puroflux PF-20 Series User manual

OPERATION AND MAINTENANCE MANUAL
PF-20 Series
Permanent Media Filters
PUROFLUX
FILTRATION AND CONTROL SYSTEMS
CORPORATION

PUROFLUX CORPORATION
PAGE # 2 PF-20 Series Filter (ver. 1/20/10)
PF-20 SERIES PERMANENT MEDIA FILTERS
INTRODUCTION
PUROFLUX is the right choice when it comes to having a more efficient, safe, and effective system. The
PF-20 series filters are designed to assist in eliminating expensive "down-time," reducing operating costs,
chemical usage, wear and tear on equipment and maintenance. With over 30 years of combined filtration
experience, PUROFLUX engineers can find a solution to a wide variety of filtration problems.
Following the guidelines listed in this manual will help to insure the safety of all personnel who maintain
the filter unit and related equipment. If there are any questions on the procedures or performance of the
PF-20 series filters contact the local factory representative or call the factory direct at (805)579-0216.
Do Not, operate the filter until all questions about operating procedures are answered by a qualified
representative. This manual covers recommended procedures for installation and anchoring, start-up and
shut down, and safety and maintenance.
Puroflux Corporation
1357 Kuehner Drive, Simi Valley, CA 93063
Phone (805)579.0216 • Fax (805)579.6005
Website: www.puroflux.com
E-Mail: [email protected]
Please read this OPERATION AND MAINTENANCE MANUAL thoroughly and understand
all safety related issues before attempting any work on the PF-20 series filter.
NOTE: All recommendations are minimums. The environment/operating conditions in which the filter
unit is installed will dictate the frequency of scheduled maintenance. Maintaining your PF-20 series
filter will assure a long trouble free life.
NOTE: Puroflux reserves the right to change, modify, or revise this manual at any time without prior
notification.

OPERATION AND MAINTENANCE MANUAL
PAGE # 3
PF-20 Series Filter (ver. 1/20/10)
SECTION 1
Receiving and Installation 4
Receiving Equipment 4
Design Criteria 5
Support and Lifting 5
Installation and Anchoring 5
Piping Interface Connections 6
Loading Media 7
Electrical Controls 8
Wiring Requirements 9
SECTION 2
Theory of Operation 10
Operation and Maintenance 10
General Maintenance 10
24 Hour Time Clock Settings 11
Pump Pre-Strainer 12
Pump and Motor 12
Cleaning and Adjusting Pump 12
Filter Vessel 13
Backwash Cycle 13
Start-Up Procedure 14
Operation In Cold Weather 15
Shutdown 15
Recommended Spare Parts 16
Fluid Treatment 16
Safety 16
SECTION 3
Warranty 17
Figure 3 18
TABLE OF CONTENTS

PUROFLUX CORPORATION
PAGE # 4 PF-20 Series Filter (ver. 1/20/10)
Table I ñ Receiving /
Inspection
Filter Vessel
Control Panel (Automatic Units)
Pump & Motor
Pump Pre-strainer
Gauge Kit
Valves & Linkage
Actuator (Automatic Units)
Face Piping
Media
RECEIVING AND INSTALLATION
Recommended procedures for the receiving of equipment
and proper installation of the PF-20 series permanent
media filter.
RECEIVING EQUIPMENT
Before accepting the filter equipment and prior to signing
the bill of lading, all equipment should be checked
thoroughly for any shipping damage. Make sure that all
required equipment noted on the bill of lading is received.
Refer to Figure 1 and Table I for components to be
inspected upon receiving.
Check the model and serial number against the packing
slip. Serial and model numbers can be found on a
nameplate inside the control cabinet (automatic unit) or
on the vessel skid (manual unit).
SECTION 1
Air Vent Valve and
Pressure Guage
Lined Carbon
Steel Vessel
with Internals
and Media
Electric Actator
(Automatic Units)
Sch 80 PVC Face Piping
Service Flanges
Cast Iron Pump with
Pre-Strainer
Coated Steel Skid
Drain
Nema 4X
Control Cabinet
(Automatic Units)
Bronze
Control
Valve
Handhole/Manhole
(TYP 2 PLC’S)
Pressure Switch
Figure 1
Stainless
Steel Vessel
Air Vent Valve and
Pressure Guage
Coated Carbon
Steel Handholes Control Valve
Electric Actator
(Automatic Units)
Sch 80 PVC Face Piping
Service Flanges
Cast Iron Pump
with Pre-Strainer
Coated Steel Skid
Drain
Pressure Switch
Nema 4X
Control Cabinet
(Automatic Units)

OPERATION AND MAINTENANCE MANUAL
PAGE # 5
PF-20 Series Filter (ver. 1/20/10)
SUPPORT AND LIFTING
The PF-20 series filter can be lifted from the bottom of the filter skid with the skid fully supported. If the
unit is hoisted, lifting straps must be placed under the bottom of the filter skid and should not come in
contact with the filter components.
INSTALLATION AND ANCHORING
The PF-20 series filter is designed for slip stream use on non-pressurized open sump or pressurized closed
system applications. The PF-20 series filter should be located as close to the sump or interface piping as
possible and never install in full flow system piping.
The PF-20 filter can be rigidly anchored to the floor using 1/2 inch anchor bolts. Refer to the specification
drawing for location of anchor holes.
After the PF-20 series filter is installed in its permanent location, the gauge kit should be installed on the
top of the filter vessel (refer to Figure 1).
NOTE: The PF-20 filter should not be installed more than 8 feet above the process liquid operating
level.
NOTE: Never install the PF-20 series filter in an application where the system pressure exceeds the
filter design pressure.
DESIGN CRITERIA
The PUROFLUX PF-20 series filter is designed for use in both open and closed (75 psi or less) process
liquid filter applications (higher design pressures are available). The PF-20 series filter with standard
media will remove suspended solids down to 10 microns (optional 5 micron and lower media is available).
The PF-20 series filter is constructed of a stainless steel vessel with coated carbon steel handholes,
industrial grade ball valves, Sch 80 PVC interconnecting piping, cast iron pump, and cast iron
pre-strainer with removable stainless steel basket.
The PUROFLUX PF-20 series lter is designed for use in both open and closed (75 psi or less) process liquid
lter applications (higher design pressures are available). The PF-20 series lter with standard media will
remove suspended solids down to 10 microns (optional 5 micron and lower media is available).
The PF-20 series lter is constructed of a stainless steel vessel with coated carbon steel handholes,
industrial grade ball valves, Sch 80 PVC interconnecting piping, cast iron pump, and cast iron pre-strainer
with removable stainless steel basket.

