
©2020 Nystrom, Inc.
REV JUL/2020
Installation, Operation & Maintenance
Elastomeric Exterior Wall System Expansion Joint
Model(s):EW/200MB/300MB/400MB/500MB/600MB
4. Position aluminum extrusions and mark hole locations. Drill holes through aluminum flange and into
walls for 3/16” @ 18” on center (Fig. 2).
5. Secure aluminum extrusion to wall with 3/16” Tapcon screws at
18” on center
6. Before installing moisture barrier, apply Sikaflex 1A adhesive to
rear locking cavities of the aluminum extrusions. Ensure full
engagement of locking lug.
7. Before installing visual seal apply Sikaflex adhesive into the front locking cavities of the aluminum
extrusions (1A Fig. 3). Ensure full engagement of locking lug.
8. Utilizing roller tool apply pressure directly over locking lug to ensure
proper engagement of seal lug (Fig. 4).
Visual Seal Field Splice Procedures (Fig. 5)
1. Cut ends of the visual seal, with a sharp knife, to the desired angle
using a formed jig with miter box {supplied by contractor). Ensure
cuts are clean, straight and square.
2. Cleans ends of seal with a solvent to remove any foreign
material.
3. Reassemble mitered ends of adjacent seals utilizing the
reinforcing corner clips (for go transitions only}.
4. Apply adhesive as specified by the manufacturer to one of the two seal
surfaces to be bonded.
5. Apply pressure bringing the two surfaces in tight contact immediately upon completing application of
the adhesive. Hold in place for approximately one to two minutes to allow adhesion.
6. Re-check quality of all miters or splices and apply additional adhesive if required to ensure proper
miter or
7. splice.
8. Contact manufacturer for clarification of above procedure (if
required) prior to proceeding with splicing visual seal profile. It is
usually recommended to allow 15 minutes time before installing
spliced seal. Care shall be exercised as a result that it takes 24
hours for adhesive to fully cure.