Poly Tech 900 Series User manual

HOW TO INSTALL YOUR POLY LAST™
CASE Corn Head Auger Trough Covers
900 & 1000 Series ONLY!
For 800 Series Instructions Call 800.448.7659
www.polyskid.com
P. O. Drawer 349, Monticello, GA. 31064
Phone: 800-542-7659, Fax: 706-468-2881
E-Mail: [email protected]
ACHC00_06JUL09
Copyright© 2006 Poly Tech Industries, Inc. 1
PLEASE READ THE ENTIRE INSTRUCTION SHEET
BEFORE STARTING INSTALLATION
PLEASE REFER TO THE OPERATORS MANUAL FOR YOUR
SPECIFIC COMBINE FOR PERTINENT SAFETY PRECAUTIONS
First compare the contents with the enclosed “Packing Slip” to confirm that you have
received the correct size panels and associated hardware for your model header.
Also confirm that you have received the correct center panel for your feeder opening
and/or model combine as illustrated below.
Combine Model 1680, 1688, 2188 and 2388
Combine Model 1620, 1640, 1644, 1660
1666, 2144 and 2166
The terms “LEFT”, “RIGHT”, “FRONT”, and “REAR ” are determined by facing in the
direction the combine will travel when in use.

Combine Feeder Safety Lock
Do not rely on the hydraulic system for support.
Copyright© 2006 Poly Tech Industries, Inc. 2
2. Remove all patches; repairs or added bolts that would restrict the poly covers from
laying flat against the top surface of the metal trough. The poly covers can be
installed over heavily worn metal and over holes in the metal plates if the holes do
not exceed 3 inches in width (front to back) and are less than 18 inches in length
(left to right).
1. Clean the metal trough to remove all dirt and crop residue.
3. With the corn head connected to the combine, raise the feeder house to maximum
height and engage the feeder safety lock.
(Shown below for reference only. See your operator's manual for specifics on your machine)
Raise feeder to maximum up position and lower safety stop over the piston rod of the
header lift cylinder and pin in place. Then lower feeder to lock stop in place.
ACHC00_06JUL09

FRONT
Copyright© 2006 Poly Tech Industries, Inc. 3
4. A. Remove the factory bolts (5 each for the 33" opening and 7 each for the 42"
opening) along the rear edge of the feeder opening.
B. Remove the two outer factory bolts which correspond to the outer slots in
the poly center panel.
ACHC00_06JUL09

Copyright© 2006 Poly Tech Industries, Inc. 4
5. Insert the poly center panel under the auger as illustrated below.
NOTE: IT IS VERY IMPORTANT TO PUSH THE POLY PANEL REARWARD UNTIL
THE REAR EDGE OF THE POLY MAKES CONTACT WITH THE STRIPPER ANGLE
AND THE FRONT EDGE "SNAPS" BEHIND AND BELOW THE FRONT STEEL RAIL
OF THE HEADER.
It may be necessary to use a block of wood to drive the panel into position as illustrated.
NOTE: If necessary, raise the auger to maximum height.
Readjust auger to desired height after installation is complete.
ACHC00_06JUL09

FRONT
Copyright© 2006 Poly Tech Industries, Inc. 5
6. Align poly center panel with the holes in the metal and replace the bolts removed in
Step 4 with the 1/4"-20 x 1 1/4" fanged elevator bolts as illustrated below. Loosely
install all bolts. Tighten the two outer bolts first, and then tighten the rear bolts.
7. Using the two pre-drilled holes as a guide, drill thru the floor of the header with the
3/8” drill bit supplied.
Install the additional
1/4-20 x 1 1/4”
elevator bolts.
When using power tools, basic safety precautions should always be
followed to reduce the risk of personal injury.
WEAR SAFETY GLASSES OR GOGGLES
!
IMPORTANT:
Tighten the nut to seat the head of
the bolt then loosen the nut 3/4 turn.
This will allow the liner to expand and
contract with temperature change.
ACHC00_06JUL09

3 Panel Kit
FRONT
5 Panel Kit
FRONT
Copyright© 2006 Poly Tech Industries, Inc. 6
8. Insert the left and right panels under the auger as in step 5.
9. Using the 3/16" plastic block as a gauge and working from the center outward,
position the end panels so that there is a 3/16" gap at each joint.
NOTE:
THE TERMS "LEFT, RIGHT, FRONT AND REAR" ARE DETERMINED BY FACING IN THE
DIRECTION THE COMBINE WILL TRAVEL WHEN IN USE.
ACHC00_06JUL09

Guide for Recommended Hole Location
3 Panel Kit
5 Panel Kit
Copyright© 2006 Poly Tech Industries, Inc. 7
10.
Drilling upward from underneath the header, use the 3/8" drill bit to drill
thru the metal trough and poly cover as illustrated below. Drill the holes in line with
the outer holes of the center panel as illustrated. (Approximately 7 in. from the rear
of the trough).
Wedge the panels tight against the bottom of the trough with the wooden shims
supplied.
Install and tighten a 1/4"-20 x 1 1/4" Fanged bolt in each hole before drilling the next hole.
!
IMPORTANT:
Tighten the nut to seat the head of
the bolt then loosen the nut 3/4 turn.
This will allow the liner to expand and
contract with temperature change.
ACHC00_06JUL09

Copyright© 2006 Poly Tech Industries, Inc. 8
11. To complete the installation, drill a 3/8" hole in the center of each row as illustrated
below. Drill from the topside downward. Locate the hole approximately 3/4" from
the front edge. Confirm that this location is correct to miss the gear box and
clutch assembly on the underside. Secure with 1/4"-20 x 3/4" truss head bolt.
!
IMPORTANT:
Tighten the nut to seat the head of
the bolt then loosen the nut 3/4 turn.
This will allow the liner to expand and
contract with temperature change.
ACHC00_06JUL09

Thank you for choosing another fine Poly Last™ product.
Any questions - Call Poly Tech Customer service at 1-800-448-7659
Copyright© 2006 Poly Tech Industries, Inc. 9
ACHC00_06JUL09
This manual suits for next models
12
Popular Tools manuals by other brands

RED ROOSTER
RED ROOSTER RRI-4612R VL manual

Sealey
Sealey VS7233 instructions

RIDGID
RIDGID SeeSnake nanoReel quick start guide

Faicom
Faicom MNP Use and maintenance manual

Harbor Freight Tools
Harbor Freight Tools Pittsburgh 95122 Assembly and operation instructions

Carlisle
Carlisle Tension-Finder User instruction manual