Qcells Q.HOME+ ESS HYB G2 User guide

872
872
CAUTION
Energy Meter Wiring & Setting (EM24 RS485 Type)
RS485-A
RS485-B
CGND
CGND
OUT Connector Board
[ EM 24 Meter Setting ]
1) Application : F
2) SYS : 3P.n
3) P int.ti : 1
4) ModBus Address : 1 ( default value )
5) Baudrate : 9600 ( default value )
INVERTER
RS485-A
Energy Meter
42
41
GRID (Mains)
MAIN LOAD
NL1 L2 L3
L1 L2 L3N
CAUTION
IP65
This warranty does not apply to the batteries that
• are not operated in accordance with the operating manuals for their intended purposes.
• have been incorrectly installed or commissioned.
• have been modified, altered or operated with other components not approved by Q CELLS.
• have been physically damaged (e.g. damage from falls or transportation).
• have been damaged by force majeure (e.g. flash of lightning, overvoltage, storm, fire).
• have been treated improperly or negligently in an inappropriate way (including the use in non-recommended ambient conditions).
(Eng) 05/19
Hybrid PCS Installation Quick Guide
Q.HOME+ ESS HYB G2
Q.HOME+ ESS HYB G2 is a hybrid PCS based on the INVERTER and Battery. The weight of the PCS is about 35kg, and the Battery
is about 55kg. Therefore, special care is required when handling. At least two people have to deliver and take it out.
• Do not operate with other components not approved by Q.HOME+ ESS HYB G2.
(Connecting other products in parallel to Q CELLS's products may result in abnormal operation.)
• The internet connection is required to use all functions of Q.HOME+ ESS HYB G2.
• If you have a problem, please contact the installer.
• The Specifications of the product may be modified without prior notice to improve product quality.
• https://www.q-cells.de/service-support/downloadbereich.html
• https://www.q-cells.com/au/main/customer_support/download/brochure.html
Manual Download (Refer to Installation Manual)
Wiring Schematic of Single-Phase System
TN-S Network System (Single-Phase) ▶
CN906
CN2
CN1
CN3
CN4
CN5
CN905CN901CN902CN904
CN906
CN2
CN1
CN3
CN4
CN5
CN905CN901CN902CN904
41 42 43
1
31 32 33 3 6 9
711 1 4
SUB LOADL1N
RS485-B (A) Screw
(A)
(A)
(B)
(B)
(B) Screw
L 35mmL 75mm
PUSH!
2. Connect PV, AC Grid, and Energy meter (See Chapter 5)
CAUTION
1. Open the bottom cover of INVERTER and Battery case. 2. Check inner circuit breaker and terminal in Battery case.
• Make sure the AC circuit breaker, PV switch and DC circuit breaker of the Battery are disconnected before starting electrical cable
connections.
• Battery replacement can only be carried out by qualified personnel. If the Battery needs to be changed, it should be placed with
a product which meets the manufacturer’s specifications.
• Do not mismatch the connection of the electric poles (+) to (-) and (-) to (+) when installing. It may cause electric shock or the product
may permanently be damaged.
• Incorrect Battery polarity connection will damage the product seriously. This damage is not covered by the warranty.
• All other connections should be done before Battery assembly and the Battery interrupter must be off.
1. Battery Connections
The order for assembling the INVERTER and Battery. Please follow the following steps.
3. Connect the (+) and (-) wire (PCS) to the marked teminal (Battery).
And then connect the ground terminal. (See Chapter 5.8.4)
4. Turn the cable gland clockwise to check the tightness.
5. Connect Battery communication cable. If you use more than one
Battery (8kwh or more), use the adaptor (Amphenol) for Battery
communication. (EX. If you use 3 Battery, you need 2 adaptor for
BMS communication.)
When using the adaptor, hold the communication cable and fasten
the silver color of the adaptor to anticlockwise.
7. Close the bottom cover of INVERTER and Battery case.6. Change the switch on.
Switch
Switch
Move the switch
◀ TT Network System (Single-Phase)
872
872
SAVE BMS ID
CN906
CN2
CN1
CN3
CN4
CN5
CN905CN901CN902CN904
(Eng) 05/19
1) Open your mobile browser.
2) Input the URL : https://myess.hansoltechnics.com
3) After connection is made, click the “Go to Installer” icon.
4) Enter your ID and password in the login window.
If you have no account, please join as a member.
5) Click the “Join Membership” link. Membership acquisition and completion.
6) After login, the main installer page appears select Product → Installation.
7) Enter the product information and customer information.
(When you select a country at Product Info, it is automatically set to
the country-specific default setting.)
8) If it is saved successfully, you can see the success message.
It may take 5 to 10 minutes.
9) In order to check operation status, perform the product test. For this purpose,
select Remote → Remote Monitoring. (show in Figure 3-2)
10) When the installed product is in “Run,” click the product serial number.
11) On the product information page, click the “Detailed Product Information” button.
12) On the “Product Details” page, click the “Product Operation Test” button.
CAUTION
- PIN Code is a temporary password that has a-4-digit number
created by the installer.
- This pin code must be delivered for user registration.
3. Installer Account : Use On-line / Internet connection
1) Set on your laptop (shown in Figure 4-2).
ControlPanel → Network and Sharing Center →Change adapter settings → Local Area Connector → Properties
→ Internet Protocol Version 4 (TCP/Ipv4)
- Input the URL : https://myess.hansoltechnics.com
