TV Bedstore ANNECY Quick start guide

Parts Identification
Page 1 of 20
1
7
8
9
10
2
3
4
11
12
13
13
15
14
16
17 18
ANNECY OTTOMAN TV BED
56
PLEASE READ esirailimafotylbmessaotroirpteehssiht
yourself with the various stages of construction. Carefully
open the pack supplied and check the contents against the
parts and fittings check list.
Do not destroy any of the packaging until you are certain
that you have all the necessary parts for the assembly.
Please ensure that the packaging is disposed of in
a safe environmentally friendly way.
CAUTION: There are small components used in the
construction of this unit. These loose items should be
, to avoidkept away from young children during assembly
the danger of choking.
19 20 21
22 23 24
200727
An instructional video of the Operation of the Ottoman Lift Up system is available via YouTube using
the following address: https://youtu.be/hyq4zm7h_yU
IMPORTANT: BEFORE STARTING TO ASSEMBLE THE BED - PLEASE READ THESE INSTRUCTIONS CAREFULLY.
3
3
4
4

110
11 23
24
1
1
13 2
114
1
Ref. Qty
Ref. Description
5
Qty
1
2
3
1
1
1
Parts Checklist
Description
4 1
Page 2 of 20
1
20
3
21
3
15
16 1
2
17
1
18
1
9
6
7
1
2
8 2
1
19
1
12 1
Headboard
Footboard
Side Rail - With Media Tray
Side Rail - Without Media Tray
Mattress Base Board
Mattress Base Board
Metal Tie Rails for Mattress Base Boards
Mattress Stoppers
Media Tray Side Panel - L
Media Tray Side Panel - R
Media Tray Back Panel
Media Tray Base Panel
22
1
Inside
accessory
box
Storage Base Boards
Hand Lifting Strap
Mains Power Lead - 3 mt
Aerial Lead - 4 mt
HDMI Leads - 2.8 Mt
USB Power Supply
Remote Control for TV Lift
Remote Control for Audio System
Cable Clips
Cable Ties
HDMI 90° adapter
Holster for remote controls
Ax16
Fittings Checklist
C
x16
Spring Washers (for M8 bolts)
Flat Washers (for M8 bolts)
B
Bolts (M8x30mm) for
fitting side rails (3&4)
d raobtoof & d
raobdaeh ot (1&2)
HARDWARE NEEDED FOR BED ASSEMBLY (PACK B)
Screws (5x50mm) for
assembling media tray panels
x16
Ax4
G
F
x11
Bolts (M8x30mm) for
fitting media tray to side rail (3)
x11
HARDWARE NEEDED FOR MEDIA TRAY ASSEMBLY (PACK C)
CFlat Washers (for M8 bolts) x4
TV INSTALLATION KIT - Inside Pack (B)
HARDWARE NEEDED FOR FITTING GAS-LIFT MECHANISMS (PACK A)
E (a)
Gas-Lift Mechanisms
x1
x1
E (b)
Spring Washers (for M8 bolts)
B
A
x8
Bolts (M8x30mm) for
fitting gas-lift mechanisms (E)
to headboard & footboard (1&2)
x8
CFlat Washers (for M8 bolts) x8
Spring Washers (for M8 bolts)
B
A
x8
Bolts (M8x30mm) for
fitting gas-lift mechanisms (E)
to headboard & footboard (1&2)
x8
CFlat Washers (for M8 bolts) x8
D
Allen Key (for M8 bolt)
x1
Ref. Qty
Ref. Description
Qty
Description
Ref. Qty
Ref. Description
Qty
Description
Ref. Qty
Ref Description
Qty
Description
a x2
b x2
Counter-Sunk Screws
(M6x12mm)
Counter-Sunk
Screws (M4x12mm)
Allen Key (4mm) Allen Key (2.5mm)
Screw-Washer sets
(M8x25mm)
Use 5mm Allen Key (D)
Plastic Barrel Nuts for assembling
media tray panels

