Testing New Batteries
For a battery test, please check:
The batteries must be fully charged.
The UPS must be in Normal mode with no active alarms.
Don’t take on/off the load.
To test batteries:
1. Connect the UPS to utility power for at least 48 hours to charge the batteries.
2. Press and hold the button 10 seconds to start the battery test. The status display string shows “TEST”
Recycling the Used Battery:
Warning:
Never dispose the batteries in a fire. It may explode.
Donotopenormutilatethebatteries. Released electrolyteisharmfultotheskinsandeyes.Itmaybetoxic.Abatterycan
present a risk of electrical shock and high short circuit current.
Torecycletheusedbatteryproperly,pleasedonotdiscardtheUPS,batterypackandbatteriesintothetrashbin.Please
followyourlocallawsandregulations;youmaycontactyourlocalrecyclingwastemanagementcenterforfurtherinformation
to dispose properly of the used UPS, battery pack, and batterie