manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. stilum
  6. •
  7. Indoor Furnishing
  8. •
  9. stilum vigo 2 User manual

stilum vigo 2 User manual

© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved.
Mounting instructions for climbing equipment „vigo 2“
Item No. 51 6002 401
State: 21.10.2016 p. 1
Diagram 1: Overall view of the play equipment
© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved.
Mounting instructions for climbing equipment „vigo 2“
Item No. 51 6002 401
State: 21.10.2016 p. 2
Diagram 2: Foundation plan with dimension details „vigo 2“
1. Select the play equipment location in consideration of the required safety
area (see Diagram 3: Ø5000 mm).
2. Carry out excavation work for the foundation as shown in Diagram 2. After
excavation, compress the foundation oor.
Note: The climbing equipment is built in on the play level. Pay attention to
items marked „game level“ of play equipment!
3. Concrete foundation acc. the specied dimensions (LxWxH 800 x 800 x
500mm) build with centrally mounted, horizontal reinforcement. It shed the
supplied anchor bolts with the foundation that the upper angle frame is hori-
zontal and ush with the foundation surface.
4. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, clean the surface of the foundation and put the preassem-
bled playequipment on the foundation anchor and screw it.
5. Existing gaps between the foundation and foundation hole lled up with exca-
vated soil and compact.
Reinforcement plan: Concrete foundation with rein-
forcement
Main foundation: BSt 500S
Ever 4 stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class B25
1300
300 450
750
2975
500
maximale Fallhöhe: 2975mm
Füllmaterial
Filling
Erde/Grund
Ground
Beton
Concrete
Blatt:
Projekt:
Artikelnummer:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI + KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ
:
DATUM:
NAME:
WERKSTOFF

MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
1
0908-00-00
516002401
1173x300x3350
Fertigung:
Mattheis
Gewicht:
1585298.1
Vigo2
Zust.
Änderung
Name
Abmaße:
Zuschnitt:
Fundament
Datum
09.08.16
1300
300 450
750
2975
500
maximale Fallhöhe: 2975mm
Füllmaterial
Filling
Erde/Grund
Ground
Beton
Concrete
Blatt:
Projekt:
Artikelnummer:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI + KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ
:
DATUM:
NAME:
WERKSTOFF

MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
1
0908-00-00
516002401
1173x300x3350
Fertigung:
Mattheis
Gewicht:
1585298.1
Vigo2
Zust.
Änderung
Name
Abmaße:
Zuschnitt:
Fundament
Datum
09.08.16
© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved.
Mounting instructions for climbing equipment „vigo 2“
Item No. 51 6002 401
State: 21.10.2016 p. 3
6. Seal the foundation with the safety cover required for the height of fall indica-
ted. Set up impact-absorbing playground surfacing according to EN 1177 HIC
1000.
Free fall height: approx.3000 mm
Recommended surface material: sand, wood chip, gravel, synth. fall protec-
tion.
7. Do not allow children to use the equipment before the installation has been
nished.
Attention: If the play equipment has been incompletely installed or partly dis-
mantled when carrying out maintenance and repair work, this may lead to par-
ticular risks of injury for the user. For this reason, make clearly visible that the
equipment shall not be used in such cases.
NOTE: Play equipment, which contain components made of stainless steel
should not come with „normal“ steel parts in contact. Those steel parts may rub
off and leave small steel particles in combination with moisture brown rust stains.
If such corrosion occur on stainless steel parts, they are ne with an abrasive
(240 grit) to remove.
Please take care when transporting and setting up the fact that the components
are made of stainless steel with no „normal“ steel parts in contact.
Extent of the minimum zone =
safety area
Diagram 3: Top view
5000
Blatt:
Projekt:
Artikelnummer:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI + KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ
:
DATUM:
NAME:
WERKSTOFF

MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
1
0908-00-00
516002401
Ø5000
Fertigung:
Mattheis
Gewicht:
1585298.1
Vigo2
Zust.
Änderung
Name
Abmaße:
Zuschnitt:
Draufsicht
Datum
09.08.16
© stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modications reserved.
Mounting instructions for climbing equipment „vigo 2“
Item No. 51 6002 401
State: 21.10.2016 p. 4
In order to preserve a good visual appearance of your stilum playground equip-
ment over a long period one should take care of maintenance of the stainless
surface even despite of their corrosion resistance.
Especially areas, which can not be reached by rainfall should be frequently clea-
ned from dirt and deposits due to air pollution and dirt caused by the atmosphere.
Light soiling can easily be romoved by using a high pressure cleaner.
For persistent deposits use a clean cloth moistened with a special liquid cleaner
(e.g. on phosphoric acid) and rinse off with clear water after a short application
time. During cleaning with mild abrasive components, only wipe over stainless
steel surface in polishing direction.
For heavily soiled surfaces, polishes can be used (e.g. for cleaning chrome on
cars) or for greasy and oily dirt alcoholic cleaning agents and solvents (e.g. ethyl
alcohol, isopropyl alcohol or acetone).
However, it should be noted that the dissolved soiling is not spread over the sur-
face again.
Do not use any chlorid or hydrochloric containing cleaning products nor scouring
powder, bleaching - or silver polish cleaner. Cleaning intervals depend on type
and degree of soiling as well as on demands made on optical characteristics.
Therefore cleaning is advisable at intervals of six to twelve months – whereby in
the case of strong soiling it is appropriate to clean the playground equipment at
intervals of 3 to six months.

This manual suits for next models

1

Other stilum Indoor Furnishing manuals

stilum vigo User manual

stilum

stilum vigo User manual

stilum ludo User manual

stilum

stilum ludo User manual

Popular Indoor Furnishing manuals by other brands

Regency LWMS3015 Assembly instructions

Regency

Regency LWMS3015 Assembly instructions

Furniture of America CM7751C Assembly instructions

Furniture of America

Furniture of America CM7751C Assembly instructions

Safavieh Furniture Estella CNS5731 manual

Safavieh Furniture

Safavieh Furniture Estella CNS5731 manual

PLACES OF STYLE Ovalfuss Assembly instruction

PLACES OF STYLE

PLACES OF STYLE Ovalfuss Assembly instruction

Trasman 1138 Bo1 Assembly manual

Trasman

Trasman 1138 Bo1 Assembly manual

Costway JV10856 manual

Costway

Costway JV10856 manual

moss DESIGN Caisson Credenza Assembly instructions

moss DESIGN

moss DESIGN Caisson Credenza Assembly instructions

Aquaglide FULL DECK 15.0 owner's manual

Aquaglide

Aquaglide FULL DECK 15.0 owner's manual

AREBOS AR-HE-SW30 user manual

AREBOS

AREBOS AR-HE-SW30 user manual

Till-Hilft Fulda 87005.330 Assembly instructions

Till-Hilft

Till-Hilft Fulda 87005.330 Assembly instructions

Twoey Outside 2010 quick start guide

Twoey Outside

Twoey Outside 2010 quick start guide

Hettich Easys 200 operating instructions

Hettich

Hettich Easys 200 operating instructions

The bedboss RELAX 404 Series owner's manual

The bedboss

The bedboss RELAX 404 Series owner's manual

Oeseder Möbelindustrie Bern 991 720 Assembly instructions

Oeseder Möbelindustrie

Oeseder Möbelindustrie Bern 991 720 Assembly instructions

Costway HW68469 user manual

Costway

Costway HW68469 user manual

Next ALIX A27743 Assembly instructions

Next

Next ALIX A27743 Assembly instructions

BROSA Hans Assembly guide

BROSA

BROSA Hans Assembly guide

Prodigg MINIKA PBA015T-FUR installation manual

Prodigg

Prodigg MINIKA PBA015T-FUR installation manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.