Divider Flanges
32
Attach the corner pieces to the base with
(4) ⁄” x ¾” bolts and washers at each corner
bottom. These should be finger-tight. For lockers
with a floor option, place the floor down before
the corners.
Attach the side pieces with (7) ⁄” x ¾” bolts
and washers each. These should be finger-
tight. For double lockers, also attach the
divider flanges.
Place the locker base where the final locker position will be. Thread the leveling feet into the locker base and
adjust the feet as necessary to level the base. If the locker is being installed on asphalt, use the asphalt feet.
Once the base is level and in place, use a hammer drill with a ⁄” diameter masonry bit to drill through the
leveling feet and into the ground at least 4”. Pound the wedge anchors through the leveling feet and into the
ground and tighten the nuts.
RECOMMENDED BASE MATERIAL
Solid concrete is the best base material for installation.
To ensure the proper anchors are shipped with your
rack, ask your Dero representative which anchor is
appropriate for your application. Be sure nothing is
underneath the base material that could be damaged
by drilling.
TOOLS NEEDED
Hammer drill with ⁄” x 6+ masonry bit
Hammer
Bubble level
Tape measure
⁄”, ⁄”, ¼”, ⁄” hex L-wrench with ball end
⁄”, ½”, 1 ⁄” wrench with open end
#3 Philips screw driver
Wedge anchor
Leveling foot
Asphalt foot
DERO BIKE LOCKER™
Installation Instructions