PUROFLUX CORPORATION
PAGE # 6 PF-20 Series Filter (ver. 1/20/10)
PIPING INTERFACE CONNECTIONS
The filter piping should be installed as follows:
1. Installation of interconnecting piping
• When mating interconnecting fittings to the filter unit make sure that filter components are securely
held in place so no damage or leaks occur.
• If welding or soldering mating flanges or fittings make sure not to overheat filter components.
Overheating filter components can cause damage or leaks.
• If welding DO NOT use the filter or its components as a ground.
2. Refer to Table ll for piping connection sizes.
3. Run an influent line from the system sump to the pump pre-strainer labeled "INLET". A service valve
and union should be installed in this line near the filter. Refer to specification drawings.
4. Run an effluent line from the filter return labeled "OUTLET" back to the system sump. A service valve
and union should be installed in this line near the filter. Refer to specification drawings.
5. Run a waste line from the filter waste outlet labeled "WASTE" to the nearest sewer drain. Table III on
page 7 lists the minimum and maximum backwash flow rates and volumes for the PF-20 series. A
union should be installed in this line near the filter. Refer to specification drawings.
6. For filters utilizing a source other than the process system water for backwash supply, Table Ill shows
the required backwash flow and volumes. The maximum backwash supply pressure for the PF-20 filter
is 40 psi. Run a line to the connection labeled "BACKWASH." If public or municipal water is used for
backwash, a backflow preventer is required in this line on all units. A service valve and union should be
installed in this line near the filter.
NOTE: Do not put any type of valve in the waste line! The sewer drain must be large enough
to handle and maintain the flow of the backwash cycle. If the drain is not large enough to support the
volume of waste generated during a backwash cycle, it may be necessary to use a reservoir tank to
collect the waste water. The flow from the reservoir tank can then be regulated to the drain.
NOTE: If the filter inlet connection is located above the process liquid operating level, a foot or check
valve must be installed below the water level to prevent loss of pump prime.
NOTE: Do Not reduce the pipe sizes listed, the pipe sizes are minimums. If long runs, excess fittings, or
lifts are necessary, it is recommended to enlarge the pipe diameter in order to reduce friction loss.
Never reduce the waste line; this can restrict the flow of the backwash cycle and reduce efficiency.
NOTE: It is important that all piping and components associated with the filter system installation must
be supported to eliminate stress on the filter and piping.
NOTE: Never overtighten service unions on the filter unit. Service unions should be hand tightened only.
Overtightening can cause damage, which may result in leaks.
NOTE: Always follow local, county, state or other government authorities requirements for piping hook-ups.
TABLE II - PIPING CONNECTION SIZES - DIMENSIONS SHOWN IN INCHES
MODEL - PF20 INLET OUTLET WASTE BACKWASH
12 1 1/2 FPT 1 FPT 1 FPT 1 FPT
18 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT
24 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT
30 2 FPT 2 FPT 2 FPT 2 FPT
36 2 1/2 FPT 2 1/2 FPT 2 1/2 FPT 2 1/2 FPT
42 3 FPT 3 FPT 3 FPT 3 FPT
PUROFLUX CORPORATION
PAGE # 6 PF-20 Series Filter (ver. 1/20/10)
PIPING INTERFACE CONNECTIONS
The filter piping should be installed as follows:
1. Installation of interconnecting piping
• When mating interconnecting fittings to the filter unit make sure that filter components are securely
held in place so no damage or leaks occur.
• If welding or soldering mating flanges or fittings make sure not to overheat filter components.
Overheating filter components can cause damage or leaks.
• If welding DO NOT use the filter or its components as a ground.
2. Refer to Table ll for piping connection sizes.
3. Run an influent line from the system sump to the pump pre-strainer labeled "INLET". A service valve
and union should be installed in this line near the filter. Refer to specification drawings.
4. Run an effluent line from the filter return labeled "OUTLET" back to the system sump. A service valve
and union should be installed in this line near the filter. Refer to specification drawings.
5. Run a waste line from the filter waste outlet labeled "WASTE" to the nearest sewer drain. Table III on
page 7 lists the minimum and maximum backwash flow rates and volumes for the PF-20 series. A
union should be installed in this line near the filter. Refer to specification drawings.
6. For filters utilizing a source other than the process system water for backwash supply, Table Ill shows
the required backwash flow and volumes. The maximum backwash supply pressure for the PF-20 filter
is 40 psi. Run a line to the connection labeled "BACKWASH." If public or municipal water is used for
backwash, a backflow preventer is required in this line on all units. A service valve and union should be
installed in this line near the filter.
NOTE: Do not put any type of valve in the waste line! The sewer drain must be large enough
to handle and maintain the flow of the backwash cycle. If the drain is not large enough to support the
volume of waste generated during a backwash cycle, it may be necessary to use a reservoir tank to
collect the waste water. The flow from the reservoir tank can then be regulated to the drain.
