
Foundation
Preparation
PAVER SURFACE OR
CONCRETE SLAB
COMPACTED GRAVEL BASE
NOTE: if the re pit is being installed along with a paver installation, the aggregate base
course and setting bed of pavers can be extended to be used for the re pit installation.
4
FOR A GAS FIRE PIT, PLAN THE INSTALLATION (GAS LINE,
RISER) ACCORDINGLY WITH A PROFESSIONAL LOCALLY
LICENSED BY THE AUTHORITY HAVING JURISDICTION IN
GAS PIPING. REFER TO MANUFACTURER'S INSTALLATION
AND OPERATION INSTRUCTIONS.