14 05/217037-806A
C. Chimney Termination Requirements
• Fluepipeinstalledcrimp/narrowenddown
• Outercasingsinstalledcrimped/narrowendup.(Critical
whenexposedabovetheroof)
• Innercasings:
- directionnotcritical
• Fluepipes:
- sealalljointsincludingreboxspigot.
- xwithaminimumof3stainlesssteelrivets
• Fluepipespacers:
- afxtouepipe
• Fluesystemterminationpoint:
- RefertoAS/NZS 2918:2001 4.9.1, see Figure 17.2
on page 23.
• Fluepipeshallextendnotlessthan4.6mabovetopof
theoorprotectorasperAS/NZS 2918:2001 4.9.1(a)
• Facadeorchasesystems:
- sameruleappliesasabove.
• RoofpenetrationandashingmethodrefertoNZ
Building Code E2. (From 01/07/05)
NOTE:Theseinstructionsapplyto150mmdiameterue
pipesystemsastestedtoAS/NZS 2918:2001
8. Refertosteps1and2underFirebox Installation on
page 10.
9. Preparetheceilingplate andplaceupsidedown over
theuespigot.
10. Install the ue pipes by preferred method – either up
or down the outer casing. Afx each length per the
notesinGeneralInstructions (above).Extendtheue
pipeabovetheoutercasingto suitthe casingcover/
cowlassembly.
11. Ifthe innercasing hasnot beeninstalled,install now.
Refertostep7forminimumheight.
12. Installthecowlassembly,i.e.Topspacer,casingcover
andcowl.
13. Position and secure the ceiling plate with the screws
andspacers.
14. Wipetheuepipetoremovengermarks.
15. Refertostep3underFirebox Installation on page 10.
16. Ifueoffsetisrequired,refertoAS/NZS 2918:2001 4.1
1. Eitherlocatetheapplianceinpositionorbymeasuringat
theceilingmarktheuepipecenterposition.Checkthat
theoutercasingisunobstructedthroughtheatticspace
orroofarea.
2. Spikethecenterwithanail.Transferthispositiontothe
nextsurfaceabove.Plumbbob/laser.
3. Cutouttheceilingpenetrationhole–squareorrectangle
– short axis equals outer casing diameter plus 50mm,
longaxisasrequired.SeeTested Flue System on page
15 and Un-Tested Flue System on page 16. Perform
thesameattheroofpenetration.
4. Frame out the hole with minimum 75mm x 50mm
timber or as required for roong material. Minimum
requirementatroofpenetrationsee NZ Building Code
E2 Acceptable Solution (from 01/07/05).
5. Installtheoutercasingsothat:
i. lower end is ush with the underside of the ceiling
materialand
ii. with the addition of metal “L” brackets, afx to the
outercasing at 90degrees securethe outer casing
centrally to the ceiling and roof nogs. Alternatively
substitutethe “L” bracketsfor 25mmthick non heat
sensitive packers. Secure the outer casing through
thepackers with horizontalxings tothe nogs. See
General Flue System Instructions on page 14for
terminationheight.Theoptionofoutercasingslipsto
betakenintoaccount.
6. Flash the outer casing to the roof material with the
appropriateapprovedashing.
7. If using an outer/inner casing combination, now install
theinnercasingensuringitextendsaminimum200mm
abovethehighsideoftheroofpenetration.Ifnotusinga
combinationseestep11.
Asphyxiation Risk.
• DO NOT CONNECT THIS Appliance
TO A CHIMNEY FLUE SERVICING
ANOTHERAPPLIANCE.
• DO NOT CONNECT TO ANY AIR
DISTRIBUTIONDUCTORSYSTEM.
Mayallowuegasestoenterthehouse.
WARNING
Improper installation, adjustment, alteration, service
or maintenance can cause injury or property damage.
Refer to the owner’s information manual provided with
this appliance. For assistance or additional information
consultaqualiedinstaller,serviceagencyoryourdealer.
WARNING
Fire Risk.
Follow Chimney Connector Manufacturer’s
InstructionsforProperInstallation.
ONLYuseconnector:
WARNING
• Within the room, between appliance and ceiling or
wall.
• ConnectorshallNOTpassthrough:
• Atticorroofspace
• Closetorsimilarconcealedspace
• Floororceiling
Maintainminimumclearancestocombustibles
D. General Flue System Instructions
Refer to ue manufactures instructions for correct
installation.