2) Connect the jumper to the connector. (* Install Jumper is required, as shown in Figure 4-3.)
3) Connect the LAN cable between Q.HOME+ ESS HYB G2 and Laptop.
4) Turn the power On (AC Grid On) and PV S/W On.
5) Access to SIM (System Install Manager) http://17.91.23.196:8000
6) Turn the power Off (AC Grid Off) and PV S/W Off.
7) Remove jumper wire for On-line & Internet connection
8) Connect Internet LAN Cable.
9) Turn the power On (AC Grid On) and PV S/W On.
Q.HOME+ ESS HYB G2
- Product Info -
a) Input Product S/N
b) Input random PIN Code (Delivered for user registration)
c) Select Country
(Automatically set to the country-specific default setting)
d) Input user’s Telephone number
e) Input Battery S/N (Enter the number of installed boxes)
f) If the entered value is correct, click the Next button
Installation
01. Product Info.
Refresh Next
* If not agreed to the terms, you may not use the services.
[ Figure 3-1 : Product Information Entry Screen in Step 1 ]
[ Figure 4-2 : Setting Laptop IP ]
Short Bar
[ Figure 4-3 : Connecting Short Bar ]
- Serial No.
- PIN Code
- Device Type
- Inverter Power
- Model Name
- Country
- User Telephone
- Battery1
- Battery2
- Battery3
- Battery4
- Battery5
Product
Image
HSHP4601Z100000001
1234
RES
8 kW
HSHP4601
United Kingdom
012-3456-7890
B62842642684D682464
B62842642684D682465
02. Installation Info. 03. Setup Info 04. Rates Info
a
b
c
f
d
e
CLICK!
[ Figure 3-2 : Remote monitoring test ]
*example “HSHP4607Z100000001” test
Remote Monitoring
Remote
Remote Monitoring
Event History
15/06/2018
08:09:51 HSHP4601Z100000001 95% 14 140 0 0
Product
Product List
Installation
PV Calculator
User
Account Management
VOC Management
Maintenance
Maintenance History
Activity List
Statistics
Operational Statistics
* SIM (System Install Manager) Connection
: Use Off-line & Not an internet connection
5. User Account (Refer to User Guide)
CAUTION
- Turn off Wifi .
- Only turn on Local Area Connection.
IP address :
Subnet mask :
Default gateway :
17
255
17
91
255
91
23
224
1
1
0
2
.
.
.
.
.
.
.
.
.
CN906
CN2
CN1
CN3
CN4
CN905CN901CN902
Short
Bar
Battery Install
1) Click here.
MENU LIST
BMS Rack Install Setting
BMS Setting
Install Setting
Operating Test
Q.HOME+ ESS HYB G2
Install BMS Setting Menu
Count of Batery RACKs : - 1 - ENTER
4. Installing
2) Select the number of batteries you want to install.
Battery Installation Process 1
MENU LIST
BMS Rack Install Setting
BMS Setting
Install Setting
Operating Test
Install BMS Setting Menu
Count of Batery RACKs :
Rack 1 ID = 0X1 Status ConnectingConfigure ID !!!
- 1 - ENTER
2) Wait for the battery to connect.
1) Click here.
Battery Installation Process 2
MENU LIST
BMS Rack Install Setting
BMS Setting
Install Setting
Operating Test
Install BMS Setting Menu
Count of Batery RACKs :
Rack 1 ID = 0X2 Status DoneConfigure ID !!!
- 2 - ENTER
BMS Test
BMS CAN ID COUNT
10X1 3020000
1) If you need to continue installing the battery,
the Additional Settings button appears as shown picture.
2) Repeat steps “Battery Installation Process 1”.
Rack 2 ID = 0X1 Status NOPConfigure ID !!!
MENU LIST
BMS Rack Install Setting
BMS Setting
Install Setting
Operating Test
Install BMS Setting Menu
Count of Batery RACKs :
Rack 1 ID = 0X2 Status DoneConfigure ID !!!
- 2 - ENTER
BMS Test
BMS CAN ID COUNT
10X1 3020000
1) Conversely, if the Battery installation is completed,
the following screen will appear.
2) Then press the following button to complete
the Battery installation.
1) Click here.
2) Select a Country & Region.
3) Click here.
* When you press the button, the screen changes
as shown below. Then proceed as described in
the follwing.
Setting Installation Process
Country / Region Information
S/N : HSHP4601Z100000001
Country : Germany Region: Berlin
IP: 14.34.15.211
80
I Port
Country / Region Config
SAVE and ReSTART
MENU LIST
- HSHP4601 8.0kWh
- PMS S/W : P02.00.05
Apr 16 2019 - 1_-ESS
BMS Setting
Install Setting
Operating Test
Install Setting Menu
6) Check the number of installed batteries.
9) Select Smart Meter and Type.
8) Enable when the battery in need to emergency.
Charging mode (Use Jumper as much as possible)
4) For the max power per string.
5) Select a Feed in Limit percentage
Product Information
3300 [W]
* Range : 1000 ~ 3300W
* “0” : the PV 1 is not installed
Installed PV-1 Power :
3300 [W]
* Range : 1000 ~ 3300W
* “0” : the PV 2 is not installed
Installed PV-2 Power :
42 [%]
* Range : 0 ~ 100 (%)
* 100(%) means “No-Limit Feedin”
* 0(%) means “No Feedin”
Feed In Limit percentage
Automatic Operation type
Server’s IP-address and port
Enable
Enable
Sleep-Mode Disable
PMS External Mode Enable Disable
Enable
Backup Mode
(Generator Charge Only) Disable
Smart Mode
(* The “Smart” type is more advanced Algorithm.)
Basic Mode
Battery Count : 1
Smart Meter Selection
Meter Type : RS485
DO - Meter Model Selection
D0-Bi/Feed-In 4:EM112-DIN.AV0.1.X.S1.X(Gavazzi)
[ Figure 4-1 : Initial setup page block ]
Date / Time Setting
Year/Month/Day 2019 / 4 / 16
8 : 20 : 30
Hour : Minute : Second
SAVE and ReSTART
10) Set the current local time and date
11) After clicking “SAVE and RESTART” on the top of
the window a message saying “Wait for 2 Minute and
press F5” will appear → follow the message.
12) Click “Operating Test”.
※ Please leave the default setting not listed in this manual.
7) Select 3rd Party Connect Enable / Disable.
(Like as : EnergyBase, KIWIGRID, Solar-log)

