
26002 92020
-
SAC 750 & SAC 900 & SAC 1100 & SAC 1300 & SAC 1400
DECLARATION OF CONFORMITY
Sleipner Motor AS
P.O. Box 519, Arne Svendsensgt. 6-8
N-1612 Fredrikstad, Norway
Declare that this product with accompanying standard control systems complies with
the essential health and safety requirements according to:
DIRECTIVE 2013/53/EU
DIRECTIVE 2014/30/EU
DIRECTIVE 2014/35/EU
MC_0020
Bow Installation Instructions
Bow Installation Considerations and Precautions ..................... 3
Thruster Measurements .................................................... 4 - 5
Technical Specications ............................................................ 5
Measurements, PDC ................................................................. 6
Measurements, VFD.................................................................. 6
Thruster Specications.............................................................. 7
Positioning of the tunnel / thruster............................................. 8
Tunnel Length............................................................................ 9
Tunnel installation in sailboats................................................. 10
Water Deection ...................................................................... 11
Tunnel ends............................................................................. 12
Tunnel installation............................................................ 13 - 14
Supporting the Thruster........................................................... 15
Stern tunnel installation ........................................................... 16
Thruster Installation Instructions
Thruster Installation Considerations and Precautions............. 17
Gear Leg & Motor Bracket Installation..................................... 18
Propeller Installation................................................................ 19
Coupling Installation ................................................................ 20
Motor Installation ..................................................................... 21
Oil Tank Installation ................................................................. 22
Control Panel Cable Installation ............................................. 23
S-link Planning & Precautions ................................................ 24
PDC 301 ................................................................................. 25
Startup and Commissioning ................................................... 25
Functions and Operation ......................................................... 26
Power Cable Dimensions ........................................................ 26
Wiring Diagram ............................................................... 27 - 29
Control Panel Installation ........................................................ 30
Checklist for DC and IP Thrusters ...................................... 31
Spare Parts ............................................................................ 32
Warranty statement .............................................................. 32
Contents
EN
MC_0031
Bow Installation Considerations and Precautions
EN
• The thruster must NOT be installed in compartments that require ignition proof electric equipment. If necessary, make a separate compartment.
(NB: Ignition Protected systems are tested to be installed in areas with possible explosive gases in accordance with ISO 8846)
• The electromotor will generate some carbon dust so any storage compartments must be separated from the thruster to prevent nearby items
becoming dusty/ dirty. (NB: IP version motors generate dust but are enclosed.)
• When installing the thruster electromotor in small compartments, ensure the compartment is well ventilated to allow for cooling of the electromotor.
• If the height of the room you are installing the thruster is limited, the thruster can be installed horizontally or at any angle in-between.
- If the electromotor is positioned more than 30 degrees off vertical, it must be supported separately.
- Beware of keeping installation within advised measurements. No part of the propeller or gear house must be outside the tunnel.
• Do not install the thruster in a position where you need to cut a stiff ener/ stringer/ support that may jeopardise the hull integrity without checking with
the boat builder this can be done safely.
• The electromotor, components and cables must be mounted so they remain dry at all times.
• We advise painting the gear house and propellers with antifouling. (NB: Do not paint the anodes, sealings, rubber fi ttings or propeller shafts)
• Do not nish the inside of the tunnel with a layer of gelcoat/ topcoat or similar. There is only room for a thin coat of primer and two layers of anti-fouling
between the tunnel and the props.
• Don’t install the electromotor close to easily ammable objects or equipment as it will reach over 100°C before the temperature switch is activated.
• Do not store items close to the thruster motor. Any loose items near the thruster motor cis a potential re hazard and can cause undesired short-
circuiting.
Products
SM907964 | SAC1400/610-I-4-V - AC Thruster ø610mm 400V
SM908000 | SAC750/513-I-4-H - AC Thruster ø513mm 400V
SM908001 | SAC750/513-I-4-V - AC Thruster ø513mm 400V
SM908002 | SAC900/513-I-2-H - AC Thruster ø513mm 230V
SM908003 | SAC900/513-I-4-H - AC Thruster ø513mm 400V
SM908004 | SAC900/513-I-4-V - AC Thruster ø513mm 400V
SM907960 | SAC1100/513-I-4-VX01 - AC Thruster ø513mm 400V
SM907958 | SAC1100/513-I-4L-H - AC Thruster ø513mm 400V L.H
SM907955 | SAC1100/513-C-4-V - AC Thruster ø513mm 400V
SM907959 | SAC1100/513-I-4-V - AC Thruster ø513mm 400V
SM907956 | SAC1100/513-I-2-H - AC Thruster ø513mm 230V
SM907954 | SAC1100/513-C-4-H - AC Thruster ø513mm 400V
SM907957 | SAC1100/513-I-4-H - AC Thruster ø513mm 400V
SM907961 | SAC1300/610-I-4-H - AC Thruster ø610 mm 400V
SM907962 | SAC1300/610-I-4-V - AC Thruster ø610mm 400V
SM908531 | SAC1400/610-I-4L-H - AC Thr. ->1400 kg ø610mm 400V
SM907963 | SAC1400/610-I-4-H - AC Thruster ø610mm 400V