T-Drill F-400 User manual


INSTRUCTION MANUAL
2
Version
6402768EN
10.03.2019 / MT
Instrucons for use of the T-Drill .
Copyright © 2019 T-DRILL Oy. All rights reserved. This manual, or parts thereof, may not be reproduced in any form or by
any means, nor translated into any other language without a wrien permission of T-DRILL Oy
Is has been our aim to elaborate this instrucon book with the greatest possible care and aenon. The accuracy of the
informaon has been carefully checked during the preparaon of the manual. Should any subsequent modicaons be
made to the product, we decline liability for erroneous or incomplete informaon.
OY
Ampujane 32 / P.O BOX 20
FIN-66401 Laihia, Finland
Tel.Int. +358-6-4753 333
Telefax: +358-6-4753 300
www.t-drill.
INDUSTRIES, INC.
1740 Corporate Drive, Suite 820,
Norcross, Georgia 30093, USA
Phone: 800-5542730
Fax#: 770-925-3912
www.t-drill.com
Your local dealer is:

FLANGING MACHINE
3
F-400
Contents
6
1.1 General ........................................................................................................................... 6
1.2 Symbols for warning and danger used in this manual....................................................6
1.3 Symbols and warnings used in the machine...................................................................7
1.4 Personal protecve equipment for the operator............................................................8
8
2.1 Flanging machine safety instrucons..............................................................................9
3.1 Introducon of anging ................................................................................................10
3.2 Methods of anging......................................................................................................11
3.2.1 Cold Flanging.......................................................................................................... 11
3.4 Informaon on the equipment .....................................................................................12
3.5 Formable Materials.......................................................................................................12
3.6 Technical specicaons................................................................................................. 13
5.1 Installaon and levelling of the machine......................................................................15
5.1.1 Layout..................................................................................................................... 15
5.1.2 Space requirement.................................................................................................16
5.1.3 Leveling ..................................................................................................................17
5.2 Ambient condions.......................................................................................................18
5.3 Connecon of the machine to the sources of energy...................................................18
5.3.1 Connecon to the electric network .......................................................................18
5.4 Start-up inspecon ....................................................................................................... 19
6.1 Descripon of the control devices ................................................................................20
6.1.1 Main switch............................................................................................................20
6.1.2 Control panel.......................................................................................................... 20
6.1.3 Key-switch and brake release- push buon ..........................................................24
6.1.4 Signal lights (oponal)............................................................................................24
6.1.5 Safety Area Scanner (oponal)...............................................................................24
6.1.6 Control Elements....................................................................................................25
6.1.7 The valve arrangement board ................................................................................28
6.2 Stopping the machine...................................................................................................30
6.2.1 The normal stopping of the F-400 machine ...........................................................30
6.2.2 The emergency stopping of the F-400 machine.....................................................30
6.3 The machine seng...................................................................................................... 30
6.3.1 The idencaon of the forming pin .....................................................................30

INSTRUCTION MANUAL
4
6.3.2 Changing of the forming pin...................................................................................31
6.3.3 Adjustment of the angle of the forming pin...........................................................33
6.3.4 How to correct undesirable ange shape ..............................................................34
6.3.5 Adjustment of the forming pin radius....................................................................35
6.3.6 The fastening of the pipe .......................................................................................37
6.3.7 Seng the length of the part of the pipe to be anged ........................................41
6.4 Instrucons for the use of the display ..........................................................................42
6.4.1 Menu-screen .......................................................................................................... 42
6.4.1.1 User level selecon - screen.............................................................................43
6.4.1.2 Programming- screen.......................................................................................44
6.4.1.3 Pipe seng- screen.......................................................................................... 45
6.4.1.3.1 Library- screen............................................................................................. 45
6.4.1.4 Input/Output- screen .......................................................................................46
6.4.1.5 Alarms - screen.................................................................................................46
6.4.1.6 Main screen...................................................................................................... 47
6.5 Adjustment of forming device ......................................................................................48
6.6 Cold anging and aring of the pipe.............................................................................50
6.7 Working instrucons for bevelling ...............................................................................51
6.7.1 The installaon of the bevelling tool......................................................................51
6.7.2 The adjustment of the forming tool.......................................................................52
6.7.3 The work cycle of the bevelling operaon .............................................................53
6.8 Adjustment and operaon of anging machine based on seng value table .............54
55
57
8.1 Lubricaon....................................................................................................................58
8.2 Regular weekly Inspecon ............................................................................................62
8.2.1 Inspecons of Spindle Chain Tightness ..................................................................62
8.2.2 Fastenings of Moving Carriage Cylinders and Piston Shas ...................................62
8.2.3 Fastening of Flanging Tool ......................................................................................62
8.2.4 Seng of Limit Switch............................................................................................ 62
8.3 PLC-baery maintenance..............................................................................................63
9.1 Funconing ................................................................................................................... 64
65
10.1 Clamping Lengths (Standard clamps)..........................................................................65
10.2 F-400 Capabilies........................................................................................................66
10.2.1 Carbon Steels .......................................................................................................66
10.2.2 Austenic Stainless Steels ....................................................................................66
10.2.3 Copper Alloys (copper, copper nickel, aluminium brass) .....................................67

