9|Page
Installaon
Step 1: Once both the orientaon and locaon have
been selected, securely fasten the rack to a suitable back-
ing. As the rack system is extremely heavy when lled
with water, it is imperave that the rack be mounted with
suitable fasteners for the parcular installaon. Mounng
to a drywall backing is not suitable, unless the rack is fas-
tened directly to the wall studs.
Step 2: The use of a by-pass assembly is recommended
as it will allow you to isolate the UV system This will allow
for easier access in case maintenance is required.
Step 3: For water supplies where the maximum ow
rate is unknown, a ow restrictor is recommended so that the rated ow of your parcular RMS
system is not exceeded. The ow restrictor should be installed on the inlet port of the reactor.
Step 4: It is recommended to have a licensed plumber connect the UV reactor to the water
supply and may be a requirement depending on where you are located.
Step 5: Connect both the inlet and outlet to the rack system with the applicable connecons
based on your parcular plumbing requirements. The inlet port of the lters is a 1” FNPT connec-
on and the outlet port of the UV reactor is a 1” MNPT connecon.
Step 6: Once the system has been plumbed in, gently remove the
quartz sleeve from its packaging being careful not to touch the length
with your hands. The use of coon gloves is recommended for this pro-
cedure as oils from the hands can leave residue on the sleeve and lamp
which can ulmately block the UV light from geng to the water.
Carefully slide the sleeve into the reactor unl you can feel it hit the
opposite end of the reactor. Align the sleeve so it centered along the
length of the reactor, then gently push it in to lock it into the internal
centering springs in the far side of the reactor. CAUTION: Pushing too
hard when the sleeve is not aligned can damage the centering springs.
Slide the o-ring onto the sleeve unl it is bued up against the reactor
(See Figure 4).
Figure 4. Quartz
Sleeve Installaon
Step 7: Hand ghten the provided gland nut over the quartz sleeve onto the threaded end of
the reactor. It has a posive stop to prevent over-ghtening. A rm force may be required to fully
ghten the gland nut, but DO NOT USE TOOLS for this step. Insert the provided stainless steel
compression spring into the quartz sleeve. The spring works with the lamp and lamp connector
to create the proper lamp alignment. PLEASE NOTE: DO NOT install a UV lamp inside the quartz
sleeve without the sleeve spring in place.
Step 8: Install the lter cartridges in their appropriate housings. For the RMS branded prod-
ucts, please refer to the RMS Rack-Mount UV System Specicaon chart. PLEASE NOTE: This
chart indicates the correct cartridge posion for the default “le-hand” orientaon with the
water inlet located on the le side of the rack system. If the orientaon was switched, the car-
tridge placement must also be switched. Once the cartridges are in place, use the supplied lter
wrench to “snug” the lter housing onto the lter head (See Figure 5).
Figure 3. Lamp Removal Spacing