NOTE: If the filter inlet connection is located above the process liquid operating level, a foot or check
valve must be installed below the water level to prevent loss of pump prime.
NOTE: Do Not reduce the pipe sizes listed, the pipe sizes are minimums. If long runs, excess fittings, or
lifts are necessary, it is recommended to enlarge the pipe diameter in order to reduce friction loss.
Never reduce the waste line; this can restrict the flow of the backwash cycle and reduce efficiency.
NOTE: It is important that all piping and components associated with the filter system installation must
be supported to eliminate stress on the filter and piping.
NOTE: Never overtighten service unions on the filter unit. Service unions should be hand tightened only.
Overtightening can cause damage, which may result in leaks.
NOTE: Always follow local, county, state or other government authorities requirements for piping hook-ups.
TABLE II - PIPING CONNECTION SIZES - DIMENSIONS SHOWN IN INCHES
MODEL - PF20 INLET OUTLET WASTE BACKWASH
12 1 1/2 FPT 1 FPT 1 FPT 1 FPT
18 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT
24 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT
30 2 FPT 2 FPT 2 FPT 2 FPT
36 2 1/2 FPT 2 1/2 FPT 2 1/2 FPT 2 1/2 FPT
42 3 FPT 3 FPT 3 FPT 3 FPT
PUROFLUX CORPORATION
PAGE # 6 PF-20 Series Filter (ver. 1/20/10)
PIPING INTERFACE CONNECTIONS
The filter piping should be installed as follows:
1. Installation of interconnecting piping
• When mating interconnecting fittings to the filter unit make sure that filter components are securely
held in place so no damage or leaks occur.
• If welding or soldering mating flanges or fittings make sure not to overheat filter components.
Overheating filter components can cause damage or leaks.
• If welding DO NOT use the filter or its components as a ground.
2. Refer to Table ll for piping connection sizes.
3. Run an influent line from the system sump to the pump pre-strainer labeled "INLET". A service valve
and union should be installed in this line near the filter. Refer to specification drawings.
4. Run an effluent line from the filter return labeled "OUTLET" back to the system sump. A service valve
and union should be installed in this line near the filter. Refer to specification drawings.
5. Run a waste line from the filter waste outlet labeled "WASTE" to the nearest sewer drain. Table III on
page 7 lists the minimum and maximum backwash flow rates and volumes for the PF-20 series. A
union should be installed in this line near the filter. Refer to specification drawings.
6. For filters utilizing a source other than the process system water for backwash supply, Table Ill shows
the required backwash flow and volumes. The maximum backwash supply pressure for the PF-20 filter
is 40 psi. Run a line to the connection labeled "BACKWASH." If public or municipal water is used for
backwash, a backflow preventer is required in this line on all units. A service valve and union should be
installed in this line near the filter.
NOTE: Do not put any type of valve in the waste line! The sewer drain must be large enough
to handle and maintain the flow of the backwash cycle. If the drain is not large enough to support the
volume of waste generated during a backwash cycle, it may be necessary to use a reservoir tank to
collect the waste water. The flow from the reservoir tank can then be regulated to the drain.
NOTE: If the filter inlet connection is located above the process liquid operating level, a foot or check
valve must be installed below the water level to prevent loss of pump prime.
NOTE: Do Not reduce the pipe sizes listed, the pipe sizes are minimums. If long runs, excess fittings, or
lifts are necessary, it is recommended to enlarge the pipe diameter in order to reduce friction loss.
Never reduce the waste line; this can restrict the flow of the backwash cycle and reduce efficiency.
NOTE: It is important that all piping and components associated with the filter system installation must
be supported to eliminate stress on the filter and piping.
NOTE: Never overtighten service unions on the filter unit. Service unions should be hand tightened only.
Overtightening can cause damage, which may result in leaks.
NOTE: Always follow local, county, state or other government authorities requirements for piping hook-ups.
TABLE II - PIPING CONNECTION SIZES - DIMENSIONS SHOWN IN INCHES
MODEL - PF20 INLET OUTLET WASTE BACKWASH
12 1 1/2 FPT 1 FPT 1 FPT 1 FPT
18 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT
24 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT
30 2 FPT 2 FPT 2 FPT 2 FPT
36 2 1/2 FPT 2 1/2 FPT 2 1/2 FPT 2 1/2 FPT
42 3 FPT 3 FPT 3 FPT 3 FPT
MODEL - PF20 INLET OUTLET WASTE BACKWASH
12 1 1/2 FLNG 1 FPT 1 FPT 1 FPT
18 1 1/2 FLNG 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT
24 1 1/2 FLNG 1 1/2 FPT 1 1/2 FPT 1 1/2 FPT
30 2 FLNG 2 FPT 2 FPT 2 FPT
36 2 1/2 FLNG 2 1/2 FPT 2 1/2 FPT 2 1/2 FPT
42 3 FLNG 3 FLNG 3 FLNG 3 FLNG
48 4 FLNG 4 FLNG 4 FLNG 4 FLNG
TABLE II - PIPING CONNECTION SIZES - DIMENSIONS SHOWN IN INCHES
The lter piping should be installed as follows:
1. Installation of interconnecting piping
• When mating interconnecting ttings to the lter unit make sure that lter components are securely held
in place so no damage or leaks occur.
• If welding or soldering mating anges or ttings make sure not to overheat lter components.
Overheating lter components can cause damage or leaks.
• If welding DO NOT use the lter or its components as a ground.
2. Refer to Table ll for piping connection sizes.

