INSTALLATION PROCEDURES
WARNING: Maximum water pressure (including any potential pressure spikes) of the water
supply line to the system must not exceed 100 PSIG (690 KPA). Failure to comply will void the
warranty. The manufacturer accepts no liability for damage caused by excessive water
pressure.
1. Once the unit and filtration system flushing procedures are complete, determine the best
installation location. Consider user convenience, electrical access and water access. The unit
performs optimally if within 20 feet of a cold- water supply line. Connect only to a cold
water supply. Do not install Feed Water Assembly on the Hot Water Line. Do not
place unit where it will be exposed to rain, freezing temperatures or direct sunlight.
2. The rear of the unit should be installed at least 2” (5 cm) from any vertical surface to ensure
proper air circulation.
3. Always check local plumbing codes before tapping into water supply line and drain line. Tap
into the supply line with an approved connector.
4. Use only ¼” OD copper or plastic tubing to connect your water supply and drain to the cooler
water inlet and drain port. The inlet and drain ports are quick connect fittings. Units are
shipped with plugs in each fitting. Remove the plugs prior to inserting water supply and drain
lines. A water shut off valve is recommended between the inlet connection to the cooler and
the water supply connection.
5. The PW90 RO system requires a waste or drain line for the RO membrane. The drain line
should include an Air Gap and back flow restrictor. See diagram.
6. Check the available power supply to assure proper electrical service. In the U.S., the voltage
specification is 115 volt 60 hertz. Voltage outside of this specification will affect the system
performance
7. Water filtration system will begin operating, verify proper water production.
8. Turn the Heating System switch on the back of the unit to the “ON” position.
9. Perform final inspection of all installed water lines to ensure a leak free installation.
10. Instruct user on proper system operation.
To Dispense Cold Water:
Allow at least 30 minutes for adequate cooling, then press the Cold Water button.
To Dispense Hot Water:
Allow at least 30 minutes for adequate heating, then press the two Hot Water Buttons simultaneously
NOTE: Check UPC and Local Plumbing Codes to confirm that all connections are in
compliance.