0.5 – 40 А
charge voltage range 0.1 – 40 V
discharge voltage range 0.1 – 40 V
voltage error < 0.1 % of rated parameter plus ±5 discharge
current power error < 3 % of rated parameter plus ±5 discharge
temperature error < ±2 С
Insulation VDE 0160, class 1
Protection type IP 54
working temperature -20 Сto +45 С
Weight about 50 kg (in 19” body, without battery cable)
Dimensions width 400 mm, height 504 mm, depth 242 mm
Free space for exhaust > 50 mm
4.2 Working temperature range
The device operation is guaranteed within the temperature range -20 Сto + 45 С.
The accuracy of the readings of the indicator and printed out discharge and charge parameters
correspond to the above indicated.
The accuracy of output values within the temperature range -20оСto +45 ОСis guaranteed for
2 years since the time of delivery of the device.

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014
13
5 Controls
5.1 General
5.1.1 Indikation
The display of the device аUL 10 is divided into two parts (region 1 and region 2 below).
Region 1
Region 2
The following Figure shows when information each region displays:
Program status: Stage Status Current time
Input, information or operation parameters
Program Status
This line indicates the general condition of the device.
Among other messages there can be: PROGRAM SELECTION, PROGRAM START and PRO-
GRAM COMPLETION
Stage Status
This line indicates the program current stage and description of the program stages in the process of
functioning.
Current time
The time is indicted in the format hours – minutes – seconds
Input, information or operation parameters
All the current parameters are displayed in this region, such as:
- input parameters and data
- Messages about errors in open text
- Operation parameters (current, voltage, etc.) in the process of operation of the battery
- Information about menu execution, temperature indication

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
14 © NorTec Electronics 2014
5.1.2 Keyboard
Functions of keys
Key C = CLEAR
Key B = BREAK
Key P = PRINT
Key E = ENTER
Key * = Special Program
Key = Decimal Point
Key 0-9 = Digits 0-9
Key 4 = Digit 4 corresponds to command "forward"
Key 6 = Digit 6 corresponds to command "backward"
Key 2 = Digit 2 corresponds to command "downward"
Key 8 = Digit 8 corresponds to command "upward"
31
7 9
0
B
BREAK
P
PRINT
C
CLEAR
E
8
4
2
6

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014
15
•to 9 and .
Input of digital data separated by a decimal point.
•ENTER ↵
Confirmation of data input and messages or exit from information windows.
•BREAK
Interruption and /or completion of the current program at any moment of time.
•PRINT
In the process of operation with the battery or upon completion of the program all current
parameters are printed out. In case of a failure an error message can be printed out by hitting the
key PRINT.
•CLEAR
Cancel the last data input.
•4
Return to the previous item in the menu in the mode of program input.
•6
Proceed to the next item in the menu in the mode of program input.

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
16 © NorTec Electronics 2014
5.2 Self-Test
Put the switch POWER ON/OFF (2.1.1а) into the position ON.
The red LED indicator on the front panel (2.1.1b) should light; no voltage in the mains. The Display
is lit.
After voltage is switched on the display should show the following information for 2 seconds
- the rights of the manufacturer
- the device model
- the software version
- the software date
- the check status
Test OK
The test is complete
Concurrently a short sound beep sounds indicating that the device is ready for operatation.
If the self-test detects any failure in the device the following message is displayed:
The appendix lists possible failure messages. These messages are in English, as a rule.
If the device operates without failures the information about the type of the connected battery is to
be input (see item 6.6)
Then a pre-installed program 0-8 to service the battery and the program P and * are selected.
The key B enables to return to the item of selection of the battery type.
COPYRIGHT 2000-2003 BY NORTEC
UL10 V20.108 REVISION 11.10.2003 SELFTEST
FAILURE: EQUIPMENT
KEYBORD

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014
17
6 System adjustment
After self test and selection of the battery type the key * opens the menu to show options of Chang-
ing various parameters of the device. The input data are saved in the energy-independent memory
of the device and remain available when the device is switched on again or when voltage fails in the
mains.
When the key * is hit a menu of system adjustment is displayed in order to select a language of
messages and to select the date and specific time indication.
6.1 Language Selection
By hitting the key 0 the current language selection is confirmed (English by default), use the key 1 to
scan consecutively the available languages. After that the display shows messages in the selected
language. So far the following languages are available in the UL-10 device:
- English
- German
- French
- Russian
(- Dutch: only four languages can be choose!)

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
18 © NorTec Electronics 2014
6.2 Date Input
After the language is selected the time is set.
Date Time
13.07.01 09:20:07
The cursor appears under the first item of the date. When the key ENTER↵ is hit the input data are
saved. The cursor moves to the item of time. The digital keys (0 … 9) serve to enter the current
time. The point is entered by default. Any error in the date input is rejected.
6.3 Time Input
The internal clock is adjusted with digital keys (0 … 9). The colon (separating hours from minutes) is
entered by default. When the input is confirmed by the key ENTER↵ or the last digit of indication of
minutes is entered the display switches over to the main menu.
The counting of seconds starts automatically.

CHARGER / DISCAHRGER UL10 OPERATION MAUNAL
© NorTec Electronics 2014
19
6.4 Print out functions
6.4.1 General
The device is provided with a printer with electronic controls. It enables to register results of any op-
eration with a battery in the form of a printed out acknowledgement. The print function in the menu
can be enabled irrespective of the program input.
6.4.2 Print Equipment
The printer includes the following components:
- a printer body
It is attached to the front panel. The rear face has a 21-pin port for the printing mechanism.
- a printing mechanism with a matrix EPSON printer
- a removable front panel
- normal printing paper 50 mm wide
- 2 knurled head screws to secure the printer
- a self-test start pushbutton
- a color ribbon
- a rear 13-pin connector
- a printer controller
The board BT20-9 controller on the rear face of the printer body inside the device controls printing
functions.
Table of contents
Other nor-tec Batteries Charger manuals
Popular Batteries Charger manuals by other brands

Anker
Anker PowerExtend quick start guide

Chargetek
Chargetek CT500 - 1 installation manual

Tronic
Tronic TNMC 7.5A1 Operation and safety notes

Competition Electronics
Competition Electronics Pit Bull instructions

Watts Clever
Watts Clever SMART instruction manual

SKC
SKC PowerFlex Series operating instructions

Ergotron
Ergotron Zip40 user guide

Bosch
Bosch PLN-24CH12 Installation and operation manual

Black & Decker
Black & Decker Smart Battery Charger User's manual & warranty information

EVM
EVM SP028LN Owner & user manual

EAL
EAL EN DURO TECHNOLOGY 16609 operating instructions

GP
GP ReCyko Pro D461 instruction manual