PSP SunGlaze User manual

Installation Guide: SunTuf SunGlaze
Superior Residential Polycarbonate Glazing System
SUNGLAZE Panel
Bottom Glazing Bar
Middle Glazing Bar
Edge Bottom Glazing Bar
Note: Edge Bottom Glazing Bar is to be installed
if a cut panel is required. Refer section 8.
Required Tools Safety comes rst
System Components
Do not step directly on the sheets between the purlins!
When installing SUNGLAZE or doing maintenance work,
always consider the sheet to be unt to support a person’s
weight. Always use stepping ladders or crawling boards,
supported by minimum three roof structural elements,
when working on a glazed roof of any kind.
Drill Impact Driver Rubber Mallet
Angle GrinderDrop Saw
Ladder
Edge Middle Glazing Bar
Note: Edge Middle Glazing Bar is to be installed
if a cut panel is required. Refer section 8.
Top Cap for Middle
& Edge Middle Glazing Bar
Flush End Cap (for xing to the Bottom & Edge Bottom
Glazing Bar at the top of the roof nearest to the building/
home). Fixings included 10G x 25 mm Self Drilling
Note: Both the Bottom and Edge Bottom widths
are differ in size*.
Standard & Edge End Cap (for xing to the Bottom
& Edge Bottom Glazing Bar at the spouting end of the
roof). Fixings included 10G x 25 mm Self Drilling
Note: Both the Bottom and Edge Bottom widths differ
in size. Top and bottom xing points is recommended*.
End Panel Gasket
Note: End Panel Gasket is only required if both
the Edge Bottom and Edge Middle Glazing Bars
are needed to x cut panels to the structure. Refer
section 8.
Self Tapper
8G x 50 mm Pan Square Drive
For xing into the timber structure.
6gx20mmSQUARE DRIVE STAINLESS STEEL 316
FIXING SCREW
CV-F01
8g x 50mm SQUARE DRIVE SELF TAPPERS
STAINLESS STEEL 316 FIXING SCREW
CV-F03
HEX DRIVE, UNC THREAD STAINLESS STEEL 316
SOCKET CAP SCREW
CV-F04
14g x 25mm HEX FLANGE STAINLESS STEEL
316 SELF DRILLING SCREW
CV-F05
12g x 35mm HEX FLANGE TYPE 17 STAINLESS
STEEL 316 FIXING SCREW
CV-F06
10g x 50mm COUNTER SUNK SQUARE DRIVE
STAINLESS STEEL 316 FIXING WOOD SCREW
CV-F08
Scale:
Date:
Dwg:
T.09 415 2800
F.09 415 2809
www.psp.co.nz
320 Rosedale Road, Albany, Auckland, New Zealand
PO Box 101 851 NSMC, New Zealand
Note: Details may be subject to change without notification
ClearVue
@ A4
ClearVue roofing system
to be installed and fixed
to suitable structural
support, complying with
relevant clauses of the
NZBC and the New
Zealand Building Act.
NOTE: All dimensions are in millimeters (mm)
NOTE: Recommended roof pitch 5°. Minimum roof pitch
of 3°, consult your PSP agent for suitable applications.
10/12/2019
1 : 1
CV-06
MECHANICAL FIXINGS
Fixing Screw, Self Drilling
12G x 20 mm S/S
For xing the Middle & Edge Middle Glazing Bar
to Bottom and Edge Bottom Glazing Bar
6gx20mmSQUARE DRIVE STAINLESS STEEL 316
FIXING SCREW
CV-F01
8g x 50mm SQUARE DRIVE SELF TAPPERS
STAINLESS STEEL 316 FIXING SCREW
CV-F03
HEX DRIVE, UNC THREAD STAINLESS STEEL 316
SOCKET CAP SCREW
CV-F04
14g x 25mm HEX FLANGE STAINLESS STEEL
316 SELF DRILLING SCREW
CV-F05
12g x 35mm HEX FLANGE TYPE 17 STAINLESS
STEEL 316 FIXING SCREW
CV-F06
10g x 50mm COUNTER SUNK SQUARE DRIVE
STAINLESS STEEL 316 FIXING WOOD SCREW
CV-F08
Scale:
Date:
Dwg:
T.09 415 2800
F.09 415 2809
www.psp.co.nz
320 Rosedale Road, Albany, Auckland, New Zealand
PO Box 101 851 NSMC, New Zealand
Note: Details may be subject to change without notification
ClearVue
@ A4
ClearVue roofing system
to be installed and fixed
to suitable structural
support, complying with
relevant clauses of the
NZBC and the New
Zealand Building Act.
NOTE: All dimensions are in millimeters (mm)
NOTE: Recommended roof pitch 5°. Minimum roof pitch
of 3°, consult your PSP agent for suitable applications.
10/12/2019
1 : 1
CV-06
MECHANICAL FIXINGS
Measuring tape Circular Saw
*A Left and Right Edge End Cap is included. One is to be
installed at the spouting end which covers the Edge Bottom
& Middle Glazing Bar end.

