
T
ABLE OF CONTENT
Revision 1.3 - 2 -
T
ABLE OF CONTENT
T
ABLE OF CONTENT
...................................................................................................................................2
1 Safety Information ....................................................................................................................4
2 Gate Overview and Components............................................................................................. 5
3 General information: ................................................................................................................6
4 Installation Dimensions ...........................................................................................................8
4.1 Installation Dimensions 800mm arm ILP – SQUARE TUBE MAIN FRAME................... 9
4.1.1 Possible Mount Plate Modifications for Short Over Hang.................................9
4.2 Bed Height Ranges: Unloaded Truck 800mm Arm – SQUARE TUBE........................... 10
4.3 Installation Dimensions 800mm arm ILP – ROUND TUBE MAIN FRAME..................... 11
4.4 Bed Height Ranges: Unloaded Truck 800mm Arm........................................................12
4.5 Installation Dimensions 900mm arm ILP .......................................................................13
4.6 Bed Height Ranges: Unloaded Truck 900mm Arm........................................................14
5 Chassis and Body Preparation................................................................................................ 15
5.1 Bed Extension & Dock Bumper Installation ................................................................... 15
6 Gate and Platform Installation .................................................................................................16
6.1 Frame Installation .........................................................................................................16
6.2 Gate Installation Using Liftarm Pins (Platform Not Installed) ......................................... 18
6.2.1 Platform Installation.........................................................................................19
6.3 Tension on the spring ...................................................................................................20
7 Electrical Installation................................................................................................................21
7.1 Main Power Connections ..............................................................................................21
7.2 Circuit Breaker ..............................................................................................................21
7.3 UP/DOWN Switch Installation .......................................................................................22
7.3.1 Roll up door setup ...........................................................................................22
7.3.2 Swing Door setup............................................................................................23
7.4 ON/OFF Switch............................................................................................................. 24
7.5 Remote Hand Control Installation (Optional)................................................................. 24
7.6 Main power supply wiring..............................................................................................25
7.7 Electrical schematic of gate...........................................................................................26
8 Lubrication and Final Inspection............................................................................................. 27
8.1 Hydraulic Schematic and Decal Placement................................................................... 28
8.2 Decal Placement and Inspection...................................................................................29
9 Check Off Sheet........................................................................................................................ 31