
6.3.3 Moving the parallelograms into
transport position 47
6.3.4 Folding the implement 50
6.4 Preparing the implement for
operation 51
6.4.1 Unfolding the implement 51
6.4.2 Selecting the parallelograms and
moving them into working position 51
6.4.3 Setting up the support wheels 54
6.4.4 Aligning the parallelograms on the
rows 58
6.4.5 Adjusting the hoeing width 59
6.4.6 Adjusting the hoeing depth 61
6.4.7 Activating or deactivating the hoe
protection discs HSZ 62
6.4.8 Adjusting the hoe protection discs
HSZ 63
6.4.9 Adjusting the RowDisc hoe
protection discs 67
6.4.10 Activating or deactivating the finger
hoes 73
6.4.11 Adjusting the finger hoes 75
6.4.12 Adjusting the ridging tools 78
6.4.13 Activating or deactivating the tine
weeder 86
6.4.14 Adjusting the tine weeder 87
6.4.15 Setting the band sprayer 87
6.4.16 Adjusting the row sensor 91
7Using the implement 95
7.1 Using the KPP-LSC implement or
KPP-MSC implement 95
7.1.1 Using the implement 95
7.1.2 Turning on the headlands 96
7.2 Using the KPP-M implement 98
7.2.1 Using the implement 98
7.2.2 Turning on the headlands 99
8Eliminating faults 101
9 Parking the implement 103
9.1 Moving the parallelograms into
working position to park the
implement 103
9.2 Attaching the parking supports 104
9.2.1 Attaching the parking supports
when parking the folded implement 104
9.2.2 Attaching the parking supports
when parking the unfolded
implement 107
9.3 Uncoupling the 3-point mounting
frame 110
9.4 Uncoupling the ISOBUS lines 110
9.5 Uncoupling the power supply 110
9.6 Disconnecting the hydraulic
hose lines 111
10 Repairing the implement 112
10.1 Maintaining the implement 112
10.1.1 Maintenance schedule 112
10.1.2 Checking the hydraulic hose lines 113
10.1.3 Checking the lower link pins and
top link pins 113
10.1.4 Replacing Rapido duckfoot shares 114
10.1.5 Replacing RapidoClip duckfoot
shares 115
10.1.6 Replacing the Rotavator blade 116
10.1.7 Replacing finger hoes 117
10.2 Lubricating the implement 118
10.2.1 Overview of lubrication points 119
10.3 Cleaning the implement 121
11 Loading the implement 122
11.1 Loading the unfolded implement
with a crane 122
11.2 Loading the folded implement
with a crane 123
11.3 Lashing the unfolded implement 123
11.4 Lashing the folded implement 125
12 Disposing of the implement 126
MG7104-EN-II | E.1 | 15.09.2023 | © SCHMOTZER
II