Installation Guide: SunTuf SunGlaze
Superior Residential Polycarbonate Glazing System
Ensure that the underlying roof structure is square before starting
installation of the SUNGLAZE Roof Covering System.
600mm 600mm 600mm 600mm
<600mm
Measure rafter spacing
1
To install SUNGLAZE directly on rafters, the inner rafters must be 600mm on centre.
If end rafters are less than 600mm on centre, then the end Roof Panels must be cut to proper
width before installation. SEE PAGE 8.
Measure purlin spacing
2
<1200mm
<1200mm <1200mm
To install SUNGLAZE directly on purlins, the purlins must be the same distance apart from each other.
The maximum distance between purlins for SUNGLAZE is 1200mm on centres.
RAFTER SPACING
PURLIN SPACING
1000mm
50mm
Ensure minimum roof pitch
Make a spacer bar
Spacer Bar
565mm
600mm
Conrm that the roof pitch is at least 5%
(50mm rise for 1m length).
This minimum pitch will ensure proper
water runoff and help keep the Roof
Panels clean.
3
4
Create a spacer bar as a jig to easily measure the distance between aluminum proles during
installation. Use a dowel, a 25x50mm, or similar.
The spacer bar should be 565mm long.
Make sure the edges are perfectly square cut.
SEE PAGE 6 for spacer bar use.

Installation Guide: SunTuf SunGlaze
Superior Residential Polycarbonate Glazing System
Use a drop saw or angle grinder to cut each prole component to the exact length required.
• Make sure your cuts are straight; exactly perpendicular to the prole.
• Smooth rough edges with a metal le as needed.
Measure and cut all aluminum Bottom, Middle and Top Caps to correct length if required.
The proles should be at least 1cm longer than the panels.
NOTE: The aluminum proles are already in the required length to suit the supplied sheets length.
Measure twice, cut once!
Always orient the cut edge of each
aluminum prole toward the top of the roof.
B
A
CUT EDGE
OF PROFILE
TOWARD
ROOF
TOP END
Max 600 mm
Max 600 mm
Max 600 mm
50mm
50mm
Min 50
Overhang
PROFILE
RAFTER
Wall
RAFTER INSTALLATION PURLIN INSTALLATION
Measure distance
between purlins centre
to centre.
PROFILE
PURLIN
PURLIN
PURLIN
Measuring & Cutting Aluminum Proles
Drilling Holes in the Proles
56
Before drilling holes, place the Bottom & Edge Bottom Glazing Bars over a strip
of wood. This will protect the end of the drill bit as it penetrates the proles.
• Measure, mark and pre-drill 5mm screw holes in each Bottom Glazing Bar.
• Follow the hole spacing guidelines below for rafter or purlin installation to match your roof support
structure.
• Make sure all holes are centred along the notch in the middle of each Bottom Glazing Bar
Here’s how to measure the proper Prole length:
• ADD – Roof overhang (50mm minimum to 100mm maximum) (A)
• PLUS – Length of roof run (B)
• EQUALS – Total length of each Bottom, Middle and Top Cap.
Bottom Glazing Bar Edge Bottom Glazing Bar
Wall
Before Installation

