manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Sungrow
  6. •
  7. Inverter
  8. •
  9. Sungrow SH5K-20 Guide

Sungrow SH5K-20 Guide

Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 1 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Commissioning of SH5K-20 Hybrid Inverters
Disclaimer
The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76
168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a
statement or advice on any of the Electrical or Solar Industry standards or guidelines. Please
observe all OH&S regulations when working on Sungrow equipment.
The commissioning phase of the SH5K-20 inverter is straight forward and simple. All
settings are done from the front panel, and there is no longer any need to manually
enter the battery details –the system will automatically detect a powered-up battery.
On first initialisation, the flowing will appear on the LCD screen.
Enter to set/check the country code
Enter “AU” for AS/NZS 4777 as default
Select appropriate DNSP, or manually enter
grid protection parameters (Default DNSP power factor settings will be loaded)
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 2 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Enter to save
Check / set time and date as required
Incorrect time setting will affect monitoring
Setting the Zero Export
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 3 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
‘ON’ = No power exported. “OFF” = All power
exported. “PARTIAL” = set by watts
Default = Partial 5000 watts
Set Reactive power if required. Note: Grid
settings already have State requirements loaded when DNSP selected.
Set if required
Set battery discharge times (only available if
battery connected)
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 4 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Weekday and weekend time zones available
Generally, only set if customer is on TOU
metering. Otherwise leave as default.
EPS (Off-Grid) setting only if EPS box
connected and maximum 3 kW output under EPS mode.
Enable and enter
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 5 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Enter to save
Enter to test Earth Fault alarm
Enter to save and exit
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 6 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
There are a couple of subsequent settings that may be required depending on the
configuration.
If there is an existing PV system on the same phase, it must be enabled in the settings
otherwise some errors (error 084) may occur. This also allows battery charging from
existing system.
Enter
Password = 111 (Enter)
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 7 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Enter ‘Existing System’
Enable and enter
Enter the AC power of the total inverters on
the same phase only (you can also change the export limit here)
Enter to save
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 8 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
There may also be a requirement from the customer to reserve a set amount of battery
capacityto be available in the eventof a blackout. This willquarantine a pre-set amount
and will take that amount out of the daily cycle capacity. This is only available after
inverter has restarted with battery set.
Enter into settings
Password = 111
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 9 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
EPS setting
Enable
Enter to confirm
Enter desired value, based on a calculation
of total capacity, load, and how long backup is required for.
Enter to save and finish.
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 10 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Once the commissioning is completed, please follow the below checklists to test the
system.
1. The inverter only shows green light ON and status shows Running; if the
existing solar power is sufficient, the system should charge the battery.
2. Turn more house load ON to see whether the battery discharges.
3. If the EPS box (or backup) is installed, turn off the grid supply main to test
the Off-grid function; if the function is OK and then turn the grid supply main
to ON.
4. After completing these testing, the system should run OK.
For any assistance, please contact Sungrow Service Department on 1800 786 476.

Other manuals for SH5K-20

3

Other Sungrow Inverter manuals

Sungrow SG5.0RT User manual

Sungrow

Sungrow SG5.0RT User manual

Sungrow SG15KTL-M User manual

Sungrow

Sungrow SG15KTL-M User manual

Sungrow PVS-24MH User manual

Sungrow

Sungrow PVS-24MH User manual

Sungrow SH5K User manual

Sungrow

Sungrow SH5K User manual

Sungrow SG2.0RS-S User manual

Sungrow

Sungrow SG2.0RS-S User manual

Sungrow SG50KTL-M-20 User manual

Sungrow

Sungrow SG50KTL-M-20 User manual

Sungrow SG125HV User manual

Sungrow

Sungrow SG125HV User manual

Sungrow SH5K+ User manual

Sungrow

Sungrow SH5K+ User manual

Sungrow SG2K5-S User manual

Sungrow

Sungrow SG2K5-S User manual

Sungrow SH8.0RS User manual

Sungrow

Sungrow SH8.0RS User manual

Sungrow SG1250UD User manual

Sungrow

Sungrow SG1250UD User manual

Sungrow SG30KTL-M Owner's manual

Sungrow

Sungrow SG30KTL-M Owner's manual

Sungrow SG5.0RS-ADA User manual

Sungrow

Sungrow SG5.0RS-ADA User manual

Sungrow SG33CX User manual

Sungrow

Sungrow SG33CX User manual

Sungrow SG285HX User manual

Sungrow

Sungrow SG285HX User manual

Sungrow SG36KTL-M User manual

Sungrow

Sungrow SG36KTL-M User manual

Sungrow SG1250UD User manual

Sungrow

Sungrow SG1250UD User manual

Sungrow SG5KTL-MT User manual

Sungrow

Sungrow SG5KTL-MT User manual

Sungrow SG250HX User manual

Sungrow

Sungrow SG250HX User manual

Sungrow SG30CX User manual

Sungrow

Sungrow SG30CX User manual

Sungrow SG5KTL-MT User manual

Sungrow

Sungrow SG5KTL-MT User manual

Sungrow SG4K6TL-M User manual

Sungrow

Sungrow SG4K6TL-M User manual

Sungrow SH5K Owner's manual

Sungrow

Sungrow SH5K Owner's manual

Sungrow SG3KTL-M User manual

Sungrow

Sungrow SG3KTL-M User manual

Popular Inverter manuals by other brands

EcoFlow EFD100 user manual

EcoFlow

EcoFlow EFD100 user manual

Selectronic LD200-12 operating manual

Selectronic

Selectronic LD200-12 operating manual

VITO VIIA150 instruction manual

VITO

VITO VIIA150 instruction manual

Cobra CPI 2550 quick start guide

Cobra

Cobra CPI 2550 quick start guide

INVT CHV180 series Operation manual

INVT

INVT CHV180 series Operation manual

Siemens SINAMICS G120P Technical manual

Siemens

Siemens SINAMICS G120P Technical manual

APS YC500A-MIW Installation & user manual

APS

APS YC500A-MIW Installation & user manual

Stanley SIG 2500 Original instructions

Stanley

Stanley SIG 2500 Original instructions

GSL SW150-12 operating instructions

GSL

GSL SW150-12 operating instructions

Mitsubishi Electric Climaveneta i-BX-004-013M Installation, operation and service manual

Mitsubishi Electric

Mitsubishi Electric Climaveneta i-BX-004-013M Installation, operation and service manual

Deye SUN-7K-G user manual

Deye

Deye SUN-7K-G user manual

BorMann BIW4005 owner's manual

BorMann

BorMann BIW4005 owner's manual

Goodwe XS Series user manual

Goodwe

Goodwe XS Series user manual

Mase Generators PD 50 S manual

Mase Generators

Mase Generators PD 50 S manual

Thermasol PRO SERIES Operation manual

Thermasol

Thermasol PRO SERIES Operation manual

Autarco MX Mark III Series Installation and operation manual

Autarco

Autarco MX Mark III Series Installation and operation manual

Omron V7-IP65 user manual

Omron

Omron V7-IP65 user manual

Moeller DF6-340 Series Hardware and engineering

Moeller

Moeller DF6-340 Series Hardware and engineering

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.