Panasonic Factory Line 20 User manual

2012
©
PanasonicCorporation PowerComponentsBusinessUnit
1048,kadoma,kadoma,oosaka,571-8686,japanTelephone:+81-06-6908-1131
Instruction Manual Factory Line 20
For keeping
■Be sure to read this Instruction Manual before use, and then properly use the product.
■Ask an electrical contractor for troubleshooting and maintenance such as expansion of this product. In
such case, be sure to pass these Instruction and Installation Manuals to the contractor.
■Mounting additional outlet plug requires no qualication as an electrical worker.
Note:Before mounting/dismounting or relocating plugs, be sure to turn OFF power supply
■Be sure to keep this Instruction Manual for future reference, and be sure to hand this manual to user.
There is longevity in Factory Line 20, and a standard use period is ten years. It becomes impossible to use nally due
to the deterioration of internal if it uses it exceeding the service life. Deterioration advances every year though it diers
in the environmental condition and the service space. In order to use the factry-line for a long time,Please contact the
specialist in the construction shop etc. when it checks, and trouble is found, and receive the check by the specialist in
the construction shop etc. once every three years. Please be sure to observe the following, and the check.
The precautions describe what must be observed not to harm humans nor cause property damage.
Safety precautions
Be sure to observe the precautions fully
Warning
● Do not modify to products in any way.
may cause re, electric shock or damage due to falling
of equipment.
● Do not install parts of incompatible.
may cause re, electric shock or damage due to falling
of equipment.
● Do not mount any bracket other than dedicated
bracket to the Factory Line 20, or do not apply
weight exceeding that of the dedicated bracket
(allowable suspension load of hanger: 10 kg) to
the Factory Line.
Doing so will result in a drop.
● Do not install the illuminator that becomes a high
temperature like the white heat ball etc.
Not doing so will result in an electric shock, a re.
● If any abnormality occurs, immediately turn OFF the
power supply, and then contact your electrical worker
to take necessary actions.(In such case, be sure to
pass Instruction and Installation Manuals )
Not doing so will result in an electric shock, a re, or a drop.
● Use the rated voltage within the load capacity that is
always displayed.
Not doing so will result in a re.
● Use Fluorescent lighting plug below a permissible load.
Not doing so will result in a re, or a drop.
Caution
●
this product is dedicated to ordinary indoor use, Do not
use it at the place which is subject to the inuence of heat,
such as the upper part of a heater, or a place with moist
place and vibration, which receives blowing in of rain, and
a moist,,where corrosive gas, where the smoke rises
・A place with moist place and vibration
・
A place which receives blowing in of rain, and a moist place
・
A place where corrosive gas, where the smoke rises
・The place which is subject to the inuence of
heat, such as the upper part of a heater
Not doing so will result in an electric shock, a re, or a drop.
● Do not slide putting the plug in the duct
Poor contact will cause a re.
● Do not slide putting the plug in the duct
Not doing so may result in an electric shock or a re.
● Do not pull the plug cable.
Doing so may result in faulty connection, thus leading to
a re.
● Before check for the product, be sure to turn OFF
the power supply.
Not doing so may result in an electric shock.
● If an earthquake occurs, turn OFF the power supply,
and then ensure that thorough mounting strength is
provided.If NOT, consult with your electrical contractor.
In such case, be sure to pass these Installation and
Instruction Manuals to the contractor.
Not doing so will result in a drop.
● Use the range of -10 ℃ ~ 40 ℃ ambient
temperature
The use without of range, burn, or cause a re.
● Attach the plug in the right direction.
If it attaches to reverse, it will become a cause of an electric
shock, a re, and fall.
●Do not apply directly weight to an outlet of the outlet
plug and the reeler outlet plug.
Not doing so will result in an electric shock, a re, or a drop.
● Use this product for the transmission of information,
The transmission performance might be deteriorated
because of the signal decay in connected part.
● There is longevity in Factory Line 20, and a standard
use period is ten years.
Even if abnormality is not found in externals, the check
exchange is done internally because it is deteriorated.