FLANGING MACHINE
5
F-400
10.3 Approximate Operaon Times of Flanging .................................................................68
10.3.1 Fixing of the Pipe into the Clamp ........................................................................68
10.3.2 Flanging (machine me)....................................................................................... 68
10.4 Installaon Times........................................................................................................ 69
10.5 Loose Flange Joint.......................................................................................................70
10.5.1 Lapped Joint .........................................................................................................70
10.5.2 Loose Flange.........................................................................................................70
10.5.3. Gasket ................................................................................................................. 70
72

INSTRUCTION MANUAL
6
This instrucon book contains the instrucons for use, maintenance and seng of the
T-DRILL machine, as well as recommendaons regarding dierent working procedures
and the use of the forming tools.
Before proceeding with installaon and operaon of the machine, read the safety
instrucons in chapter 2 “General safety instrucons”
¨
MANUAL
L
a
¨

FLANGING MACHINE
7
F-400
Read the instrucon manual aenvely before carrying out
installaon, operaon, seng or maintenance of the machine.
Electric box. Danger may be caused by electric installaon.
Sharp edges!
Be extremely cauous when handling this area of the machine.
Mind the rotang spindle.
Don’t look into the pipe during the process relang to the collar.
Don’t stay on the pipe line or beside the holes.
Warning! Moving parts. Be extremely cauous when handling
this area of the machine.
Do not loosen the upper clamps
ghtening screw when clamps are open.
The clamp might fall down.
Tighten the clamp ghtening screws to
40 Nm or so that the ends of the screws’
threads are level with front panel.
Danger of collision!
When changing the forming pin note to
adjust the correct anging radius. (See
ange standard tables).

INSTRUCTION MANUAL
8
Always wear the appropriate personal protecve equipment, and use extreme cauon
when operang the machine.
Use hearing protector when operang with the machine.
Use protecve glasses when operang with the machine.
Use safety gloves when operang with the machine
Use safety boots when operang with the machine
Read the instrucon book aenvely before carrying out installaon, operaon, seng
or maintenance of the machine. The T-DRILL machine is to be used only for the purposes
and in the way as specied in this manual.
Do not allow visitors or unqualied persons to enter the working area or to come near
the machine.
When operang the machine, all protecon devices should be ed in their right place
and be in proper condion.
Do not keep any loose objects or tools on the machine.
Never exceed the capacity of the machine.
Observe special cauon when using the pipe clamp.
Always disconnect the current supply before opening the electric box of the machine.
Disconnect the current supply before carrying out any maintenance or repair inside the
machine.
When pressing the emergency stop switch, all funcons of machine are immediately
stopped.
Aer installaon of the machine, before operang it, carry out the “Start-up Inspecon”,
described in chapter 5.4.
Always use personal protecon equipment when using the machine.
¨

FLANGING MACHINE
9
F-400
Before switching the anging machine on, the work supervising personnel and the
employees shall carefully acquaint themselves with the manual, the structure of the
machine and it’s funconing. Memorize the locaon of each operang switch and the
funcon the switch regulates.
Use the machine for no other purpose than for those allowed in the manual; be careful
at all mes. Ensure that there are no unauthorized persons in the vicinity of the machine.
Flanging shall take place under the supervision of the management in such a manner as
no excess of the machine funconing values may occur and the machine is generally used
according to the manual and safety regulaons.
¨

