Page 2of 64 NDF 35-180 11/12
Contents
INTRODUCTION........................................................................................................................................ 3
Operating Mode........................................................................................................................................ 4
Site Conditions And Services..................................................................................................................... 10
Unpacking & Assembly ............................................................................................................................. 13
INSTALLATION....................................................................................................................................... 17
BURNER CONTROL AND OPERATION............................................................................................... 17
Air Controls:........................................................................................................................................... 17
Gas Controls:.......................................................................................................................................... 18
Oil Controls –Twin Pressure Jet Oil Burners........................................................................................ 25
Oil Controls –Single Spill Back Oil Burners ........................................................................................ 26
Control Panel.............................................................................................................................................. 32
Modulating Controller............................................................................................................................ 36
Commissioning........................................................................................................................................... 39
Inspection ............................................................................................................................................... 39
Oil Commissioning................................................................................................................................. 40
Gas Commissioning................................................................................................................................ 44
Final commissioning stages - oil & gas.................................................................................................. 47
Fuel Changeover Procedure ................................................................................................................... 48
Routine Safety Checks ........................................................................................................................... 49
Routine Maintenance.................................................................................................................................. 50
Fault Finding .............................................................................................................................................. 51
Spare Parts.................................................................................................................................................. 53
APPENDIX ................................................................................................................................................ 54
Oil Commissioning Sheet....................................................................................................................... 58
Gas Commissioning Sheet...................................................................................................................... 59
Performance Envelopes.............................................................................................................................. 60
IMPORTANT-SAFETY
IT IS ESSENTIAL THAT THE FOLLOWING INSTRUCTIONS AND ADJUSTMENTS ARE CARRIED OUT BY QUALIFIED ENGINEERS THAT
ARE EXPERIENCED IN FORCED DRAUGHT GAS BURNER COMMISSIONING.IN THE U.K. IT IS A LEGAL REQUIREMENT THAT
ANYONE WORKING ON GAS INSTALLATION,AS DEFINED IN THE “GAS SAFETY (INSTALLATION &USE)REGULATIONS 1994” IS
GAS SAFE REGISTERED (OR WHATEVER REPLACEMENT SCHEME IS IN PLACE AT THE TIME). THE COMPOSITION OF THE FUEL IS
CRITICAL TO THE CORRECT OPERATION AND SAFETY OF THE EQUIPMENT.OPERATION WITH FUELS CONTAINING EVEN TRACE
ELEMENTS OF CERTAIN SUBSTANCES CAN GIVE RISE TO HAZARDOUS CONDITIONS IF YOU HAVE ANY DOUBTS ABOUT THE
SPECIFICATION OF THE FUEL MEETING OUR REQUIREMENTS YOU SHOULD CONSULT YOUR SUPPLIER BEFORE OPERATION.
THE MANUFACTURER CANNOT BE HELD RESPONSIBLE FOR ANY CONSEQUENTIAL DAMAGE,LOSS OR PERSONAL INJURY AS A
RESULT OF FAILURE TO FOLLOW THESE INSTRUCTIONS,OR AS A RESULT OF MISUSE.
EUROPEANBOILEREFFICIENCYDIRECTIVE(B.E.D.)
ALL BURNERS AND BOILER BODIES MARKETED SEPARATELY SHOULD COMPLY WITH EN676 (GAS BURNERS)AND EN303
(HEATING BOILERS). BURNER ADJUSTMENTS MUST BE MADE IN ACCORDANCE WITH BOILER MANUFACTURERS’INSTRUCTIONS,
AND THESE MUST INCLUDE FLUE GAS TEMPERATURES,AVERAGE WATER TEMPERATURE,AND CO2OR O2CONCENTRATION.