■ Be sure to read this Instruction Manual before installation, and then properly install the product.
■ Installing this product requires the qualication as an electrical worker. Be sure to ask a contractor
Warning
● Do not make any modication to this product.
Doing so will result in an electric shock, a re, or a drop
● Do not use it at the place which dew
condensation generates by a quick temperature
change like the wind of an air-conditioner.
Doing so will result in an electric shock, a re, or a drop
● Do not use it in places with combustion gas.
cause of the explosion.
●
Install this product in accordance with the Electrical Equipment Technical
Standards (Law) and the Internal Wiring Regulations. Use proper
overcurrent circuit breakers on the primary side ofpower supply. Choose a
size of cable used to supply power to Factory Line suitable for overcurrent
circuit breakers to protect the branch circuit and for the rated current.
Not doing so will result in an electric shock, a re, or a drop.
● Before check for the product, be sure to turn OFF the
power supply.
Doing so may result in an electric shock .
● Make below the weight that can allow the weight hung to
the duct.
Not doing so will result in a drop.
Caution
●
this product is dedicated to ordinary indoor use, Do not
use it at the place which is subject to the inuence of heat,
such as the upper part of a heater, or a place with moist
place and vibration, which receives blowing in of rain, and
a moist,,where corrosive gas, where the smoke rises
・A place with moist place and vibration
・A place which receives blowing in of rain, and a
moist place
・A place where corrosive gas, where the smoke
rises
・ The place which is subject to the inuence of
heat, such as the upper part of a heater
Not doing so will result in an electric shock, a re, or a
drop.
● Do not install the Factory Line duct passing
through building structure
Doing so may result in a re.
● Do not slide putting the plug in the duct
Poor contact will cause a re.
● During construction,Do not give a shock, such as
dropping on a product, or hitting.
It may be damaged.
● Use the range of -10 ℃ ~ 40 ℃ ambient temperature
The use with out of range, burn, or cause a re.
● For cutting work, wear protective equipment such as
safety glasses.
Not doing so may cause you to injure your nger.
● After cutting, deburr edges using a le.
Not doing so may cause you to injure,so may result in a re.
● When cutting the ducts, use a metal hacksaw(hand type)
and cut with the opening in the duct facing downward as
shown in the gure.
If a power saw is used, the insulation cladding or ground
terminals could be scraped or burned.
● When cutting the ducts, cut at right angles.
Not doing so will result in an electric shock, a poor contact.
● Do not mount the Factory Line 20 upward, when installing
the horizontal towards, Where there is no one easy touch
it (eg where more than 1.8 m) and duct cover (sold
separately) that must be used.
Failure to install a duct cover, causing a re due to ingress of
dust.
● Insert the connecting component in a duct certainly and
tighten the set screw
Not doing so will result in an electric shock, a re, or a drop.
● When connect the wires to the feed-in cap, insert the
electrical wires until they are visible in the peep hole.
Not doing so will result in an electric shock, a re.
Installation Manual Factory Line 20
The precautions describe what must be observed not to harm humans nor cause property damage.
Safety precautions
Be sure to observe the precautions fully

