1
SBOU117A–September 2011–Revised May 2016
Submit Documentation Feedback Copyright © 2011–2016, Texas Instruments Incorporated
BUF22821EVM-USB Evaluation Board and Software Tutorial
PowerPAD is a trademark of Texas Instruments.
Microsoft, Windows are registered trademarks of Microsoft Corporation.
I2C is a trademark of NXP Semiconductors.
WinZIP is a registered trademark of WinZip International LLC.
All other trademarks are the property of their respective owners.
User's Guide
SBOU117A–September 2011–Revised May 2016
BUF22821EVM-USB Evaluation Board and Software
Tutorial
This user's guide describes the characteristics, operation, and use of the BUF22821EVM-USB evaluation
board. It discusses how to set up and configure the software and hardware and reviews various aspects of
the program operation. Throughout this document, the terms evaluation board,evaluation module, and
EVM are synonymous with the BUF22821EVM-USB. This user's guide also includes information regarding
operating procedures and input/output connections, an electrical schematic, printed circuit board (PCB)
layout drawings, and a parts list for the EVM.
Contents
1 Overview ..................................................................................................................... 2
2 BUF22821EVM-USB Hardware Setup.................................................................................... 4
3 BUF22821EVM-USB Hardware............................................................................................ 6
4 BUF22821EVM-USB Features ........................................................................................... 12
5 BUF22821EVM-USB Software Setup ................................................................................... 15
6 BUF22821EVM-USB Documentation.................................................................................... 26
List of Figures
1 Hardware Included With BUF22821EVM-USB Kit ...................................................................... 3
2 BUF22821EVM-USB Hardware Setup.................................................................................... 4
3 BUF22821EVM-USB Board Block Diagram.............................................................................. 5
4 USB_DIG_Platform Block Diagram ....................................................................................... 6
5 Typical Hardware Connections for the BUF22821EVM-USB.......................................................... 7
6 Connecting External Power to the BUF22821EVM-USB............................................................... 8
7 Connecting the USB Cable to the USB_DIG_Platform................................................................. 9
8 Confirmation of USB_DIG_Platform Driver Installation................................................................. 9
9 Default Jumper Locations for BUF22821EVM-USB ................................................................... 10
10 BKSEL Switch .............................................................................................................. 13
11 BUF22821EVM-USB Software Install Window......................................................................... 15
12 BUF22821EVM-USB Software License Agreements.................................................................. 16
13 BUF22821EVM-USB Software Installation Progress.................................................................. 16
14 BUF22821EVM-USB Software About Button........................................................................... 16
15 BUF22821EVM-USB Software Interface................................................................................ 17
16 Communication Error with USB_DIG_Platform ........................................................................ 18
17 JMP5 Setting for Logic ‘0’................................................................................................. 18
18 JMP5 Setting for Logic ‘1’................................................................................................. 19
19 Measuring and Entering Power-Supply Voltage ....................................................................... 19
20 Auto Write Feature Enabled .............................................................................................. 20
21 Save File Prompt........................................................................................................... 21
22 Saved Data Format ........................................................................................................ 22