INSTRUCTION MANUAL
10
The machine is intended for widening the end of a pipe to form a ange using a rotang
forming cone. The ange thus formed is used as a sealing and joining element in so-
called loose ange joints.
1. Bolt, 2. Loose ange, 3. Flanged pipe, 4. Seal
The spindle and the ange spinning tool aached to it are made to rotate by an electric
motor. The bearing-mounted forming pin in the ange forming device turns directed by
the guide of the slide and while turning forms the ange in the pipe end. All machine
movements are hydraulic, except for the spindle rotaon and the movement of the arm
of the heang burner.
The anging operaon: 1. Spindle, 2. Flange forming tool, 3. Forming pin, 4. Pipe clamp,
5. Pipe
The pipe remains immobile during the enre work cycle and consequently also branched
and bent pipes can be anged. The work method makes it possible to ange a great
number of pipes of dierent diameters, since the forming pin and the pipe are linearly in
contact with each other. The wall thickness of the pipe determines almost completely the
necessary amount of force to be exercised on the material for anging.
Pipes anged by this method can be used in loose ange joints to replace lapped and
partly also cast pipe ends involving welding or soldering. The maximum dimensions of
the ange are the same as those of equivalent welded on lapped pipe ends. Depending

FLANGING MACHINE
11
F-400
on the condions of use, EN1092-1 standard or standard derived from this can be used
in dimensioning. The main factor, which denes the maximum diameter of the ange, is
deforming capability of material. In pracce this capability is expressed as elongaon.
This means that the proporon d4/OD should be smaller that the elongaon value
of material to be anged. However, the experimental results show that much higher
elongaon values can be achieved thanks to the muldimensional straining scheme.
In hot forming the sealing surface can be changed in quality from smooth to rough by
selecng the appropriate prole for the forming cone.
Flange O.D. ( d4 ) :42.4 < O.D. < 50 d4: EN1092-1
50 < O.D. < 406.4 d4: EN1092-1
This is denitely the most ecient method due to its simplicity. However, in most cases,
annealing is required for stress relief aer forming because, for example, with small pipe
dimensions the relave elongaon may be up to 75 %. This is considerably greater than
obtained in tension tests, and results in hard and brile structure.
Wall thicknesses: 2...5 mm for mild steel, stainless steel and copper alloys, up to 406 mm
(16”) pipes. See chapter 6.3. Cold anging and aring of the pipe.

INSTRUCTION MANUAL
12
• Heang unit is equipment used for heang the pipe to be anged or otherwise formed.
The heang unit enables the anging of thick-walled pipes. The equipment comprises an
oponal range of dierent heang nozzles, an infrared thermometer and an automac
ame guard.
• Bevelling unit to be used for bevelling the edge of the pipe end, to prepare it for
welding.
• Forming pin. Dierent forming pins are available for forming a grooved ange and for
anging stainless steel pipes. The standard forming pin delivered with the machine is for
use on normal steel pipes. For aring not necessary to use grooved forming pin
• Expansion pin to expand the end of the pipe for a sleeve extension.
• Pipe gripping clamps which can be ordered according to pipe diameter, available for
diameters from Ø42.4-Ø419mm.
• Potenometer and display.
Display for adjusng the potenometer (Diameter of the ange, the rearmost and the
front posion of the frame.)
- Various copper alloys, e.g. CZ110 BS 2871
- Austenic steels, e.g. AISI 316
- So steels, e.g. St 35 DIN 17175
- So aluminium alloys

FLANGING MACHINE
13
F-400
Type code 4014
Pipe to be anged mm (Ø33,7**) Ø42.4-Ø419
Maximum wall thickness See capacity diagrams
Materials to be formed Copper, Carbon steels, RST,
Aluminium
Other materials:
Consult T-DRILL Oy
Flanging me See Machine me (13.3)
Connected power kW 15,5 See Machine plate
Max size of fuses A 3 x 100
Working voltage 3 x 200V - 240 V 50/60 Hz
3 x 380V - 480V / 50Hz/60Hz.
See Machine plate
Spindle motor kW 11
Rotaonal speed of spindle rpm approx.41
Measurements of machine
(h x w x d)
mm 1720 x 1625 x 3100
Motor of hydraulics kW 4
Pressure of hydraulic pump
(Max.)
MPa 16
Hydraulic pump output
(adjustable)
ltr/
min
0...25 l/min
Noise level dB 74 (During anging)
Weight kg 4200
Compressed air supply* MPa 0,6
1 bar = 0,1 MPa
**) Flanging pipes Ø33,7 -- Ø42,4 is possible by using forming pin: 5401793