●
At least once a year, please do self-inspection due to safety check sheet. If any abnormality occurs, immediately contact electrical worker.
●
Receive the check by the specialist in the construction shop etc. once every three years.
●
when will use beyond 10 years after installation, At least once a year, please do inspection due et. At least once a year at least, please accept
inspection by a electrical worker to be sure. and When it passes for 15 years after installation, Please stop use promptly and exchange it.
■ Safety Check Sheet (Self-check):At least once a year
Safety Check Sheet & Maintenance Sheet
Contents of inspection Result
Duration
of use
1Less than 10 years of use?
More than 15 years of use?
conditions of use
1Are there condense on the ducts?
2Are there stains or discoloration on
the inside of the duct?
3Are there deposits of dust adhering
to the inside of the duct?
4Are there an abnormal looseness or
gap?
5Are the connection parts of duct
straight ?
6Are there such a strange odor or
smell burnt?
Contents of inspection Result
conditions
of use
7Did blocked the earth leakage breakers?
8Had the power supply of the apparatus
linked to a duct turned on and o ?
A title Check
day Y D M
The check
person in charge
Result
○:Normal
Measures
○:Exchange required
●:
Finished with exchange
×:Abnormality
△:Adjustment required
▲:
Finished with adjustment
A title Contents of inspection Remedy Result
Measures
Duct
Is there condensation? Eliminate the cause of condensation
Mount the duct to the ceiling side directly, Are there
loose the screw? Retighten
Are there discoloration or deformation in the plastic
of the duct and Change it.
Are there adhesion and deposition of dust in the inside of a duct?
Remove the dirt
Is a straight line connecting duct? Attachment is improved so that it may become a
straight line.
Is the thing which is not an exclusive plug attached to the duct?
Exchange plugs.
The parts to
connect
・
feed-in cap
・
Center-feed-in joiner
・Joiner
・Joiner L
・End cap
Are there any slack of a set screw ? Retighten
Is the duct insucient to merge ? Iserts enough to the back.
Is cover detached? Replace the cover
Are there discoloration or deformation in the plastic? Change it.
Are there breakage and a crack? Change it.
Are there loose the terminal screw? Retighten
Plug
Correct direction of the attachment to the duct? Attach after checking direction.
Are there loose the terminal screw? Retighten
Is the plastic of the plug discoloring and changing? Change it.
Are there breakage and a crack? Change it.
Is the electric wire of the plug pulled? takes a little longer
Hanger Are there loose hanger nat? Retighten
Are there loose hanger cap? Turns to the right until it locks.
All Insulation resistance: 0.1 M Ω or more
voltage to ground 150 V or less
Do pertain to your particular place and cause
abnormal
Caution
● Action against abnormal, turn o the power
before, checks by the electrical worker.
Not doing so will result in an electric shock, a re, or a
drop.
2.Where to Find
discoloration Duct
Where to Find:
The plastic part near
the conductor
(Conductor : 2 parts)
※ Gray area
■
Maintenance Sheet(The contents of check by electrical worker)
: Least once every three years during and after completion
3

2
1Installationoftheducts
・Use the tapping screws included with the
ducts to mount the ducts directly to the ceiling(or wall).
・Use all of the mounting holes.
・Screw one screw partway in, fit the elongated hole of
the duct onto that screw, and then screw the other
screw in through the round hole in the duct. This allows
the installation to be completed by one person.
Mountingthepipe-suspendedhangers1
・Use this procedure if the Factory Line 20 ducts
are to be suspended from pipes, If necessary, the
pipes can be shortened to the required length by
cutting them at the flange end.
・The standard interval for mounting of the hangers is 1 m, and the maximum
interval is 1.5 m. Be sure to mount securely to a structural member.
Flange mounting dimensions
Flange
Standard 1 m, maximum 1.5 m
Pipe-suspended hanger
Factory Line 20 duct
Structural
member
Ceiling
materialt
66.7
Installationtheflanges
the pan head
machine screw
figure 1
Pipe mounting hole
Flange
Securing screw
Flange cover
Dismount
figure 2
Mount
●
Adjust the length the pipe-suspended hangers after mounted
・
In order to adjust the length after the pipe-suspended
hangers have been mounted to a structural member,
loosen the securing screw, remove the pipe, and cut
the pipe at the flange end.
●
After cutting, drill a hole
(
φ
5.5 mm), mount the
flange, and then mount a
pipe to the flange.
Unit : mm
Mountingtheductsdirectlytotheceiling
Supportspacingfortheduct
1.Turn the flange cover to the left to remove it.
2.Use the wood screw or tapping screw ,then mount the flange to a
structural member.
3.Align the pipe mounting hole of the pipe suspension hanger with the
position of the pan head machine screw to put the pipe in the flange,
and then fasten the pan head machine screw and the setscrew.
(Fasten the pan head machine screw through the pipe mounting hole.)
4.Turn the flange cover to the right to mount it back in its
original position.
●
Ensurethestrengthofbuildingstructuresenoughtosupport
thehangingweight(amaximumof10kgpersupport).
Notdoingsomaycausethehangertodrop.
●
Usetwoormorepiecesofhangerforoneduct.
IItwillbecomeacauseoffallifitdoesnotso.
●
Topreventtheductsfrommeandering,alignthehangercenters.
Notdoingsomaycausethehangerstodrop.
Caution
●
Securelyfastenthewoodscrewortapping
screw,panheadmachinescrew,andsetscrew.
Caution
Notes
●
Donotattachtheplugunitwiththeplacewhere
thetappingscrewsweremounted.
Round hole
Elongated hole
Screw in
partway.
Screw
Duct
250
250
500 250
750 250
750 1000 750
Round hole (Mounting hole)
Elongated hole
L=1m
L=2m
L=3m
250
21.5
φ5.5
Fixtheducttobuildingstructurefirmly.
Itwillbecomeacauseoffallifitdoesnotso.
●
Caution
InstllationProcedure
33
17
1919
Ceiling
Tapping screw(4×25)
4