OPERATION AND MAINTENANCE MANUAL
PAGE # 7
PF-20 Series Filter (ver. 1/20/10)
* Backwash duration is factory set for 3 minutes.
LOADING MEDIA
The filter media should be installed as follows (refer to Table lV for media quantities).
One Drum = 1/2 cubic foot.
The 20 series filter units are supplied with two types of media (support gravel and filter media). The sup-
port gravel is used at the base of the filter below the underdrain to support the filter media. The filter media
is a spherical based crystalline silica and will remove up to 90% by volume of the suspended solids
10 microns and larger. The filter media will be shipped in 1/2 cubic-foot drums.
1. To load the filter media in the PF-20 series filter, remove the hex nut and crab clamp from the
handhole/manhole ring (be careful not to drop the handhole/manhole into the vessel). Press down on the
handhole/manhole cover until it drops loose. Remove the gasket and rotate the handhole cover lifting it
through the tank ring. Inspect the internals for damage before continuing.
2. Fill the vessel with water until the underdrain assembly is completely submerged in water. Load the
support gravel into the filter vessel first and level it out, then load the 10 micron silica into the vessel and level
it out (refer to Table IV for the amount of media required for each individual PF-20 series filter).
3. Inspect the handhole/manhole, gasket, ring, and cover for foreign matter, and clean all surfaces. Place
the handhole/manhole cover into the vessel. Slip the gasket over the handhole/manhole and reinstall the
crab clamp and hex nut. Align the gasket and crab clamp properly with the handhole/manhole and ring,
before tightening the hex nut. Do not overtighten the hex nut. Overtightening the hex nut can damage the
gasket.
4. Always follow start-up procedures whenever the filter unit has been turned off.
TABLE III - FLOW RATES - FLOWS SHOWN IN GALLONS/MINUTE
MODEL - PF20 FILTER RATE B/W (MAX) B/W (MIN) B/W VOLUME
12 15 15 12 45 GAL
18 35 35 30 105 GAL
24 65 65 55 195 GAL
30 100 100 85 300 GAL
36 140 140 120 420 GAL
42 190 190 162 570 GAL
TABLE IV - MEDIA REQUIREMENTS
QUANTITIES SHOWN IN 1/2 CU.FT.
MODEL - PF20 SUPPORT GRAVEL 10 MICRON SILICA.
12 1 1
18 2 2
24 3 5
30 4 5
36 7 10
42 14 13
* Media quantities depend on vessel construction.
OPERATION AND MAINTENANCE MANUAL
PAGE # 7
PF-20 Series Filter (ver. 1/20/10)
* Backwash duration is factory set for 3 minutes.
LOADING MEDIA
The filter media should be installed as follows (refer to Table lV for media quantities).
One Drum = 1/2 cubic foot.
The 20 series filter units are supplied with two types of media (support gravel and filter media). The sup-
port gravel is used at the base of the filter below the underdrain to support the filter media. The filter media
is a spherical based crystalline silica and will remove up to 90% by volume of the suspended solids
10 microns and larger. The filter media will be shipped in 1/2 cubic-foot drums.
1. To load the filter media in the PF-20 series filter, remove the hex nut and crab clamp from the
handhole/manhole ring (be careful not to drop the handhole/manhole into the vessel). Press down on the
handhole/manhole cover until it drops loose. Remove the gasket and rotate the handhole cover lifting it
through the tank ring. Inspect the internals for damage before continuing.
2. Fill the vessel with water until the underdrain assembly is completely submerged in water. Load the
support gravel into the filter vessel first and level it out, then load the 10 micron silica into the vessel and level
it out (refer to Table IV for the amount of media required for each individual PF-20 series filter).
3. Inspect the handhole/manhole, gasket, ring, and cover for foreign matter, and clean all surfaces. Place
the handhole/manhole cover into the vessel. Slip the gasket over the handhole/manhole and reinstall the
crab clamp and hex nut. Align the gasket and crab clamp properly with the handhole/manhole and ring,
before tightening the hex nut. Do not overtighten the hex nut. Overtightening the hex nut can damage the
gasket.
4. Always follow start-up procedures whenever the filter unit has been turned off.
TABLE III - FLOW RATES - FLOWS SHOWN IN GALLONS/MINUTE
MODEL - PF20 FILTER RATE B/W (MAX) B/W (MIN) B/W VOLUME
12 15 15 12 45 GAL
18 35 35 30 105 GAL
24 65 65 55 195 GAL
30 100 100 85 300 GAL
36 140 140 120 420 GAL
42 190 190 162 570 GAL
TABLE IV - MEDIA REQUIREMENTS
QUANTITIES SHOWN IN 1/2 CU.FT.
MODEL - PF20 SUPPORT GRAVEL 10 MICRON SILICA.
12 1 1
18 2 2
24 3 5
30 4 5
36 7 10
42 14 13
* Media quantities depend on vessel construction.
MODEL - PF20 FILTER RATE B/W (MAX) B/W (MIN) B/W VOLUME
12 15 15 12 45 GAL
18 35 35 30 105 GAL
24 65 65 55 195 GAL
30 100 100 85 300 GAL
36 140 140 120 420 GAL
42 190 190 162 570 GAL
42 250 250 214 750 GAL
TABLE III - FLOW RATES - FLOWS SHOWN IN GALLONS/MINUTE
* Backwash duration is factory set for 3 minutes.
MODEL - PF20 SUPPORT MEDIA FILTER MEDIA
12 1 1
18 2 2
24 3 5
30 4 5
36 7 10
42 14 13
48 Consult Factory
TABLE IV - MEDIA REQUIREMENTS
QUANTITIES SHOWN IN 1/2 CU.FT.
* Media quantities depend on vessel construction.
OPERATION AND MAINTENANCE MANUAL
PAGE # 5
PF-20 Series Filter (ver. 1/20/10)
SUPPORT AND LIFTING
The PF-20 series filter can be lifted from the bottom of the filter skid with the skid fully supported. If the
unit is hoisted, lifting straps must be placed under the bottom of the filter skid and should not come in
contact with the filter components.
INSTALLATION AND ANCHORING
The PF-20 series filter is designed for slip stream use on non-pressurized open sump or pressurized closed
system applications. The PF-20 series filter should be located as close to the sump or interface piping as
possible and never install in full flow system piping.
The PF-20 filter can be rigidly anchored to the floor using 1/2 inch anchor bolts. Refer to the specification
drawing for location of anchor holes.
After the PF-20 series filter is installed in its permanent location, the gauge kit should be installed on the
top of the filter vessel (refer to Figure 1).
NOTE: The PF-20 filter should not be installed more than 8 feet above the process liquid operating
level.
NOTE: Never install the PF-20 series filter in an application where the system pressure exceeds the
filter design pressure.
DESIGN CRITERIA
The PUROFLUX PF-20 series filter is designed for use in both open and closed (75 psi or less) process
liquid filter applications (higher design pressures are available). The PF-20 series filter with standard
media will remove suspended solids down to 10 microns (optional 5 micron and lower media is available).
The PF-20 series filter is constructed of a stainless steel vessel with coated carbon steel handholes,
industrial grade ball valves, Sch 80 PVC interconnecting piping, cast iron pump, and cast iron
pre-strainer with removable stainless steel basket.

