
Type WE6s32P
WK 430 450 04.2016 - 2 -
D
DD
DC
CC
C A
AA
AC
CC
C
(plug-in connector with recti ier)
2
22
23
33
30
00
0V
V V
V -
- -
- 5
55
50
00
0H
HH
Hz
z z
z 2
22
22
22
20
00
0V
V V
V -
- -
- 5
55
50
00
0H
HH
Hz
z z
z 1
11
11
11
10
00
0V
V V
V -
- -
- 5
55
50
00
0H
HH
Hz
zz
z1
11
12
22
2V
V V
V 2
22
24
44
4V
V V
V 1
11
11
11
10
00
0V
VV
V
Weight with 2 solenoids 2,1 kg
with 1 solenoid 1,5 kg
15000 on/h
3
33
35
5 5
5 M
MM
MP
PP
Pa
aa
a
2
22
21
1 1
1 M
MM
MP
PP
Pa
aa
a
Viscosity range
Ambient temperature range
mineral oil
Hydraulic luid
Nominal luid viscosity
2o
37 mm /s at temperature 55 C
2
2,8 up to 380 mm /s
recommended
max
Fluid temperature range (in a tank) 40 C up to 55 C
oo
-20 C up to +70 C
o
o
- 20 C up to +50 C
Re
ReRe
Req
qq
qu
uu
uired
ired ired
ired l
ll
lu
uu
uid c
id cid c
id cle
lele
lea
aa
an
nn
nl
ll
li
ii
ine
nene
ness c
ss css c
ss cl
ll
la
aa
ass
ssss
ss I
II
IS
SS
SO
O O
O 4
44
44
44
40
00
06 c
6 c6 c
6 cl
ll
la
aa
ass
ss ss
ss 2
22
20
00
0/
//
/1
11
18
88
8/
//
/1
11
15
55
5
port
port port
port T
TT
T
port
portport
ports P
s Ps P
s P
,
A
AA
A
,
B
B B
B
M
MM
Ma
aa
ax
xx
xim
imim
imum
um um
um oper
operoper
operat
atat
ati
ii
ing pres
ng presng pres
ng press
ss
sure
ureure
ure
o o
S
SS
Supp
uppupp
upply
ly ly
ly v
vv
vo
oo
olt
ltlt
ltage
age age
age o
oo
o s
s s
so
oo
ole
lele
len
nn
no
oo
oid
idid
ids
ss
s
Degree o pr
Degree o prDegree o pr
Degree o pr o
oo
otecti
tectitecti
tectio
oo
on
nn
n I
II
IP
P P
P 6
66
65
55
5
Switching time
Maximum switching requency
Supply voltage tolerance ±10%
Power requirement (DC) 30 W
Solenoid coil temperature max 150 C
o
ON longer or equal 60 ms
OFF
longer or equal
40 ms
TECHNICAL DATA
INSTALLATION AND OPERATION REQUIREMENTS
1.
1.1.
1. Only ully unctional and operational valve, properly
Only ully unctional and operational valve, properly Only ully unctional and operational valve, properly
Only ully unctional and operational valve, properly
connected to electrical installation must be used.
connected to electrical installation must be used.connected to electrical installation must be used.
connected to electrical installation must be used.
Connecting or disconnecting the valve to an electrical
Connecting or disconnecting the valve to an electrical Connecting or disconnecting the valve to an electrical
Connecting or disconnecting the valve to an electrical
installation must only be carried out by quali ied
installation must only be carried out by quali ied installation must only be carried out by quali ied
installation must only be carried out by quali ied
personnel.
personnel.personnel.
personnel.
2.
2.2.
2. Ground connection
Ground connection Ground connection
Ground connection ( )
must be connected with
must be connected with must be connected with
must be connected with
protective earth wire
protective earth wire protective earth wire
protective earth wire (PE
PEPE
PE
)
in supply system
in supply system in supply system
in supply system
according to appropriate instructions.
according to appropriate instructions.according to appropriate instructions.
according to appropriate instructions.
3.
3.3.
3. Solenoid plug shall precisely adhere to socket and shall
Solenoid plug shall precisely adhere to socket and shall Solenoid plug shall precisely adhere to socket and shall
Solenoid plug shall precisely adhere to socket and shall
be secured with thread bolt screwed in securely in a
be secured with thread bolt screwed in securely in a be secured with thread bolt screwed in securely in a
be secured with thread bolt screwed in securely in a
place.
place. place.
place.
It is orbidden to operate
It is orbidden to operateIt is orbidden to operate
It is orbidden to operate
the valve i the
the valve i the the valve i the
the valve i the
tightness and suitable clamp o cable in the plug gland
tightness and suitable clamp o cable in the plug gland tightness and suitable clamp o cable in the plug gland
tightness and suitable clamp o cable in the plug gland
are not ensured.
are not ensured.are not ensured.
are not ensured.
4.
4.4.