3 4
Mountingthepipe-suspendedhangers2
Loosen the cap securing screw
and turn the cap to the left to
remove it from the hanger.
Spread apart the hanger and
match the polarity indication
on the duct with the polarity
indication on the hanger.
Spread apart.
Spread apart.
Factory Line 20 duct
Mount the hanger from
the polarity indication
side of the duct.
Match the polarity
indications.
Fit the duct into the hanger,
and then turn the cap to the
right and tighten the securing
screw in order to secure the duct.
Tighten.
Mountingthepipe-suspendedhangers3
Supplying power via the pipe-suspended hangers(method for
bringing in the power supply)
Route the cable from the ceiling into the pipe. When doing this,
it is easier if the cable is passed through the pipe before
securing the Factory Line 20 duct in the hanger.
Following the same procedure for Step , fit the duct in the
hanger, and then fix it with the cap.
・Use single-conductor cables of 1.6 or 2.0 m㎡in size.
●Makewireconnectionswithcarefulattentionso
thatcableswillnotbebittenordamaged.
Notdoingsomayresultinelectricshocksorfire.
Caution
●Turnthecapuntilitisfullylocked.
Notdoingsomaycausetheducttodrop.
Caution
1. 1.
2.
2.
3.
3
Cap
Pipe
Hanger
Cable routing hole
Cable
Factory Line 20 duct
push up
Cable
fit the cap
Cap
Loosen
Pipe
Hanger
Polarity indication
5

