POWERSIDE IN-SITE Instruction Manual

In-Site Quick Start Guide LV (V.3)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 1
IN-SITE
INTELLIGENT POWER SYSTEM MONITORING
Quick Start Installation Guide – Low Voltage Package
WARNING— Death, serious injury, or fire hazard could result from improper connection or operation of this instrument.
Read and understand this manual before connecting the device.
If this equipment is not used in a manner specified by the manufacturer, the protection provided by the equipment may be impaired. Installation, service, and
maintenance of your In-Site device must be performed by a licensed electrician in compliance with all applicable national and local codes and regulations.
©
2008–
2020 Power Standards Ltd. All rights reserved. No part of this document may be copied, reproduced, or translated into another language without the prior written
consent of Power Sensors Ltd. “PQube®” is a registered trademark of Power Standards Lab. Power Survey and Power Standards Lab (DBA) Powerside
The information contained in this document is subject to change without notice. POWERSIDE MAKES NO WARRANTY OF ANY KIND WITH REGARD TO THIS MATERIAL,
INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR USE. Powerside shall not be liable for errors
contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this material. If you do not accept this
limitation on liability, please return the product to Powerside prior to use. Product manufactured in the United States of America.

In-Site Quick Start Guide LV (V.3)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 2
Unpack the box and check the components.
Remove all protective tape and film.
Ensure you have all components as show below.
If parts are missing or broken, contact Technical Support.
What’s included
Safety
Installation should only be performed by an electrician professionally qualified for the specific equipment where the
In-Site gateway will be installed.
Follow all safety practices prescribed in local electrical code and professional best practices
Follow all OSHA electrical safety guidelines as it related to work practices and personal protection equipment for
work with lethal voltages
Required materials
4 ea. of either #10 to #1/4 screws
Powerside Commissioning App downloaded from the Apple or Google Play Store.
Login credentials provided by Powerside. Contact Powerside Technical Support.
(1) In-Site gateway
(3) 36” Rogowski Coils
(1) 48” Rogowski Coils
(1) Antenna Bracket
(2) Antenna Cables (50 ft.)
(2) Antennas

In-Site Quick Start Guide LV (V.3)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 3
Installation
Disconnect the power necessary to make the installation
location electrically safe. If In-Site is installed at the point of
common coupling (service entrance), turn off the AC mains.
Install as close to Point of Common Coupling (PCC) as
possible while observing all local electrical standards i.e.
NFPA 70 and NFPA 70ETo ensure safety follow Lock Out Tag
Out (LOTO) procedures.
Install In-Site gateway within 20 ft of busbar (length of CT
secondary wiring).
Note—Overcurrent protection devices (fuses) are installed in
the unit. Replace in kind if required.
voltage measurement lines: ATDR2 – 600Vac Class CC
2A Time Delay 200kA
Warning: the Rogowski coils are rated for 1000V CAT III. Do
not install in medium voltage location without provisions.
Connect the Rogowski coil secondary wires for I1 - I4 to
terminals 1 — 12 per Figure 1 (below).
Phases are color coded.
L1 Red
L2 Yellow
L3 Blue
N White
Pay special attention to the position of the Rogowski coil when wrapped around the conductor.
Using installer-provided wiring install Mains AC voltage input wires for L1, L2, L3, Neutral and Ground (PE)
per Figure 2 (below)
for a WYE configuration. If configuring a DELTA system, input wires for L1, L2, L3, and
Ground (PE).
Install the antenna to connectors on the exterior of enclosure and check the cellular reception. If
the cellular reception is weak, install the antennas in a better location using the provided cables
and mounting bracket.
Enclosure Dimensions: 15.45” x 9.86” x
4.34. Overall (including mounting flange
and antenna): 22.82” x 11.50 x 4.34”
2
1
5
6
4
3

In-Site Quick Start Guide LV (V.3)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 4
Figure 1
Figure 2
Not
used

Utility Power Inside Building
Distribution Panel -
Single Phase Lighting & Appliances
In-Site Gateway Indoor Installation Diagram
Disconnect Switch Transformer
Distribution Panel -
3-phase Motors
Transformer
LV Installation (up to 600V)
MV Installation (above 600V)
Utility
Disconnect
Utility
Meter
Building
Disconnect

In-Site Quick Start Guide LV (V.3)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 5
While observing all appropriate safety requirement, return power to the affected systems. The In-
Site gateway will automatically power up and is awaiting commissioning. After 3~5 minutes a
green LED will indicate successful initialization. If the unit does not power-up check the wiring. If
the problem persists, contact Technical Support.
Activate the In-Site gateway using the Powerside Commissioning In-Site phone App. Commissioning takes
approximately 15~20 minutes.
Launch the Powerside
Commissioning App. Log in with the
credentials provided by Powerside.
Click on the serial number of your In-
Site Gateway (PQube 3 SN).
Click on each parameter to verify and
set your settings as needed.
7
8

In-Site Quick Start Guide LV (V.3)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 6
Only Wye and Delta are supported.
Choose your configuration and
nominal voltages by pressing down
the arrow keys.
The CTs are pre-configured for 3000A
Rogowski Coils. No CT required on I5
(gnd). The PQube will calculate earth
current for you.
The convention used is a counter-
clockwise rotation: L1(red), L2(yellow),
L3(blue). If vectors do not match this,
verify wiring and CT direction.
Tips: If you get the errors below, move your phone closer to the device, hit OK to try again or contact Powerside support.

In-Site Quick Start Guide LV (V.3)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 7
Click ONBOARD DEVICE to apply
settings from App to In-Site device.
Review settings. Cancel if changes
needed or hit Apply to proceed with
uploading data to the cloud.
If GPS and physical address don’t
match a manual entry may be
required.
A validation code will be given when
the data has been successfully
uploaded to the Powerside cloud
Before leaving the site, contact Powerside technical support (US (888) 736-4347 ǀ Canada (877) 333-8392)
to validate data is sent to the cloud.
Your In-Site gateway installation and configuration is now complete. Allow up to 72 hours for your
“Measurement Point” to go live on In-Site.
Please contact In-Site.support@powerside.com for assistance or further information on our product.
Powerside® and PQube® are registered trademarks of Power Survey and Equipment Ltd. and Power Standards Lab. © 2020 Powerside. All rights reserved.
10
Table of contents
Other POWERSIDE Gateway manuals