Installation Guide: SunTuf SunGlaze
Superior Residential Polycarbonate Glazing System
Bottom side only!
Remove the protective lm from the bottom of the Panel before installation.
9
• Flush End Caps are to be xed using the supplied 10g x 25 mm Self Drilling Screws to the Bottom
& Edge Bottom Glazing Bars at the end which will be located at the top of the roof closest to the
building or home before the Glazing Bars are xed to the structure. (Note the Standard & Edge Cap
will be xed at the spouting end of the roof).
• Out of the box, the Roof Panels and Prole parts are
already cut to the proper size to t together.
• If cutting Roof Panels is required, here’s how to measure
the proper Roof Panel length:
• A – Length of aluminum Prole
• B – MINUS 3mm for every 1.0m of aluminum Prole
• EQUALS – Total length of each Roof Panel
• For example, if your aluminum Prole is 4 meters long, then your Roof Panel will be 3.988m long.
A-B=Roof Panel Length
B
A
Roof Panels must be cut shorter than Proles to allow for panel expansion
during hot weather. See the proper calculations above.
Fastening Flush End Caps.
7
Measure and cut all Roof Panels to the correct length, if required.
8
Flush End Caps for Bottom Glazing Bars
Before Installation
Flush End Caps for Edge Bottom Glazing Bars
Note: Edge Bottom Glazing Bar is to be installed if a cut
panel is required.

Installation Guide: SunTuf SunGlaze
Superior Residential Polycarbonate Glazing System
Fasten two Bottom Glazing Bars at or near the centre of the roof.
1
• Stand between rafters and start at top of rooine.
• Centre the prole in the middle of the rafter.
• Fasten screws in pre-drilled holes along the length of the rst Bottom Glazing Bar.
• Using the spacer bar at every hole, fasten screws through the pre-drilled holes along the second Bottom
Glazing Bar
Fasten SECOND Bottom Glazing Bar
Fasten FIRST Bottom Glazing Bar
USE SPACER
BAR AT
EACH HOLE
Place the rst Roof Panel between the installed Bottom Glazing Bars.
2
• Make sure the raised edges of the Roof Panel are seated along the length of both Bottom Glazing Bars.
A
B
Add the third Bottom Glazing Bar
3
• Using the spacer bar at every
hole, fasten screws through
the pre-drilled holes along
the third Bottom Glazing Bar.
Installation
Do not install more than two Bottom Glazing Bars at a time. Otherwise, you risk
accumulated measurement deviations across the roof.
USE SPACER
BAR AT
EACH HOLE

Installation Guide: SunTuf SunGlaze
Superior Residential Polycarbonate Glazing System
• After two adjacent Roof Panels are in place, install a Middle Glazing Bar over the Bottom Glazing Bar
between them. This will secure down two adjacent Roof Panel edges.
• Fasten the Middle Glazing Bar at 300 mm centres using the 12g x 20mm xings.
• Start fastening the Middle Glazing Bar at the bottom of the roof line, and work toward the top.
• Use adjustable impact driver or cordless drill and avoid over tightening so the screw will not strip the
threads out.
• Add another Middle Glazing Bar in between every two new panels.
Inner Prole Cap
• Install the Top Cap Cover by gently tapping it into place with a rubber mallet.
• Use a piece of wood to disperse the impact of the mallet and avoid damage to the Prole.
• Start at the bottom of the roof line and work toward the top.
• Remove the protective lm after each Roof Panel is fully installed and secured.
Top Cap
Installation
Installing Middle Glazing Bar
4
Before fastening, align the Middle Glazing Bar with the Bottom Glazing Bar
The Middle Glazing Bar must be fully fastened before adding the top cap.
It is very difcult to remove the Middle Glazing Bar after installation.
NOTE: Use cordless drill.
Start at bottom,
work toward top.
Installing Middle Glazing Bars
5