5
hangers(withbolt)(withoutbolt)instalation
hangerinstalation
・The standard interval for mounting of the hangers is 1 m, and the maximum interval is 1.5 m.
・Be sure to mount the hanger bolts securely to a structural member.
・DH2652 hangers (without bolt) come without hanger bolts.
・To mount the DH2652 hangers, Use M8 bolts. Standard 1m, maximum 1.5 m
hanger bolt
Factory Line 20 duct
Hanger
Installationoftheduct
Loosen the cap securing screw and
turn the cap to the left to remove it from
the hanger.
Spread apart the hanger and match the
polarity indication on the duct with the
polarity indication on the hanger.
Fittheductintothehanger,andthenturn
thecaptotherightandtightenthesecuring
screwinordertosecuretheduct.
●Ensurethestrengthofbuildingstructuresenough
tosupportthehangingweight(amaximumof10
kgpersupport).
Notdoingsomaycausethehangertodrop.
●Touselonghangerbolts,mounttheseboltsusing
swaybraces.
●
Usetwoormorepiecesofhangerforoneduct.
Itwillbecomeacauseoffallifitdoesnotso
●Topreventtheductsfrommeandering,alignthe
hangercenters.
Notdoingsomaycausethehangerstodrop.
Caution
1. 2. 3.
●Turnthecapuntilitisfullylocked.
Notdoingsomaycausetheducttodrop.
Caution
cap
Loosen
hanger bolt
Hanger
Polarity indication
Spread apart. Spread apart.
Factory Line
20 duct
Match the polarity
indications.
Mount the hanger
from the polarity marking side
Tighten
①
②
6 7
8
Connectingtheducts
・Use a joiner to connect two ducts together.
・Be sure to match the polarities of the ducts
and the joiner and secure by tightening the
set screws.
Installingthefeed-incap
Attachingtheendcap
・Fit the cap onto the end of the duct and secure it by tightening the set screw.
Caution
●Anendcapmustbeattachedontotheendoftheduct.
Doingsomayresultinanelectricshock.
●Securelyfastenthesetscrew.(Torquethesetscrewtonot
lessthan0.98N・m〜1.32N・m)
Caution
Duct
Set screw
Set screw
Polarity indication
(ground side)
Joiner
Duct
Long Short
Opening
Ground terminal
Duct
(Cutting direction)
Joiner
■Connectingtheducts
■Procedureforprovidingknock-outpart
●Fitthefeed-incapintotheductandtighten
thesetscrewtosecureit.
●DeburrthecutsurfaceusingaCableKnife.
Connectionreleasebutton
Electricwire
loadingslot
Polarity
indication
Groundterminalthepeephole Wire
Holdingpart
ofafastningband
Setscrew
Duct
cover
Duct
cover
Duct
■
Connectionofpowersupply,removeaboutelectricwire
●
Striptheendsoftheelectricalwiresinaccordancewiththe
strippinggaugeshownontheinsideofthecover,andthen
inserttheelectricalwiresuntiltheyarevisibleinthepeephole.
●Todisconnecttheelectricalwires,pullthemoutwhileusing
ascrewdriveroryourfingertopresstheconnectionrelease
button.
End cap
Duct
Set screw
●Duringconstruction, Donotgiveashock,
suchasdroppingonaproduct,orhitting.
Itmaybedamaged.
●Combinethetipofaductandconnectcertainly.
●Connectastraightlybothof theduct
●Securelyfastenthesetscrews.(Propertorque:
0.98N・m〜1.32N・m)
Doingsomayresultinanelectricshockorafire.
●Whencuttingtheducts,useametal
hacksaw(handtype)andcutwiththeopeningin
theductfacingdownwardasshowninthe
figure.
Ifapowersawisused,theinsulationcladdingor
groundterminalscouldbescrapedorburned.
●Aftercutting,ifthegroundterminalprotrudes
slightly,correctit.
●Removeanycuttingchipsorburrsfromthecut
surface.
Doingsomayresultinanelectricshockorafire.
Caution
①ForcablesnotlargerthanVVFof2㎟in
sizewiththreecoresorless,removethe
shadedarea.
②ForcablesnotlargerthanVCTof3.5㎟in
sizewiththreecoresorless,removethe
shadedarea.
●Duringconstruction,Donotgiveashock,such
asdroppingonaproduct,orhitting.
Itmaybedamaged
●Connectthefeed-incapandtheductlinearly.
●Securelyfastenthesetscrews.(Propertorque:
0.98N・m〜1.32N・m)
●Usingthesingle-wirecableis1.6mmor2mm,
●Besuretouseaninsulatedpin
terminal(Insertionlength:Itislongerthan
15mmandislessthan21mm.)whenusea
stranded-conductorcable.
●Useatriplexcableandtightenthecoiltothe
groundterminaltoconnectonecable.
(Propertorque:1.2N・m〜1.5N・m)
Doingsowillresultinanelectricshock,afire.
●Afterwireconnection,Bindthecablewithwire
ties,etc.nottoapplytensiontotheterminal.
Doingsowillresultinafire.
6

