manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Sungrow
  6. •
  7. Inverter
  8. •
  9. Sungrow SH5K-20 Guide

Sungrow SH5K-20 Guide

Other manuals for SH5K-20

3

Other Sungrow Inverter manuals

Sungrow SG60KTL Operator's manual

Sungrow

Sungrow SG60KTL Operator's manual

Sungrow SG5KTL-MT User manual

Sungrow

Sungrow SG5KTL-MT User manual

Sungrow SG250K3 User manual

Sungrow

Sungrow SG250K3 User manual

Sungrow SG250HX User manual

Sungrow

Sungrow SG250HX User manual

Sungrow COM100A User manual

Sungrow

Sungrow COM100A User manual

Sungrow SG110CX User manual

Sungrow

Sungrow SG110CX User manual

Sungrow SH5K-20 User manual

Sungrow

Sungrow SH5K-20 User manual

Sungrow SH3K6-30 User manual

Sungrow

Sungrow SH3K6-30 User manual

Sungrow SG125HV-30 User manual

Sungrow

Sungrow SG125HV-30 User manual

Sungrow SC1000TL User manual

Sungrow

Sungrow SC1000TL User manual

Sungrow SH3K6 User manual

Sungrow

Sungrow SH3K6 User manual

Sungrow SG15KTL-M User manual

Sungrow

Sungrow SG15KTL-M User manual

Sungrow SG50KTL-M User manual

Sungrow

Sungrow SG50KTL-M User manual

Sungrow PowerStack-ST535kWh-250kW-2h User guide

Sungrow

Sungrow PowerStack-ST535kWh-250kW-2h User guide

Sungrow SH5K User manual

Sungrow

Sungrow SH5K User manual

Sungrow SG3150UD-MV-US User guide

Sungrow

Sungrow SG3150UD-MV-US User guide

Sungrow SG125HV User manual

Sungrow

Sungrow SG125HV User manual

Sungrow SG10KTL User manual

Sungrow

Sungrow SG10KTL User manual

Sungrow SG110CX User manual

Sungrow

Sungrow SG110CX User manual

Sungrow SH3.0RS User manual

Sungrow

Sungrow SH3.0RS User manual

Sungrow SG8KTL-EC User manual

Sungrow

Sungrow SG8KTL-EC User manual

Sungrow SG200HX-US User manual

Sungrow

Sungrow SG200HX-US User manual

Sungrow SG60KU-M User manual

Sungrow

Sungrow SG60KU-M User manual

Sungrow SG30CX User manual

Sungrow

Sungrow SG30CX User manual

Popular Inverter manuals by other brands

Omnik New Energy Omniksol-1.5k-TL user manual

Omnik New Energy

Omnik New Energy Omniksol-1.5k-TL user manual

Agilent Technologies 33250A user guide

Agilent Technologies

Agilent Technologies 33250A user guide

4-noks ZR-SWITCH-RC instruction manual

4-noks

4-noks ZR-SWITCH-RC instruction manual

V&T V5 Series user manual

V&T

V&T V5 Series user manual

Hon Turing HT-T-S1000-12 introduction

Hon Turing

Hon Turing HT-T-S1000-12 introduction

Metabo E 140 SP Plus Original operating instructions

Metabo

Metabo E 140 SP Plus Original operating instructions

BARRON EXITRONIX Tucson Micro Series installation instructions

BARRON

BARRON EXITRONIX Tucson Micro Series installation instructions

Baumer HUBNER TDP 0,2 Series Mounting and operating instructions

Baumer

Baumer HUBNER TDP 0,2 Series Mounting and operating instructions

electroil ITTPD11W-RS-BC Operation and Maintenance Handbook

electroil

electroil ITTPD11W-RS-BC Operation and Maintenance Handbook

Silicon Solar TPS555-1230 instruction manual

Silicon Solar

Silicon Solar TPS555-1230 instruction manual

Mission Critical Xantrex Freedom SW-RVC owner's guide

Mission Critical

Mission Critical Xantrex Freedom SW-RVC owner's guide

HP 3312A Operating and service manual

HP

HP 3312A Operating and service manual

Hoymiles HM-500T user manual

Hoymiles

Hoymiles HM-500T user manual

Nitecore SPM10 user manual

Nitecore

Nitecore SPM10 user manual

AEG Protect PV installation manual

AEG

AEG Protect PV installation manual

On Board TruePower Plus 1200MS owner's manual

On Board

On Board TruePower Plus 1200MS owner's manual

Plugreen PGM-200P-230 Installation and operation manual

Plugreen

Plugreen PGM-200P-230 Installation and operation manual

Fourgroup Easy use and Programming Handbook

Fourgroup

Fourgroup Easy use and Programming Handbook

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 1 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Commissioning of SH5K-20 Hybrid Inverters
Disclaimer
The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76
168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a
statement or advice on any of the Electrical or Solar Industry standards or guidelines. Please
observe all OH&S regulations when working on Sungrow equipment.
The commissioning phase of the SH5K-20 inverter is straight forward and simple. All
settings are done from the front panel, and there is no longer any need to manually
enter the battery details –the system will automatically detect a powered-up battery.
On first initialisation, the flowing will appear on the LCD screen.
Enter to set/check the country code
Enter “AU” for AS/NZS 4777 as default
Select appropriate DNSP, or manually enter
grid protection parameters (Default DNSP power factor settings will be loaded)
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 2 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Enter to save
Check / set time and date as required
Incorrect time setting will affect monitoring
Setting the Zero Export
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 3 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
‘ON’ = No power exported. “OFF” = All power
exported. “PARTIAL” = set by watts
Default = Partial 5000 watts
Set Reactive power if required. Note: Grid
settings already have State requirements loaded when DNSP selected.
Set if required
Set battery discharge times (only available if
battery connected)
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 4 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Weekday and weekend time zones available
Generally, only set if customer is on TOU
metering. Otherwise leave as default.
EPS (Off-Grid) setting only if EPS box
connected and maximum 3 kW output under EPS mode.
Enable and enter
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 5 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Enter to save
Enter to test Earth Fault alarm
Enter to save and exit
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 6 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
There are a couple of subsequent settings that may be required depending on the
configuration.
If there is an existing PV system on the same phase, it must be enabled in the settings
otherwise some errors (error 084) may occur. This also allows battery charging from
existing system.
Enter
Password = 111 (Enter)
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 7 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Enter ‘Existing System’
Enable and enter
Enter the AC power of the total inverters on
the same phase only (you can also change the export limit here)
Enter to save
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 8 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
There may also be a requirement from the customer to reserve a set amount of battery
capacityto be available in the eventof a blackout. This willquarantine a pre-set amount
and will take that amount out of the daily cycle capacity. This is only available after
inverter has restarted with battery set.
Enter into settings
Password = 111
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 9 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
EPS setting
Enable
Enter to confirm
Enter desired value, based on a calculation
of total capacity, load, and how long backup is required for.
Enter to save and finish.
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
servi[email protected]u | www.sungrowpower.com.au
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 10 of 10
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Once the commissioning is completed, please follow the below checklists to test the
system.
1. The inverter only shows green light ON and status shows Running; if the
existing solar power is sufficient, the system should charge the battery.
2. Turn more house load ON to see whether the battery discharges.
3. If the EPS box (or backup) is installed, turn off the grid supply main to test
the Off-grid function; if the function is OK and then turn the grid supply main
to ON.
4. After completing these testing, the system should run OK.
For any assistance, please contact Sungrow Service Department on 1800 786 476.