PUROFLUX CORPORATION
PAGE # 8 PF-20 Series Filter (ver. 1/20/10)
ELECTRICAL CONTROLS
The PF-20 series filter can be supplied in a number of configurations and voltages. Standard voltages
include 460v/3Ø/60hz, 230v/3Ø/60hz, 208v/3Ø/60hz (additional alternate voltages are available). Primary
voltage will be reduced to 120v control voltage. Control components will vary depending on filter configu-
ration and options.
1. Standard filter units supplied with automatic backwash are equipped with a NEMA type 4X control cabinet
containing a locking combination on/off disconnect switch with motor circuit protection (MCP), control
transformer (primary/120v secondary), adjustable backwash timer, 24 hour backwash time clock, magnetic
motor starter (external backwash source units only), pressure differential switch, electric valve actuator,
terminal strip and manual override push button.
2. Manual filter units are provided with a manually controlled valve positioner and exclude all control
components and motor protection.
NOTE: Optional control items may include: programmable logic controller (PLC), indicating lamps, delay
timer, audio and visual alarms, dry contact signals, and hand-off-auto (HOA) switch.
NOTE: A NEMA type 3R coated steel enclosure may be supplied as an alternative to the
NEMA type 4X polycarbonate enclosure on certain units.

OPERATION AND MAINTENANCE MANUAL
PAGE # 9
PF-20 Series Filter (ver. 1/20/10)
Automatic Units:
1. Install circuit breaker between the closest branch distribution panel and the control panel (refer to
Table V for amperage draw by motor horsepower). The control cabinet is pre-wired and includes a door
disconnect switch with overload and short circuit protection.
WIRING REQUIREMENTS
NOTE: Always follow local, county, state or other government authorities requirements for electrical
hook-up.
Manual Units:
1. Install a circuit breaker between the closest branch distribution panel and the pump motor (refer to Table V
for amperage draw by motor horsepower).
2. Install an externally operated switch with fuse protection and door interlock in plain sight of the filter.
Fuse protection must be sized to handle starting and full load amperage draws.
NOTE: All incoming power supply lines must be connected to the door disconnect.
TABLE V - ELECTRICAL REQUIREMENTS
MOTOR HP MOTOR VOLTAGE AMPERAGE 1 PHASE
1 110, 208, 220 16, 9, 8
2 110, 208, 220 24, 14, 12
MOTOR HP MOTOR VOLTAGE AMPERAGE 3 PHASE
1 208, 240, 460 5, 4, 2
2 208, 240, 460 8, 7, 4
3 208, 240, 460 11, 10, 5
5 208, 240, 460 17, 16, 8
7 1/2 208, 240, 460 25, 22, 11

PUROFLUX CORPORATION
PAGE # 10 PF-20 Series Filter (ver. 1/20/10)
THEORY OF OPERATION
Influent (unfiltered) fluid is drawn via the pump into the filter piping, where it enters the overdrain (upper
internals). The influent fluid is dispersed over the filter media evenly. Suspended solids are trapped in the
pores formed between the media. The effluent (filtered) fluid then passes from the vessel through the
underdrain (lower internals) and is returned to the system.
The differential pressure increases as the trapped particles load the media. When the differential pressure
reaches 16 psi, a backwash cycle is required. The control valves are repositioned, reversing the flow and
the media is backwashed. The reverse flow lifts and churns the media causing a scouring action to release
the trapped debris. The trapped debris is then pushed up through the overdrain and flushed to drain. On
completion of the backwash cycle, the valves are repositioned and the filtration process continues.
OPERATION AND MAINTENANCE
The following information pertains to the procedures, operation and general maintenance of the PF-20 series
permanent media filter.
Please read this entire OPERATION and MAINTENANCE MANUAL thoroughly and understand all safety
related issues before attempting any work on the PF-20 series filters.
GENERAL MAINTENANCE PROCEDURES
Always follow the start-up and shut down procedures before and after any service or maintenance is done on
the filter unit. The PF-20 series filters are designed for low maintenance and minimal service. With proper
care the PF-20 series filters will provide trouble free service. The following is a list of maintenance check
points and schedules.
1. Visually inspect filter every 48 hours (minimum) for proper operation
(check for unusual noise and/or vibration).
2. Read pressure gauge (gauge reading should not exceed 75 psi).
3. Backwash filter every 48 hours (minimum).
4. Never allow differential pressure to increase above 16 psid.
5. Check media condition every 6 months (replace if needed).
6. Inspect filter internal assembly each media change.
7. Clean pump pre-strainer before blind-off occurs (check as often as environment dictates).
8. Check condition of gaskets (filter and pre-strainer) each time the filter is serviced.
9. Check voltage and amperage draw on motor lead.
NOTE: All recommendations are minimums. The environment/operating conditions in which the filter
unit is installed will dictate the frequency of scheduled maintenance. Maintaining your PF-20 Series
filter will assure a long trouble free life.
SECTION 2