6 7
8
Connectingtheducts
・Use a joiner to connect two ducts together.
・Be sure to match the polarities of the ducts
and the joiner and secure by tightening the
set screws.
Installingthefeed-incap
Attachingtheendcap
・Fit the cap onto the end of the duct and secure it by tightening the set screw.
Caution
●Anendcapmustbeattachedontotheendoftheduct.
Doingsomayresultinanelectricshock.
●Securelyfastenthesetscrew.(Torquethesetscrewtonot
lessthan0.98N・m〜1.32N・m)
Caution
Duct
Set screw
Set screw
Polarity indication
(ground side)
Joiner
Duct
Long Short
Opening
Ground terminal
Duct
(Cutting direction)
Joiner
■Connectingtheducts
■Procedureforprovidingknock-outpart
●Fitthefeed-incapintotheductandtighten
thesetscrewtosecureit.
●DeburrthecutsurfaceusingaCableKnife.
Connectionreleasebutton
Electricwire
loadingslot
Polarity
indication
Groundterminalthepeephole Wire
Holdingpart
ofafastningband
Setscrew
Duct
cover
Duct
cover
Duct
■
Connectionofpowersupply,removeaboutelectricwire
●
Striptheendsoftheelectricalwiresinaccordancewiththe
strippinggaugeshownontheinsideofthecover,andthen
inserttheelectricalwiresuntiltheyarevisibleinthepeephole.
●Todisconnecttheelectricalwires,pullthemoutwhileusing
ascrewdriveroryourfingertopresstheconnectionrelease
button.
End cap
Duct
Set screw
●Duringconstruction, Donotgiveashock,
suchasdroppingonaproduct,orhitting.
Itmaybedamaged.
●Combinethetipofaductandconnectcertainly.
●Connectastraightlybothof theduct
●Securelyfastenthesetscrews.(Propertorque:
0.98N・m〜1.32N・m)
Doingsomayresultinanelectricshockorafire.
●Whencuttingtheducts,useametal
hacksaw(handtype)andcutwiththeopeningin
theductfacingdownwardasshowninthe
figure.
Ifapowersawisused,theinsulationcladdingor
groundterminalscouldbescrapedorburned.
●Aftercutting,ifthegroundterminalprotrudes
slightly,correctit.
●Removeanycuttingchipsorburrsfromthecut
surface.
Doingsomayresultinanelectricshockorafire.
Caution
①ForcablesnotlargerthanVVFof2㎟in
sizewiththreecoresorless,removethe
shadedarea.
②ForcablesnotlargerthanVCTof3.5㎟in
sizewiththreecoresorless,removethe
shadedarea.
●Duringconstruction,Donotgiveashock,such
asdroppingonaproduct,orhitting.
Itmaybedamaged
●Connectthefeed-incapandtheductlinearly.
●Securelyfastenthesetscrews.(Propertorque:
0.98N・m〜1.32N・m)
●Usingthesingle-wirecableis1.6mmor2mm,
●Besuretouseaninsulatedpin
terminal(Insertionlength:Itislongerthan
15mmandislessthan21mm.)whenusea
stranded-conductorcable.
●Useatriplexcableandtightenthecoiltothe
groundterminaltoconnectonecable.
(Propertorque:1.2N・m〜1.5N・m)
Doingsowillresultinanelectricshock,afire.
●Afterwireconnection,Bindthecablewithwire
ties,etc.nottoapplytensiontotheterminal.
Doingsowillresultinafire.
7