Other manuals for Q.HOME+ ESS HYB G2

1

Popular Audio & Video Accessories manuals by other brands

PowerStream Watt Reader manual

PowerStream

PowerStream Watt Reader manual

Magnadyne VCS-10 installation manual

Magnadyne

Magnadyne VCS-10 installation manual

CMD bs6396 user guide

CMD

CMD bs6396 user guide

Panasonic DMP-BD60 - Blu-Ray Disc Player installation manual

Panasonic

Panasonic DMP-BD60 - Blu-Ray Disc Player installation manual

Vimar ELVOX 692D Installer's guide

Vimar

Vimar ELVOX 692D Installer's guide

Shure UA845UWB manual

Shure

Shure UA845UWB manual

BBC Bircher Hyperion 3D Quick installation guide

BBC Bircher

BBC Bircher Hyperion 3D Quick installation guide

Dorken DELTA-Sd-FLEXX installation instructions

Dorken

Dorken DELTA-Sd-FLEXX installation instructions

Litioite AP-3035 user manual

Litioite

Litioite AP-3035 user manual

RedEarth SunRise Maxi SRS-1 Series user manual

RedEarth

RedEarth SunRise Maxi SRS-1 Series user manual

BOXLIGHT MimioClarity Technical user guide

BOXLIGHT

BOXLIGHT MimioClarity Technical user guide

Paso CMDS Series Complementary Instructions Sheet

Paso

Paso CMDS Series Complementary Instructions Sheet

BEMKO SES64WH quick start guide

BEMKO

BEMKO SES64WH quick start guide

Vivo Link VL12K12-BULK1V-EU-4K user manual

Vivo Link

Vivo Link VL12K12-BULK1V-EU-4K user manual

SSE Smart Energy Tracker quick start guide

SSE

SSE Smart Energy Tracker quick start guide