
2
P O R C H E S O N
R
3. Installation and Debugging of Computer Control System
3.1Cautions upon Installing the Control System
The design of control system is simple and easy, only one 15-core shielding cable connecting
(1)Upon installing the host control box, adopt the enclosed distribution cabinet at the first choice.
(2)Upon fixing the host computer and power pack, please keep the interconnecting parts such
(3)All electric wires and shielding wires shall not be cut off, lengthened or curtailed arbitrarily.
(5)Upon wiring, separate the high and low pressure line from the computer control line as much as
(6)Upon fixing the keyboard and 15-core communication connections of the host computer, you
(7)Pay special attention to the oil valve outlet public port YCO M, it shall be connected wel l to prevent
the compu ter from inputting whi le having the phenomen on of oil valve having no mot ion.
control box equipment outfit (for reference only)
Chapter 1 System Configuration & Installation
(4)The shell of flame couple shall adopt the shielding wire. When the outer shielding of all flame
It shall be fixed in the well-ventilized, greaseproof and dustproof conditions equipped with a
fan and dustproof. The distribution box shall be stored under 50degree.
as all AC connectors and transformers as far away from each other as possible to prevent the
electric wave interference from the electronic grid.
You should use the electric wires and shielding wires provided by this company to prevent
from influencing the reliability and normal operation of the control system.
couples adopts the thermal couple reticles, the reticle and machines shall be well grounded and
connected to the ground with the earthing resistance below 4ohm.
shall press and tweak with force to prevent the poor connection from affecting the reliable
operation of control system.
the keyboard and host computer shell with flexible and handy installation and connection. The
sketch map for installation is shown as follows:
User's Manual for MK2XXX V1.0
P O R C H E S O N
M C 2 0 0 0 A
AD 1
COM
AD 2
AD3
AD 4
REF+
AD5
AD6
AD7
AD8
REF-
+10V
AD9
AD10
AD11
AD12
压力 检测
CAN
24VG
bef ore noz zle sto p
fee d rotat ion spe ed
Ele ctric E ye ente r
inj ector P rotec tive co ver
aft er nozz le stop
mol d close s top
fro nt door 2
fro nt door 1
lub ricat ing pre ss is low
lub ricat ing oil i s low
bac k door 2
bac k door1
mec hanic h and mol d close
bac k mold ad ject st op
fro nt mold a dject s top
fin e adjus t teeth n umber
mot or faul t
doo r open st op
mec hanic h and eje ctor
cor e A retur n stop
cor e B retur n stop
cor e C retur n stop
cor e D retur n stop
cor e A advan ce stop
cor e B advan ce stop
cor e C advan ce stop
cor e D advan ce stop
nit rogen u ppper l imit/ 4B
nit rogen d own lim it/4A
F2 Sp eed
F1 Sp eed
P2 Pr essur e
P1 Pr essur e
mol d close
noz zle adv ance
inj ector
fee d
suc k back
noz zle ret urn
mol d open
eje ctor ad vance
Eje ctor re turn
mol d thin
diff erent ial mol d locki ng
mol d thick
mol d open bu ffer
fau lt alar m
Low p ressu re mold c lose
hig h press ure mol d close
mol d open fa st
mol d open fi nishe d
eje ctor fi nishe d
ful ly auto
nit rogen r echarg e
nit rogen r eleas e
blo w male
blo w femal e
cor e A out
cor e B in
cor e B out
cor e C in
cor e C out
cor e D in
cor e D out
cor e A in
big p ump
mid dle pum p
Sma ll pump
Doo r open
fro nt clos e
Strong eletricity section
Ebb eletric it y section
P1
P2
PW450
POWER
Control
system.
Power
Strong
eletricity
Equipment
Strong
eletricity
Equipment
Relay board
Strong
eletricity
Equipment
possible, do not bind all electrical wires together to prevent the interference from affecting the
reliable operation of control system.