9Mountingcenterfeed-injoiners
●During construction, Do not give a shock, such as
droppingonaproduct,orhitting.
Itmaybedamaged.
●Connecttheplugofjoinerandtheductlinearly.
●Usingthesingle-wirecableis1.6mmor2mm.
●Securelyfastenthesetscrews.(Propertorque:0.98
N・m〜1.32N・m)
Doingsomayresultinanelectricshockorafire.
●Useatriplexcableandtightenthecoiltotheground
terminaltoconnectonecable(Propertorque:1.2N・m〜
1.5N・m).
Doingsowillresultinanelectricshock,afire.
Connectiontoduct
Powersupplyconnection
Duct
Duct
Polarity indication(ground side) Polarity indication
(ground side)
Terminal screw
(plated)
Grund terminal(M4)
Set screw Set screw
Caution
10
MountingJoinerL
Connectiontoduct
・To connect the duct with the joiner L, be sure to align the Polarity
indication(ground side) with each other.
・Only to make connection, the cover needs not to be dismounted.
Powersupplyconnection
・To make power supply connection, wind the power supply cable
around the terminal screw.
・To make power supply connection, connect the power supply
cable of the grounded side to the Polarity indication(ground side)
(the terminal screw of which is plated).
Caution
Set screw
Polarity indication
(ground side)
Polarity indication
(ground side)
Duct
Duct
Grund terminal
(M4)
Terminal screw
(plated)
・To connect the duct with the center feed-in joiner, be sure
to align the Polarity indication(ground side) with each other.
・Only to make connection, the cover needs not to be
dismounted.
・To make power supply connection, wind the power supply
cable around the terminal screw.
・
To make power supply connection, connect the power supply
cable of the grounded side to the polarity side (the terminal
screw of which is plated).
●Duringconstruction,Donotgiveashock,suchas
droppingonaproduct,orhitting.
Itmaybedamaged
●Connecttheplugofjoinerandtheductlinearly.
●Usingthesingle-wirecableis1.6mmor2mm.
●Securelyfastenthesetscrewsandtheterminal
screws.(Propertorque:Setscrew0.98N・m〜1.32
N・mTerminalscrew:1.2N・m〜1.5N・m)
Doingsowillresultinanelectricshock,afire.
●Thedivisionmethodlookatthebackofacover
accordingtoablockofacircuit.
●Useatriplexcableandtightenthecoiltotheground
terminaltoconnectonecable(Propertorque:1.2N・
m〜1.5N・m).
Doingsowillresultinanelectricshock,afire.
8

12
11
Mountingaterminalplug
Connectionoftheelectricalwires
Remove the set screws to remove the cover.
Loosen the cable clamp securing screws and insert the
electrical cableinto the cover.
Connect the electrical wires to the terminal board by either
using crimp terminals or by winding the wires around the
terminals.
Fit the cover into the body and secure it by tightening the set
screws.
Tighten the cable clamp securing screws to secure the
electrical cable.
Mountingreeleroutlet
Dismountingplug
・Pull up the plug lever, and then rotate it counterclockwise by
90 degrees.
Up-and-downhandlingtheoutlet
Retainingthecapoffixtureused
・Hitch the cord on the cord hook of the outlet to use the fixture.
・To mount the reeler outlet, pull down the plug lever, andthen
rotate it clockwise by 90 degrees.
Procedureformountingand
usingreeleroutletplug
●
Securelyfastentheterminalscrews.
(Propertorque:0.8N・m〜1N・m)
Doingsomayresultinafire.
●
Donotslidetheplugwithhavingcomeintheduct.
Doingsomayresultinfaultyconnection,thusleadingtoafire.
Caution
Notes
●
Donotattachtheplugunitwherethetappingscrewisused
theductdirectiy
Notes
●Donotattachtheplugunitwherethetapping
screwisusedtheductdirectiy
1.
2.
3.
4.
5.
●Donotslidetheplugwithhavingcomeintheduct.
Doingsomayresultinfaultyconnection,thusleadingtoafire.
Caution
・
・
・
The outlet can expand and contract in the range of
approximately 80 to 180 cm from the mounting surface.
Pull down the main body of the outlet. It stops in a position in
which pull down.
To return the main body to the original position, press and
hold the pushbutton press and hold the pushbutton to push up
the main body to a position to which you want to return it.
(Releasing the pushbutton will stop it on the spot.)
Duct
Lever
Polarity indication
(ground side)
Terminal Plug
Ground terminal
(M3.5)
Cover
Securing screw
Set screw
Body
Terminal screw
(M3.5)
Terminal board
Cable clamp
Duct
Lever
Polarity indication
(ground side)
Reeler
outlet plug
reeler outlet
Cord hook
Push button
9