OPERATION AND MAINTENANCE MANUAL
PAGE # 11
PF-20 Series Filter (ver. 1/20/10)
The 24 hour time clock initiates a backwash cycle at any specified time in the day. The backwash
clock comes preset from the factory for a backwash cycle to occur once every 24 hours of run time
(refer to Figure 2).
By moving the pins (in or out) on the 24 hour time clock, the number of backwash cycles in a 24 hour
period can be adjusted. Every pin represents 15 minutes of a 24 hour period. For every non-consecutive
pin pulled out in a 24 hour period, the filter will backwash. The time clock can only initiate a backwash once
every 1/2 hour. Pins pulled out consecutively will initiate a backwash once and then lock out any further
backwash cycle 15 minutes for each consecutive pin pulled out. In order to eliminate the 24 hour time clock
from initiating a backwash cycle, move all pins in toward the center.
SETTING 24 HOUR TIME CLOCK
Figure 2
Pin Out
PULL SINGLE PIN OUT
to initiate backwash cycle at
desired time.
NOTE: If a Programmable Logic Controller (PLC) is supplied, a 48 hour clock has been programmed
into the PLC. The automatic backwash cycle is initiated every 48 hours of run time (minimum). Every
initiation of the backwash cycle, whether initiated manually or automatically, will reset the 48 hour clock.
NOTE: The 24 hour time clock is a non-resetting clock.
NOTE: The 7-day timer works in the same manner as the 24 hour time clock except each pin
represents 2 hours.
NOTE: If a Programmable Logic Controller (PLC) is supplied, a 48 hour clock has been programmed
into the PLC. The automatic backwash cycle is initiated every 48 hours of run time (minimum). Every
initiation of the backwash cycle, whether initiated manually or automatically, will reset the 48 hour clock.

PUROFLUX CORPORATION
PAGE # 12 PF-20 Series Filter (ver. 1/20/10)
PUMP PRE-STRAINER
For a diagram of the pump pre-strainer refer to Figure 3 on page 18. The pump pre-strainer housing is
flanged mounted to the pump suction. The pre-strainer contains a corrosion resistant stainless steel
basket with 1/8 inch perforations. The pre-strainer basket must be kept clean and free of debris. Always
follow the shut down procedure before attempting any repairs, adjustments or cleaning. To clean the
pre-strainer basket loosen the four hex bolts that hold the cover in place. Gently lift the cover off the
strainer body (take care not to damage the gasket). If the gasket does not come off in one piece it will
need to be replaced. Before replacing gasket clean all surfaces of old material. Utilize the handle to remove
the basket from the housing. After cleaning the basket reverse the above procedure making sure that the
gasket is in place and tighten the four hex bolts. Always follow the start-up procedures after any
shut-down (refer to page 14).
PUMP AND MOTOR
The pump wet end is cast iron bronze fitted. The close coupled, back pull-out pump and motor assembly
is bolted together with hex bolts for ease of maintenance or repair. The pump utilizes a standard
mechanical seal pressed into the motor bracket, which is bolted directly to the pump volute. The pump
sleeve slides over the motor shaft. The pump impeller is threaded or keyed on to the end of the motor shaft
and locked in place with a hex jam nut (for a diagram refer to Figure 3 on page 18).
The pump flows for the PF-20 series filters are listed in Table III on page 7 at 50 feet of head (TDH). This
correlates to approximately 22 psi discharge pressure at design flow.
CLEANING & ADJUSTING PUMP
Always follow the shut down procedure before attempting any repairs or adjustments. The impeller should
spin freely. If not, check for an obstruction or debris that may be lodged between the impeller and volute or
impeller and adapter bracket. If no debris can be found and the impeller remains obstructed remove the
bolts holding the volute to the motor bracket and the two bolts holding the motor to the base (refer to
Figure 3 on page 18). Slide the motor and motor bracket away from the pump volute. Inspect the volute for
foreign material. Reverse the above procedures to reassemble (replace any gaskets which are not in good
condition). Rotate the pump shaft manually after assembly to check clearance. Always follow the start-up
procedures whenever the filter unit has been turned off.
WARNING: Disconnect and lock out all electrical power to the filter prior to performing pump maintenance.
NOTE: Always relieve internal vessel pressure before attempting any repairs or adjustments on the filter unit.

OPERATION AND MAINTENANCE MANUAL
PAGE # 13
PF-20 Series Filter (ver. 1/20/10)
FILTER VESSEL
The filter vessel is constructed of stainless steel with coated carbon steel handholes/manholes. The
vessel is designed with a handhole/manhole located in the upper head for service. The internals are
constructed of corrosion resistance Sch 80 PVC plastic. The underdrain assembly is a header lateral
configuration designed to help induce even flow through the media. The underdrain laterals can be
removed individually by rotating each lateral counter clockwise until all threads are disengaged. The 3 point
overdrain assembly is designed to distribute the influent evenly over the top of the filter media. The
internal assembly should be thoroughly inspected before adding media. To inspect the internals follow the
shutdown procedure. Carefully remove the filter vessel handhole by removing the hex nut on the crab
clamp of the filter vessel (do not drop the handhole into the filter vessel). Refer to Loading Media on
page 7.
BACKWASH CYCLE
When the pressure drop across the media bed reaches its terminal differential pressure (16 psid), it is
necessary to initiate a backwash. The backwash cycle must be completed in order to keep the media
from becoming contaminated. Higher differential pressures drive the debris deep into the media bed where
they cannot be flushed out. Over a period of time, the buildup of debris will cause a media failure and
channeling or plugging of the media will occur.
Automatic Units
Controls are furnished with a factory preset pressure differential switch, manual backwash override push
button and a 24 hour time clock to activate a backwash cycle. Upon an initiation of a backwash cycle the
electric valve actuator will reposition the valves into the backwash mode. The backwash cycle is preset
from the factory for three minutes. After completion of the backwash cycle the electric valve actuator will
reposition the valves into the filter mode. The duration of the backwash time may be adjusted if necessary.
Please consult the factory before adjusting the backwash timer. It is essential that the backwash time
remain at a minimum of three minutes to insure that the media is cleaned properly.
Manual Units
The manual units function in the same manner as the automatic units except the valves have to be man-
ually repositioned into and out of the backwash cycle. The filter unit will need a backwash cycle when the
differential pressure reaches 16 psid or a minimum of every 48 hours. The operator must shut off the pump
before repositioning the valves into or out of the backwash cycle. For filter units utilizing the system for a
backwash supply, reposition the valves, and then turn the pump back on. The backwash cycle should run
three minutes. After completing a backwash cycle, the pump should be turned off and the valves
repositioned to the filter cycle. Once the valves are repositioned, the pump can be turned back on. For
filter units utilizing an external source for a backwash supply, the pump must remain off during the three
minute backwash cycle. After three minutes, the valves are repositioned into the filter position and the
pump can be turned back on.
NOTE: Always relieve any trapped air in the filter vessel.
NOTE: Always relieve internal vessel pressure before attempting any repairs or adjustments on the filter unit.
The lter vessel is constructed of stainless steel with coated carbon steelhandholes/manholes. The vessel
is designed with a handhole/manhole located in the upper head for service. The internals are constructed
of corrosion resistance Sch 80 PVC plastic. The underdrain assembly is a header lateral conguration
designed to help induce even ow through the media. The underdrain laterals can be removed individually
by rotating each lateral counter clockwise until all threads are disengaged. The 3 point overdrain assembly
is designed to distribute the inuent evenly over the top of the lter media. The internal assembly should
be thoroughly inspected before adding media. To inspect the internals follow the shut down procedure.
Carefully remove the lter vessel handhole by removing the hex nut on the crab clamp of the lter vessel
(do not drop the handhole into the lter vessel). Refer to Loading Media on page 7.