4. During the period o operation must be kept luid
During the period o operation must be kept luid During the period o operation must be kept luid
During the period o operation must be kept luid
viscosity acc. to requirements de ined in this
viscosity acc. to requirements de ined in this viscosity acc. to requirements de ined in this
viscosity acc. to requirements de ined in this Data
Data Data
Data
Sheet
Sheet Sheet
Sheet -
--
-
Operation
Operation Operation
Operation Manual
ManualManual
Manual
5.
5.5.
5. In order to ensure ailure ree and
In order to ensure ailure ree and In order to ensure ailure ree and
In order to ensure ailure ree and sa e operation the
sa e operation the sa e operation the
sa e operation the
ollowing must be checked:
ollowing must be checked:ollowing must be checked:
ollowing must be checked:
•
• •
• condition o the electrical connection
condition o the electrical connectioncondition o the electrical connection
condition o the electrical connection
•
• •
• proper working o the valve
proper working o the valveproper working o the valve
proper working o the valve
•
• •
• cleanliness o the hydraulic luid
cleanliness o the hydraulic luidcleanliness o the hydraulic luid
cleanliness o the hydraulic luid
6.
6.6.
6.
Due to heating o electromagnet solenoid coils to
Due to heating o electromagnet solenoid coils to Due to heating o electromagnet solenoid coils to
Due to heating o electromagnet solenoid coils to
high temp., the valve
high temp., the valvehigh temp., the valve
high temp., the valve
shall be pla
shall be plashall be pla
shall be pla
ced in such way to
ced in such way to ced in such way to
ced in such way to
eliminate the risk o accidental contact with solenoid
eliminate the risk o accidental contact with solenoideliminate the risk o accidental contact with solenoid
eliminate the risk o accidental contact with solenoid
or valve housing
or valve housingor valve housing
or valve housing
during operation or to apply suitable
during operation or to apply suitable during operation or to apply suitable
during operation or to apply suitable
covers acc. to PN
covers acc. to PNcovers acc. to PN
covers acc. to PN
-
--
-
EN ISO 13732
EN ISO 13732EN ISO 13732
EN ISO 13732
-
--
-
1 and PN
1 and PN1 and PN
1 and PN
-
--
-
EN
EN EN
EN 4413
44134413
4413
In order to ensure tightness o the directional valve
In order to ensure tightness o the directional valve In order to ensure tightness o the directional valve
In order to ensure tightness o the directional valve
one should take care o dimension o sealing
one should take care o dimension o sealing one should take care o dimension o sealing
one should take care o dimension o sealing
rings
ringsrings
rings, tightening torques
, tightening torques , tightening torques
, tightening torques
and valve operation
and valve operation and valve operation
and valve operation
parameters given in this Data Sheet
parameters given in this Data Sheet parameters given in this Data Sheet
parameters given in this Data Sheet -
--
-
Operation
OperationOperation
Operation
Manual
ManualManual
Manual
8.
8.8.
8.
Prior to irst use o the valve, one should vent the so t
Prior to irst use o the valve, one should vent the so t Prior to irst use o the valve, one should vent the so t
Prior to irst use o the valve, one should vent the so t
shi t valves. It is recommended to set the valve in
shi t valves. It is recommended to set the valve inshi t valves. It is recommended to set the valve in
shi t valves. It is recommended to set the valve in
such a way that the valve settings were directed
such a way that the valve settings were directed such a way that the valve settings were directed
such a way that the valve settings were directed
“upwards”. In order to provide a thorough venting, it
“upwards”. In order to provide a thorough venting, it “upwards”. In order to provide a thorough venting, it
“upwards”. In order to provide a thorough venting, it
is recommended to unscrew the so t shi t valves,
is recommended to unscrew the so t shi t valves, is recommended to unscrew the so t shi t valves,
is recommended to unscrew the so t shi t valves,
immerse the ports in oil that is used and override the
immerse the ports in oil that is used and override the immerse the ports in oil that is used and override the
immerse the ports in oil that is used and override the
valve without any load. This process should be
valve without any load. This process should be valve without any load. This process should be
valve without any load. This process should be
epeated until the ports are ull, and then, the valves
epeated until the ports are ull, and then, the valves epeated until the ports are ull, and then, the valves
epeated until the ports are ull, and then, the valves
can be screwed. A ter venting, set the valves’ setting
can be screwed. A ter venting, set the valves’ setting can be screwed. A ter venting, set the valves’ setting
can be screwed. A ter venting, set the valves’ setting
to achieve optimal operation o the valve.
to achieve optimal operation o the valve.to achieve optimal operation o the valve.
to achieve optimal operation o the valve.
9.
9.9.
9.
A person that operates the valve must be thoroughly
A person that operates the valve must be thoroughly A person that operates the valve must be thoroughly
A person that operates the valve must be thoroughly
amiliar with this Data Sheet
amiliar with this Data Sheet amiliar with this Data Sheet
amiliar with this Data Sheet -
--
-
Operation Manual.
Operation Manual.Operation Manual.
Operation Manual.