Duct
Lever
outlet plug
Polarity indication
(ground side)
14
MountingLock-typeduplexoutletplugswithgroud
Mountingplug
・Matching the polarity indications on the duct and the plug, insert the plug into the duct
・Press the plug on the duct well, turn the lever right ,Securely lock the lever.
Duct
Lever
Polarity indication
Match the polarity indications.
Polarity indication
Polarityindication
・
Removal plug
・
Push the lever, and release the lock
handling the lever
Removal
Removal
duct
outlet plug
lever
handling the lever
duct
outlet plug
lever
lock
Notes
●Donotattachtheplugunitwherethetappingscrewisusedthe
ductdirectiy
●Donotslidetheplugwithhavingcomeintheduct.
Doingsomayresultinfaultyconnection,thusleadingtoafire.
Caution
13
Mountinganelectricaloutletplug
Mountingplug
Matching the polarity indications on the duct and the plug,
insert the plug into the duct and rotate it clockwise 90.
Dismountingplug
Pull down the lever on the plug,
then rotate it counterclockwise 90.
・
・
Notes
●Donotattachtheplugunitwherethetapping
screwisusedtheductdirectiy
●Donotslidetheplugwithhavingcomeintheduct.
Doingsomayresultinfaultyconnection,thusleadingtoafire.
Caution
10

15
Mountingfluorescentlightingfixture
Fixingclampandfluorescentlightingplug
〈Clamp〉
・As shown in the figure, put the clamp in the hole for bolt in the
fluorescent lighting fixture, and then fasten the locknut to fix the clamp.
Maketheholeforthefluorescentlightplugandclampinfluorescentlighliketherightfigure.
〈Fluorescent lighting plug〉
・As shown in the figure, put the lighting plug in the hole for power
supply cable, and then fasten the locknut to fix the plug.
The clamp and the fluorescent lighting plug come with a set of fluorescent lighting fixture.
Clamp
hole for bolt
Fluorescent lighting
fixture
Locknut
Fluorescent lighting plug
Power supply hole
Locknut
Mountingfluorescentlightingfixturetotheduct
fluorescentlightingplugandclampleverhandlingmethod
〈To mount〉
Rotate clockwise until the lever no longer rotates.
〈To dismount〉
Rotate counterclockwise until the lever no longer rotates.
●Toconnectthecabletounthreadedterminal,usebar
typecrimp-styleterminal.
Notdoingsomayresultinfaultycableconnection,thus
leadingtoafire.
●Securelyfastenthelocknut.
Notdoingsomayresultinadrop.Notdoingsomaycause
theducttodrop.
●Ensureproperleverhandling.
Notdoingsomayresultinadrop.
Caution
・Put the clamp and fluorescent lighting plug lever in line with
the polarity indication(green line) of the duct.
2×5hole
hole
35
Fluorescent
lighting plug
Duct
Polarity
indication
Lever
Mount Dismount
Lever
11

Poster clip
Poster clip
Duct
17
Mountingaductcover
・Mount the cover by fitting it into the opening in the duct.
16
Useofaposterclip
●
Themaximumloadweightis1kg.
Notdoingsomaycausethehangerstodrop.
●
Notestheinstallationplace.
Whenistobeneartheilluminator,Thepostermightdiscolor
andbeginstoburnbecauseoftheheatoftheilluminator.
Caution
Duct
Opening
Duct cover
・Use the poster clip to suspend a work instruction sheet or
process chart from the Factory Line 20.
・Fold down about 10 mm of the top of the work instruction
sheet or process chart and slide it sideways into the poster
clip.
・The work instruction sheet can be positioned in the desired
direction.
・Mount the poster clip onto the Factory Line 20 duct in the
same way as a plug.
12
Table of contents
Popular Lifting System manuals by other brands

PRO LIFTS
PRO LIFTS VMB TE-064 Operating instructions & user manual

FOS Technologies
FOS Technologies Tower 400 user manual

Hillrom
Hillrom Likorall 200 Service manual

ARJO HUNTLEIGH
ARJO HUNTLEIGH Sara Plus Instructions for use

MarineTech
MarineTech Panther 55-0045 Installation and operating instruction

HIRO LIFT
HIRO LIFT HIRO 320 operating instructions