PUROFLUX CORPORATION
PAGE # 14 PF-20 Series Filter (ver. 1/20/10)
START-UP PROCEDURE
Before initial start-up or after a long shutdown period, the filter unit should be thoroughly inspected.
1. Close all isolation valves in interconnecting piping and relieve all pressure from the filter system by
opening the manual air relief valve.
2. Loosen the four hex bolts around the pump pre-strainer lid. Remove the lid, inspect gasket and lubricate
if necessary. Clean debris from the pump pre-strainer basket. Prime the pump and associated piping by
filling the pre-strainer housing. Replace the basket and lid thentighten bolts.
3. Turn the pump and motor shaft by hand to insure free rotation.
4. Remove the top handhole/manhole cover by removing the hex nut on the crab clamp by pushing
the handhole/manhole into the vessel (do not drop handhole/manhole). Remove and inspect the gasket
(replace if necessary).
5. Inspect the internal assembly for any damage. Install media as described in Loading Media on page 7.
6. Inspect the handhole/manhole, gasket, ring, and cover for foreign matter, and clean all surfaces. Place
the handhole/manhole cover into the vessel. Slip the gasket over the handhole/manhole and reinstall
the crab clamp and hex nut. Align the gasket and crab clamp properly with the handhole/manhole and ring,
before tightening the hex nut. Do not overtighten the hex nut. Overtightening th hex nut can damage thr
gasket.
7. Prime pump by filling the pre-strainer and associated piping with water (refer to pump pre-strainer on
page 12). Check pump rotation by bumping the motor. Verify rotation with the arrow on the pump volute.
DO NOT run the pump for an extended period of time in reverse direction or dry. Have a qualified
electrician change leads to correct rotation.
8. Open the service valves in the filter inlet, outlet, and backwash lines. Before starting the pump verify all
valves are open. Open the manual air relief valve on top of the filter vessel. Start the pump and fill the
filter vessel. Once a steady stream of water is coming out of the manual air relief valve, and all air has
been evacuated, the manual air relief valve can be closed. Verify the auto air vent is open by turning the
knob located on the top of the unit one half turn.
9. Check the voltage and current of all leads on the pump motor. The correct amperage draw can be found
on the motor nameplate (refer to Table 5 on page 9).
10. Check the filter unit for any unusual noise or vibration. Shut filter unit off and contact your local PUROFLUX
representative or the factory direct if there are any questions about the performance of the filter unit.
11. Check the filter unit and all integral piping to the unit for any air or fluid leaks. All air leaks must be found
and repaired. Failure to do so could result in poor performance and/or personal injury.
12. Backwash the filter (refer to Backwash Cycle on page 13 and Table III on page 7). After backwashing
the filter, check the pressure gauge on top of the filter vessel and record the clean start up pressure. Use
the starting pressure as a bench mark whenever routine maintenance is preformed.
13. After several hours of run time from start up, perform steps 8 through 12 again.
NOTE: An excessive amount of air released from the vent valve can indicate an air leak. All leaks
must be repaired before running the filter unit.
NOTE: Perform the first five recommendations with the electrical power off and locked out. Refer to
the section under "Safety" regarding the safeguarding of maintenance personnel from biological
contaminants prior to start-up.
6. Inspect the handhole/manhole, gasket, ring, and cover for foreign matter, and clean all surfaces. Place
the handhole/manhole cover into the vessel. Slip the gasket over the handhole/manhole and reinstall the
crab clamp and hex nut. Align the gasket and crab clamp properly with the handhole/manhole and ring,
before tightening the hex nut. Do not overtighten the hex nut. Overtightening the hex nut can damage
the gasket.

OPERATION AND MAINTENANCE MANUAL
PAGE # 15
PF-20 Series Filter (ver. 1/20/10)
OPERATION IN COLD WEATHER
When the PF-20 series filter is exposed to below-freezing temperatures, it will require protection to
prevent freezing. An indoor installation in a heated room is the best way to prevent freezing of any liquid
in the filter unit. If an indoor installation is not practical, supplemental heat must be supplied. Heat tape
and insulation around the liquid filled filter components must be used to prevent freezing. The filter unit
should be drained when not in use for long periods of time. Refer to shutdown procedures below.
SHUTDOWN
The following services should be performed when the unit is to be shutdown for a prolonged time period.
1. Run the filter unit through a complete backwash cycle.
2. Shut off and lock out all electrical power.
3. Close the service valves in the filter inlet, outlet and backwash lines.
4. Relieve all pressure from the filter vessel and piping. Open the manual relief valve located on top of the
vessel and leave the valve open.
5. Drain all external piping to and from the filter.
6. Remove the drain plug on the filter vessel. Allow the liquid to drain. After all liquid has drained
replace the drain plug. Open the drain plug on the pre-strainer housing. Allow all the liquid to drain and
then replace the drain plug.
7. Remove the bolts from the pump pre-strainer cover. Remove the cover and clean debris from the pump
pre-strainer basket. Inspect the gasket and lubricate (replace gasket if necessary). Replace the basket and
cover and tighten bolts.
8. Remove the top handhole/manhole cover by removing the hex nut on the crab clamp by pushing the
handhole/manhole into the vessel (do not drop handhole/manhole). Remove and inspect the gasket
(replace if necessary).
9. Inspect the media for foreign material. Over a period of time, a build up of debris may become imbedded
in the media which cannot be backwashed out. Contaminated media should be discarded. If the media pack
is contaminated, replace the media. If the media is removed, thoroughly inspect the internal assembly before
loading new media (refer to Loading Media and Table IV on page 7). Reinstall the handhole/manhole cover.
10. Close the manual air relief valve located on the top of the vessel.

