POWERSIDE IN-SITE MV Instruction Manual

In-Site Quick Start Guide MV (V.2)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 1
IN-SITE
INTELLIGENT POWER SYSTEM MONITORING
Quick Start Installation Guide – Medium Voltage Package
WARNING— Death, serious injury, or fire hazard could result from improper connection or operation of this instrument.
Read and understand this manual before connecting the device.
If this equipment is not used in a manner specified by the manufacturer, the protection provided by the equipment may be impaired. Installation, service, and
maintenance of your In-Site device must be performed by a licensed electrician in compliance with all applicable national and local codes and regulations.
©
2008–
2020 Power Standards Ltd. All rights reserved. No part of this document may be copied, reproduced, or translated into another language without the prior written
consent of Power Sensors Ltd. “PQube®” is a registered trademark of Power Standards Lab. Power Survey and Power Standards Lab (DBA) Powerside
The information contained in this document is subject to change without notice. POWERSIDE MAKES NO WARRANTY OF ANY KIND WITH REGARD TO THIS MATERIAL,
INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR USE. Powerside shall not be liable for errors
contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this material. If you do not accept this
limitation on liability, please return the product to Powerside prior to use. Product manufactured in the United States of America.

In-Site Quick Start Guide MV (V.2)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 2
Unpack the box and check the components.
Remove all protective tape and film.
Ensure you have all components as show below.
If parts are missing or broken, contact Technical Support.
What’s included
Safety
Installation should only be performed by an electrician professionally qualified for the specific equipment where the
In-Site gateway will be installed.
Follow all safety practices prescribed in local electrical code and professional best practices
Follow all OSHA electrical safety guidelines as it related to work practices and personal protection equipment for
work with lethal voltages
Required materials
4 ea. of either #10 to #1/4 screws
Powerside Commissioning App downloaded from the Apple or Google Play Store.
Login credentials provided by Powerside. Contact Powerside Technical Support.
(1) In-Site gateway
(4) 5A Current
Transformers (CT)
(2) Antenna Cables (50 ft.)
(1) Antenna Bracket
(2) Antennas

In-Site Quick Start Guide MV (V.2)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 3
Installation
Disconnect the power necessary to make the installation
location electrically safe. If In-Site is installed at the point of
common coupling (service entrance), turn off the AC mains.
Install as close to Point of Common Coupling (PCC) as
possible while observing all local electrical standards i.e.
NFPA 70 and NFPA 70E. To ensure safety follow Lock Out Tag
Out (LOTO) procedures.
Install In-Site gateway within 20 ft of connection point
(length of CT secondary wiring).
Note—Overcurrent protection devices (fuses) are installed in
the unit. Replace in kind if required.
voltage measurement lines: ATDR2 – 600Vac Class CC
2A Time Delay 200kA
power supply: BK1-S505H-1-R – 250Vac 20mm 1A
Time Delay Fuse 1kA
Connect the 5A split-core CT’s on the 5A secondary leads of
existing MV CT.
Following the instructions provided with the CT, Install the
CT with THE WHITE CT LABEL FACING TOWARD THE SOURCE
(Figure 2).
WARNING: Ensure that the CT’s secondary circuit is short-
circuited prior to work on CT circuit. Under no circumstances
should the secondary circuit of the CT be operated without a
shorting block in place as lethal voltages may be present.
Connect CT leads for I1-I4 to terminals 1 — 8 per Figure 3
(below).
Phases are color coded.
L1 Red
L2 Yellow
L3 Blue
N White
Using installer-provided wiring install Mains AC voltage input
wires for L1, L2, L3 on existing Potential Transformers (PTs)
and Neutral and Ground (PE) per Figure 3 (below)
for a WYE
configuration. If configuring a DELTA system, input wires for
L1, L2, L3, and Ground (PE).
Using installer-provided wiring connect the power supply to a 120Vac source to terminals 11-12.
Figure 1
Enclosure Dimensions: 15.45” x 9.86” x
4.34. Overall (including mounting flange
and antenna): 22.82” x 11.50 x 4.34”
2
1
5
4
3
6
Figure 2

In-Site Quick Start Guide MV (V.2)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 4
Install the antenna to connectors on the exterior of enclosure and check the cellular reception. If
the cellular reception is weak, install the antennas in a better location using the provided cables
and mounting bracket.
Figure 3
While observing all appropriate safety requirements, return power to the affected systems. The
In-Site gateway will power up and is awaiting commissioning. After 3~5 minutes, a green LED will
indicate successful initialization. See Figure 4. If the unit does not power-up check the wiring. If
the problem persists, contact Technical Support.
7
8

Utility Power Inside Building
Distribution Panel -
Single Phase Lighting & Appliances
In-Site Gateway Indoor Installation Diagram
Disconnect Switch Transformer
Distribution Panel -
3-phase Motors
Transformer
LV Installation (up to 600V)
MV Installation (above 600V)
Utility
Disconnect
Utility
Meter
Building
Disconnect

In-Site Quick Start Guide MV (V.2)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 5
Figure 4 Figure 5
Activate the In-Site gateway using the Powerside Commissioning In-Site phone App. Commissioning takes
approximately 15~20 minutes.
Launch the Powerside
Commissioning App. Log in with the
credentials provided by Powerside.
Click on the serial number of your
PQube 3. See cover panel figure 5
Click on each parameter to verify and
set your settings as needed.
9

In-Site Quick Start Guide MV (V.2)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 6
Only Wye and Delta are supported.
Choose your configuration and
nominal voltages by pressing down
the arrow keys.
The CTs are preconfigured for 5A
Standard CT. You must enter the PT
ratio. No CT required on I5 (GND).
Earth current will be calculated
The convention used is a counter-
clockwise rotation: L1 (red), L2
(yellow), L3 (blue). If vectors do not
match this, verify wiring and CT
direction.
Tips: If you get the errors below, move your phone closer to the device, hit OK to try again or contact Powerside support.

In-Site Quick Start Guide MV (V.2)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 7
Click ONBOARD DEVICE to apply
settings from App to In-Site device.
Review settings. Cancel if changes
needed or hit Apply to proceed with
uploading data to the cloud.
In-Site tries to correlate your location
with its internal database. If it can’t
find a match (detected with your
smartphone), the App will require
entering
the Measurement Point name
manually.
A validation code will be given when
the data has been successfully
uploaded to the Powerside cloud
Before leaving the site, contact Powerside technical support (US (888) 736-4347 ǀ Canada (877) 333-8392)
to validate data is sent to the cloud.
Your In-Site gateway installation and configuration are now complete. Allow up to 72 hours for your
“Measurement Point” to go live on In-Site.
Please contact In-Site. support@powerside.com for assistance or further information on our product.
Powerside® and PQube® are registered trademarks of Power Survey and Equipment Ltd. and Power Standards Lab. © 2020 Powerside. All rights reserved.
11
10