40 mm 8-9 mm
O 8-10 mm
L
N
Make the electrical connections in 3 pole connector
as per the ENL marking. Use 1.5 sq mm cable.
M10 (2x)
17 N.m
Take the Luminaire out of the packing Box.
Remove the cable tie and mount the Bolt Caps.
(Cable tie is used on both sides of handles to
secure the bolt cap).
Unscrew the M5x20 Captive screw to open the gear
cover and to have access to the electrical connections.
Caution: Gland should never be above centerline
Note: Gear cover has Self retaining screws.
Unpack the Bolt caps, loosen
the M10 Bolts. Adjust the angle, tighten the bolts.
Put the bolt caps back.
Center
Line
40 mm 8-9 mm
O 8-10 mm
For External wire connection use watertight
Ip65 Box (not part of Luminaire)
4.
5.
6.
3.
1. 2. 7.
10.
Center
Line
Caution: Warranty void if earthing is not connected.
Secure the Gasket on the housing ribs. Ensure ribbed
side of gasket is on the outer side. (As shown in Fig 4)
Place the Gear Cover on the housing matching the
profile of gasket.
Ribbed side
of gasket X-Section
Fig. 1 Fig. 2
Fig.3 Fig.4
Fig. 5 Fig. 6
Fig. 7
Fig. 10
Housing ribs
M12 (3x)
30 N.m
Outer side
Mount the Luminaire
on the Bracket using 03
nos. of M12 screws applying
a torque of 30 Nm.
LONGER SIDE
SHORTER SIDE
8.
Fig. 8
9.
Suitable for mounting
from Bottom
Fig. 9
DETAIL B
Press the Cover applying uniform pressure over the
top surface. Ensure that gasket is not deformed and
stays inside the cover.
Engage the M5 screws with the housing applying torque
of 1 Nm initially in the sequence as shown in fig. 2.
Finally tighten the Screws with a torque of 2 Nm in the
same sequence
2
5
3
1
4
6
Remove
the bolts
Remove
the bolts 1
2
1
Rotate the bracket
Mount it on luminaire.Tighten
M10 Bolts with a torque of 17Nm.
Put the Bolt Caps back.
Suitable for mounting
from Top
Fig 9A
Fig 9B
Fig 9C
Fig 9D
All the pictures in the MI sheet are representative only and may vary from the Actual Product.
Gasket
Ribbed
Side
After Gasket Assy