PUROFLUX CORPORATION
PAGE # 16 PF-20 Series Filter (ver. 1/20/10)
RECOMMENDED SPARE PARTS
PUROFLUX maintains a complete stock of replacement parts. When ordering replacement or stock parts,
be sure to include the unit serial and model numbers.
The following spare parts are recommended:
1. Gaskets for filter vessel handhole/manhole.
2. Pre-strainer gasket.
3. Replacement media.
4. Pump seal and gasket kit.
5. Transformer fuses (automatic units only).
FLUID TREATMENT
Filtration is an effective way of reducing the level of suspended solids in a system. However, it is only one
portion of a complete treatment program. Dissolved solids will not be removed from the system by media
filtration. It is important to realize that the dissolved solids will concentrate, and can cause damage to a
system. Furthermore, airborne impurities and biological contaminants may be introduced into the system
through the equipment being filtered.
To control all potential contaminants, a chemical treatment program must be employed by a competent
professional. Such treatment should be initiated before the system start-up and continued regularly thereafter.
SAFETY
All electrical, mechanical, and rotating machinery are potential hazards. It is important to be familiar
with the design, construction, and operation of all equipment before performing any work. Always
use adequate safeguards (including use of protective clothing where necessary or required) whenever
installing, operating, or working on the equipment.
Care should be taken when working on, near, or around this equipment. Appropriate safeguards must be
established to prevent personnel and/or public from injury and to prevent damage to the equipment,
affiliated system, and premises.
It is important to be thoroughly familiar with the equipment, associated system, controls, and the procedures
set forth in this manual. Only qualified personnel should operate, maintain, and repair this equipment. Always
follow proper procedures and use the correct tools, when handling, lifting, installing, operating, maintaining,
or repairing the equipment. This will aid in the prevention of personal injury and/or property damage.

OPERATION AND MAINTENANCE MANUAL
PAGE # 17
PF-20 Series Filter (ver. 1/20/10)
SECTION 3
WARRANTY
PUROFLUX will guarantee all products to be free from manufactured defects in materials and workmanship
for a period of 12 months from the date of shipment. In the event of any such defect, PUROFLUX will repair
or provide a replacement. NOTE: Pump seals are NOT covered under standard warranty.
This warranty is not extended to any defects that can be attributed to having been caused by accident,
alteration, abuse, misuse, consumer negligence, normal expected wear, chemical corrosion or outside
influences.
To obtain any needed repair(s) or replacement of defective parts or product, a Return Goods Authorization
(RGA) number must first be obtained from PUROFLUX. This will be the record for tracking all items
returned to PUROFLUX. The RGA form must be returned with the defective items in order to insure
proper credit.
Before the replacement part can be sent a purchase order must be issued to cover the cost of each
replacement part and shipping. Upon inspection and an issue of credit of the defective items by PUROFLUX
and/or PUROFLUX'S vendor(s), credit will be issued.
NOTE: Replacement part(s) may be new or remanufactured, at Puroflux's option. All warranty products,
which prove to be defective will be shipped F.O.B. Puroflux's plant. Puroflux will not replace, repair or
pay for any charges without a written agreement prior to such work.
NOTE: Shipping and handling, labor, or repair charges are not covered by PUROFLUX'S warranty policy.
NOTE: Items deemed defective will be replaced with a new or remanufactured part (at PUROFLUX'S
option). This includes both mechanical and electrical components.
NOTE: The return of defective items must be made within thirty (30) days of shipment or the invoice
will be considered due and payable.
NOTE: Any damage to the filter unit during shipment must be claimed at the time of accepting the
filter (note all damage to the filter unit on the bill of lading before signing). All damages received
during shipping are the sole responsibility of the freight company and must be taken care of through the
freight company.

PAGE # 18 PF-20 Series Filter (ver. 1/20/10)
PUROFLUX CORPORATION
FIGURE 3
ITEM DESCRIPTION
1 Case
2 Impeller
4 Motor
14 Shaft Sleeve
26 Impeller Retainer
32 Key
38 O-Ring, Shaft
40 Flinger
71 Adapter, Iron
73 Gasket, Case
89 Seal
89A Seal Retainer
Table of contents
Other puroflux Water Filtration System manuals
Popular Water Filtration System manuals by other brands

AquaTru LLC
AquaTru LLC AquaTru owner's manual

Berkey
Berkey Go Berkey Kit manual

Interpet
Interpet CF1 Instruction manual and set up guide

Bestway
Bestway 58515 owner's manual

ControlOMatic
ControlOMatic MegaChlor Installation & operation manual

Apec Water
Apec Water ROES-UV75 Installation instructions & owner's manual

AQUAPHOR
AQUAPHOR ONYX operating manual

GE
GE GXFM07HBL installation instructions

US Water Systems
US Water Systems Flexx Oxi-Gen FX-150 owner's manual

Watts
Watts OneFlow OF140-4 Installation, operation and maintenance manual

deconta
deconta C 25 L operating instructions

Power Fist
Power Fist 8787681 user manual