MEMS Tilt Beam Instruction Manual
RST Instruments
3.3 MULTIPLE MEMS TILT BEAM INSTALLATION
Determine the MEMS Tilt Beam installation orientation (i.e. Is the Beam to be
installed on the ceiling, wall, or floor). Refer to Figure 4 and adjust mounting brackets
accordingly. Ideally, the beams should be staggered (see Figure 6).
There are two ways to complete this installation:
Installing the odd beams first and then the even beams afterwards
Or, install one beam at a time in succession, by placing beams on top
and then in behind.
In either case, you should end up with a staggered installation as shown in Figure 6.
The following installation procedure is for installing one beam at a time in
succession.
1. Thread a 10mm nut onto the first two anchors until they reach the desired
position (ensure the nuts are in plane, not necessarily the same distance from
the wall as the wall may be bowed)
2. Place a Belleville washer over the 1st and 2nd anchors (see Figure 6)
3. Place a Nylon washer over the 1st and 2nd anchors
4. Place a Nylon bushing over the 1st and 2nd anchors
5. Slide the MEMS Tilt Beam onto the Nylon Bushings
6. Place a Nylon Washer over the 1st and 2nd anchors
7. Place a Belleville washer over the 1st and 2nd anchors (see Figure 5 or 6)
8. Thread a 10mm nut onto the 1st anchor, finger tight, and ensure that the Beam
is horizontal or vertical
9. Tighten the nut 2-3 wrench flats (120-180)
10.Thread a 10mm nut onto the 3rd anchor (position nut so that the next beam
when installed will be parallel to the previously installed beam (see Figure 6)
11.Place a Belleville washer and then a Nylon washer and Nylon Bushing over the
nut installed in step 10 (see Figure 6)
12.Place a Belleville washer and then a Nylon washer and Nylon Bushing over the
Belleville washer on the 2nd anchor (see Figure 6 for orientation of washers)
13.Slide the MEMS Tilt Beam onto the 2nd and 3rd anchors, adjust the nut on the 3rd
anchor until the beam is parallel
14.Place a Nylon Washer, and then a Belleville washer over the 2nd and 3rd anchor
15.Place a Nylon bushing over the 2nd and 3rd anchor
16.Thread a 10mm nut onto the 2nd anchor, finger tight, and ensure that the Beam
is horizontal or vertical
17.Tighten the nut 4-5 wrench flats (240-300)
18.Repeat steps 10-17 incrementing anchor references by 1 (i.e. in step 10, the 3rd
anchor would now become the 4th anchor etc.)