Installation Guide: SunTuf SunGlaze
Superior Residential Polycarbonate Glazing System
• Set the uncut end Roof Panel in place. On the Roof Panel, note the centre line of the end rafter.
Then subtract 9mm and mark that as your rip line along the Roof Panel.
9mm
Centre Line Rip Line
End
Rafter
• Bring the sheet to the ground. Cut the Roof Panel along the rip line.
• Cut the Panel Gasket to the length of the Roof Panel.
• Then t the cut Panel Gasket to the cut edge of the Roof Panel.
• Still on the ground, insert the End Panel Gasket and Roof Panel into the Edge Bottom Glazing Bar.
• Gently tap the Edge Bottom Glazing Bar with a rubber mallet to fully seat the Panel Gasket.
• Hammer against a length of wood to prevent damage to the Edge Bottom Glazing Bar.
Installing Edge Bottom Glazing Bars with cut Roof Panels.
8
A
C
D
B
Measuring Roof Panels for left/right side of roof
Cutting Roof Panels for left/right side of roof
6
7
If you do not need to rip cut your nal two roof panels, skip to step 14. You will
rip cut the nal left and right Roof Panels to t (if required) before you install
the Edge Bottom Glazing Bar. See below.
On Ground
The gap behind the Panel
Gasket is normal, and helps
account for expansion of
the Roof Panel.
Installation

Installation Guide: SunTuf SunGlaze
Superior Residential Polycarbonate Glazing System
• Bring the entire assembly to the roof and set it in place.
• Start fastening the Edge Bottom Glazing Bar to the timber structure using the 8G x 50 mm at the bottom
of the roof line, and work towards the top. Use the Spacer to make sure the Edge Bottom Glazing Bar is
at 600 mm centres.
• Install the Top Cap by gently tapping it into place with a rubber mallet.
• Use a piece of wood to disperse the impact of the mallet and avoid damage to the Prole pieces.
• Start at the bottom of the roof line and work toward the top.
• Remove the protective lm after each Roof Panel is fully installed and secured.
The Edge Bottom Glazing Bar must be fully fastened before adding the Top Cap.
It is very difcult to remove the End Prole Cap Cover after installation.
• Fasten the Edge Middle Glazing Bar at 300 mm centres using the 12g x 20 mm xings.
• Start fastening the Middle Glazing Bar at the bottom of the roof line, and work toward the top.
• Use adjustable compact driver or cordless drill and avoid over tightening so the screw will not strip
the threads out.
NOTE: Use Cordless drill.
Fixing both the left and right side Edge Bottom Glazing Bar.
9
Install the Top Cap Covers on both left and right Edge Bottom Glazing Bar.
Install the Edge Middle Glazing Bar on either the left and right side Edge Bottom Glazing Bar.
10
11
Installation

Installation Guide: SunTuf SunGlaze
Superior Residential Polycarbonate Glazing System
• Insert the Top Cap at the bottom of the roof line, and work toward the top by gently tapping it into
place with a rubber mallet.
• Use a piece of wood to disperse the impact of the mallet and avoid damage to the Prole pieces.
Start at the bottom of the roof line and work toward the top.
• Install the Edge End Cap at the bottom of the roof (spouting end) using the 10g x 25 mm Self Drilling
Screws provided. To make sure your cordless drill torque setting is set correctly, complete a trial rst.
• Remove the protective lm after each Roof Panel is fully installed and secured.
Installing Left and Right End uncut Roof Panels.
12
Installing Left and Right Edge End Cap and Cap Covers.
13
Installation
Screws are not included
in SUNGLAZETM Kit
Installing Head Wall Flashing (Not included in SUNGLAZETM Kit)
14
Silicone (Not included in SUNGLAZETM Kit)
15
Note: If the Edge Bottom & Middle Glazing Bar is installed then the Head Wall Flashing notch will need
to be trimmed to accommodate the slightly wider prole
Please note: SunTuf SunGlaze is weather resistant not waterproof. All ashings and junctions that are
installed must comply with local building regulations and the responsibility of the installer.
This manual suits for next models
1
Table of contents
Popular Outdoor Furnishing manuals by other brands

Absco
Absco 23151SK Assembly instructions

Lanscape Forms
Lanscape Forms FGP Series installation guide

Thomasville
Thomasville Crystal Bay 5000048-0106102 Assembly instructions

Target
Target Threshold 009050409 Assembly instructions

Mercia Garden Products
Mercia Garden Products 01GRO0606-V1 General instructions

Forever Redwood
Forever Redwood ENSENADA WOODEN ROCKING CHAIR Assembly instructions