
QSW-6300 Series Switches Hardware Installation and Reference Guide
Product Overview
3
2.1.3. Electric Safety 24
2.1.4. Electrostatic Discharge Safety 25
2.1.5. Laser Safety 25
2.2. Installation Environment Requirements 25
2.2.1. Ventilation Requirements 25
2.2.2. Temperature/Humidity Requirements 25
2.2.3. Cleanliness Requirements 26
2.2.4. Grounding Requirements 26
2.2.4.1. Safety Grounding 27
2.2.4.2. Lightning Grounding 27
2.2.4.3. EMC Grounding 27
2.2.5. Lightning Protection Requirements 27
2.2.6. EMI Consideration 28
2.3. Precautions for Fiber Connection 28
2.4. Tools 28
3. INSTALLING THE SWITCH 29
3.1. Installation Procedure 29
3.2. Preparing 29
3.3. Mounting the Switch 29
3.3.1. Mounting the Switch into a Cabinet 30
3.3.2. Mounting the Switch on a Workbench 30
3.4. Installing and Removing the Power Supply Module 31
3.4.1. Installing the AC Power Supply Module 31
3.4.2. Removing the AC Power Supply Module 31
3.5. Connecting the Ground Cable of the Switch 32
3.6. Connecting the External Interface Cables 32
3.6.1. Simple Connection Steps 32
3.7. Bundling the Cables 32
3.7.1. Simple Bundling Steps 33
3.8. Verifying Installation 33
4. VERIFYING OPERATING STATUS 34
4.1. Setting up Configuration Environment 34
4.1.1. Setting up Configuration Environment 34
4.1.2. Connecting the Console Cable 34
4.1.3. Setting Terminal Parameters 34
4.2. Checking Environment before/after Power-on 36
4.2.1. Checking Environment before Power-on 36