INSTRUCTION MANUAL
14
For transport the F-400 is packed into a wooden case and bolted to its boom or is bolted
to a wooden base and plasc covered. Weight of the machine is approximately 4500 kg.
For storage the F-400 is to be protected by grease and sucient dehumidicaon should
be provided in the storage accommodaon. Especially the electric equipment must be
kept dry.
To remove the machine from the pallet, remove all xing screws rst. The corner plates
have to be removed to reach the screws and adjustable machine feet (adjustment of the
machine feet requires special tools).
To li the machine, use adequately strong liing chains. The machine must be lied from
the liing eyes, do not use fork li to li the machine. The liing eyes can be removed
aer the machine is installed.
Before installing the machine, see layout for required space.
1. Remove the rear top mesh lids (1) of the hood to reach the liing eyes (4).
2. Open the hood to reach rear liing points.
3. Fix the liing chains as illustrated.
4. Fix a four-part hoisng chain.
Instrucons for liing and parts: 1. Top mesh lids, 2. Liing chains, 3. Adjustable machine
feet, 4. Liing eyes, 5. Corner plates, remove to detach machine from the pallet, x the
machine to the oor and adjust feet.
¨

FLANGING MACHINE
15
F-400
1. Gas valve*, 2. Oxygen valve*, 3. Electric connecon, 4. Compressed air connecon and
regulator, 5. Machine outline measures.

INSTRUCTION MANUAL
16
Leave enough space around the machine for operaon and maintenance. Also take into
account the space required for the pipe to be formed.

FLANGING MACHINE
17
F-400
The machine should be installed on a solid and level foundaon, preferably on a concrete
bed.
- Required oor load capacity 3.0 t/m²
- Floor level ± 5 mm /m²
The F-400 machine must be leveled on its foundaon before use. The leveling tolerance is
0,05mm on 1000mm. Use a spirit level.
Aer leveling, fastening the machine to the foundaon by means of anchor bolts is
recommended. Use anchor bolts M12 x 150… 200 mm.
Screw M12, Washer Ø 13, Hole in anchor foot Ø 17, Anchor bolt M12
Remove the protecve grease from the machine using a detergent, which will not
damage plasc or rubber parts.

INSTRUCTION MANUAL
18
The machine must be placed in an working area, the environmental condions of which
do not exceed the following limit values:
Temperature: +5…+40°C (41…104°F)
Relave humidity of air: 85% or less
Electromagnesm Surrounding appliances should not cause such
electromagnec perturbaons, which exceed the
general standards established for workshop machinery.
Altude: max. 2200m / 7200
a
a
a
The terminals for connecon of the external supply cable of the F-400 machine are
located in the electric box. Pay special aenon to the correct earthing of the machine.
Check that the working voltage indicated on the machine and the supply voltage
coincide. Also check that the current value of the overload circuit breakers corresponds
to the current value of the motors. The machine can be supplied for a voltage range of
200-240V/50Hz/60Hz and of 380V-480/50Hz/60Hz. Check the correct connecon with
the help of the circuit diagram delivered with the machine. This circuit diagram will be
found in the pocket of the electric box door. Compare the diagram with the nameplate of
the machine.
¨

FLANGING MACHINE
19
F-400
¨
¨
¨
1. Measure the supply voltage of the machine and check, that it corresponds
to the tension and the frequency values indicated on the nameplate of the
machine.
2. If the machine is equipped with heang equipment: Check the supplies of the
compressed air, of the oxygen and of the propane. If necessary, adjust the
values to coincide with the data indicated in the technical specicaons
4. Check the amount of the hydraulic oil and of the lubricaon oil of the machine.
5. Check the rotaon direcon of the hydraulic pump motor. Turn the main power
switch on and press the push buon of the contactor, on the control panel. The
hydraulic pump motor will start. Check the rotaon direcon, indicated by an
arrow on the end of the motor. Should the rotaon direcon be wrong, change
phases of the supply cable on the terminal board. A wrong rotaon direcon
may cause the hydraulic pump to be damaged.
6. Check that the ange forming tool turns in the direcon indicated by the arrow
(on its body), by pressing the push-buon on the control panel.
7. Check the correct funcon of the switches and push-buons of the control
panel.
¨

INSTRUCTION MANUAL
20
The main switch of the machine is located on the door of the electric box on the backside
of the machine. The power is connected by turning the main switch to the posion “I”
(ON). The power is disconnected by turning the switch to the posion “0” (OFF). The
main switch can be locked in the “0” posion by mains of a separate padlock in order to
prevent unauthorized use of the machine (padlock not included to delivery).
This manual suits for next models
1
Table of contents
Other T-Drill Industrial Equipment manuals