6. Connect PC to Gateway
a. USB to Serial Adapter (SX1000-CC9)
b. Gateway Configuraon Cable (SX1000-CC1)
7. Idenfy COM Port for use in BreeZ® (Device Manager)
8. Select a Gateway in BreeZ® Project Tree
9. Update Gateway with BreeZ® Project File
10. Confirm Gateway “Configuraon Download OK” in
Build Tab Window in BreeZ®
11. Save Project File onto Gateway (For Backup)
4. Configuraon Sequence - connued2. Required Items
- DH1 - Base Unit Wireless Gateway
- External Power Source for Base Unit (9-30 VDC)
- Antenna for Gateway (Bulkhead, Omni, or Yagi)
- Antenna Cable (N to MMCX Connector)
- N to N Antenna Cable and Lighng Arrestor (Oponal)
- External Enclosure for Base Unit (NEMA)
- DIN Rail (35 mm)
- USB to Serial Adapter (SX1000-CC9)
- Gateway Configuraon Cable (SX1000-CC1)
- BreeZ® Configuraon Soware v5.0 or Higher
- PC
- Screwdriver Set + Technician’s Screwdriver
- Any Addional Tools for Installaon
- RS485 I/O Expansion System (Oponal)
CAUTION: Field wiring connecons shall be made in accordance
with Arcle 504 of the Naonal Electrical Code, ANSI/NFPA70.
CAUTION: The Base Unit must be installed within an enclosure
that requires a tool to access. This is to prevent inadvertent
disconnecon of any of the power wiring, signal wiring or
communicaon cables.
ATTENTION: Le Base Unit doit être installé dans une enceinte qui nécessite
un oul d'accès. Ce est pour éviter toute déconnexion accidentelle de l'un
des câbles câblage de puissance, câblage ou de communicaon signaux.
WARNING: Ensure installaon of the Gateway meets applicable
state and naonal electrical code requirements. The installaon
of the Base Unitshould only be performed by a qualified installer or a
factory representave.
AVERTISSEMENT: Veiller à l'installaon de la passerelle répond Etat et
des exigences naonales de code de l'électricité. L'installaon de la
Base Unit ne doit être effectuée par un installateur qualifié ou un
représentant de l'usine.
WARNING: To prevent ignion of flammable or combusble
atmospheres, disconnect power before servicing.
AVERTISSEMENT: Pour éviter l'inflammaon d'atmosphères inflammables
ou combusbles, débrancher l'alimentaon avant l'entreen.
WARNING: EXPLOSION HAZARD – Substuon of components
impair suitability for Zone 2.
AVERTISSEMENT: RISQUE D'EXPLOSION - Le remplacement de composants
nuire à la conformité pour la Zone 2.
WARNING: EXPLOSION HAZARD – Do not separate/disconnect
connectors when energized.
AVERTISSEMENT: RISQUE D'EXPLOSION - Ne pas séparer / débrancher les
connecteurs lorsque excité.
WARNING: EXPLOSION HAZARD – Do not service when an
explosive atmosphere is present.
AVERTISSEMENT: RISQUE D'EXPLOSION - Ne pas service lorsque une
atmosphère explosive est présente.
WARNING: EXPLOSION HAZARD – Do not use reset switch in
hazardous area.
AVERTISSEMENT: RISQUE D'EXPLOSION - Ne pas uliser le commutateur
de réinialisaon en zone dangereuse.
1. Before You Begin
1. Download and install latest BreeZ® Soware v5.0 or
higher to a PC (see secon 3)
2. Check for latest Base Unit Firmware on Download Center
3. Create a BreeZ® Project File
*4. If upgrading Firmware, follow these instrucons:
a. Physically Connect Gateway to PC
b. Supply power
c. Open Connect screen and click “Flash”
d. Locate new Firmware file and click “Open”
e. DO NOT DISCONNECT OR TURN POWER OFF while
upgrading Firmware (It may take a few minutes for
upgrading process to finish)
f. Wait unl LED turns off
5. Power up Gateway (9-30Vdc) and wait unl boot-up
sequence is complete
(LED will turn off once boot-up is complete)
3. Configuraon Sequence
80-3103-001_J
This guide provides basic informaon to assist you in quickly
geng started. Go to www.OleumTech.com to download the
full User Guide for detailed installaon and other informaon.
5. Installaon Sequence
1. Install Gateway inside a NEMA enclosure
a. Remove Cover Using Two Top Screws.
b. Adjust and Tighten DIN Rail Clamp
c. Reaach Cover
2. Follow best grounding pracces
3. Setup and connect an Antenna with Lightening Arrestor
to Gateway
4. Connect Gateway to third-party Serial device(s)
5. Power up Gateway
6. Power up/reboot any impacted sensors/devices if necessary
7. Verify RF and data communicaons
a. Use Modbus Register Polling and Write features in BreeZ®
b. Verify communicaon from third-party device(s) or
SCADA system
QUICK START GUIDEBASE UNIT - WIRELESS GATEWAY (DH1)