Page 3 of 20
J
x1
Spanner (for M8 nut)
HARDWARE NEEDED FOR FITTING MATTRESS BASE BOARDS (PACK D)
x2
H
Flange Lock-Nuts
(M8) for gas-lift pistons
Ref. Qty
Ref. Description
Qty
Description
Additional Tools Required
Care & Maintenance
General Hints & Tips
Please retain your assembly instruction and
tools provided for future use.
Periodically check that all bolts are still tight
Approximate time to
assemble this product
2 1/2 Hrs
In the unlikely event of missing or damaged parts,
please contact your retailer. Please have this guide at
hand quoting the part code reference numbers shown
when requesting spare or replacement parts.
Cross-head Screwdriver
Step
1
B
A
x18
x22
C
x22
Bolts (M8x30mm) for
fitting metal tie rails (7) and
gas-lift mechanisms (E) to
mattress base boards (5&6).
18
1
Electrical & Cable Connections
x4
K
M8 Nuts for Mattress Stoppers
Spring Washers for M8 bolts &
Mattress Stoppers.
Flat Washers for M8 bolts &
Mattress Stoppers.

Page 4 of 20
1
2
Step
2a
Bed Assembly - Use Pack 'A&B'
Ax16 Bx16 Cx16
D
x1
E (a)
x1
E (b)
x1
AD
B
C
10mm
CHOOSE WHICH SIDE YOU WANT TO LIFT FROM
ALIGN WITH BLUE LABELS
CHECK THIS DIAGRAM AND IF ACCESS IS NEEDED FROM LEFT SIDE
OF BED, FIT BOTH LIFT MECHANISMS TO RIGHT SIDE OF THE BED.
BOLT INTO THE HOLES MARKED (R) WITH BLUE LABELS.
THE MECHANISMS ARE LABELED
E (a) & E (b).PLEASE CAREFULLY
FOLLOW THE DIAGRAM BELOW.
LIFT UP FROM LEFT
B
A
C
D
BOLTS SHOULD BE IN CENTRE
OF LONG HOLES
E(b)
E(a)

Page 5 of 20
1
2
Step
2b
AD
B
C
10mm
Ax16 Bx16 Cx16
D
x1
E (a)
x1
E (b)
x1
B
A
C
D
BOLTS SHOULD BE IN CENTRE
OF LONG HOLES
ALIGN WITH RED LABELS
CHECK THIS DIAGRAM AND IF ACCESS IS NEEDED FROM RIGHT SIDE
OF BED, FIT BOTH LIFT MECHANISMS TO LEFT SIDE OF THE BED.
BOLT INTO THE HOLES MARKED (L) WITH RED LABELS.
THE MECHANISMS ARE LABELED
E (a) & E (b).PLEASE CAREFULLY
FOLLOW THE DIAGRAM BELOW.
LIFT UP FROM RIGHT
Bed Assembly - Use Pack 'A&B'
E(b)
E(a)

1
2
3
3
Step
3
Page 6 of 20
Bed Assembly - Use Pack 'B'
A
x4
B
x4
C
x4
D
x1
A
B
CD
90%
Electrical & Cable Connections
Step
4
Connect Main Power Lead (15) to
your wall socket - for safety there
must be an earthed power supply.
15
1&2
3

Electrical & Cable Connections
Step
5
6
Page 7 of 20
Step
TIP:
BEFORE FITTING THE TV,
PUSH CABLES THROUGH
EACH DUCT FROM THE TOP.
CHOOSE THE BEST SIDE TO
USE DEPENDING ON WHERE
THE CONNECTION PORTS
ARE ON BACK OF YOUR TV.
NEVER CROSS CABLES FROM
ONE SIDE TO THE OTHER.
Note: For illustration purposes
only, TV connections may vary.
TV Power Lead
supplied with your TV
16
17
Press the “UP” button once to
raise TV lift to the top.
STOP
UP
DOWN
19

Page 8 of 20
a
a
Loosen Tighten
b
Step
7
a x2
b x2
Screw-Washer sets
(M8x25mm). Use
5mm Allen Key (D)
Counter-Sunk Screws
(M6x12mm)
Counter-Sunk
Screws (M4x12mm)
Allen Key (4mm) Allen Key (2.5mm)
IF SCREWS ARE SUPPLIED WITH TV, PLEASE USE THOSE IN PREFERENCE
TV Installation -
Normal Vesa Fixing

Step
8a
Step
8b
Page 9 of 20
TV Installation
- Vesa 100 x100
aa
b
100mm
100mm
REMOVE CROSS-BRACKET
AND FIX DIRECTLY TO BACK OF TV
a x2
b x2
Screw-Washer
sets (M8x25mm)
Use 5mm Allen
Key (D)
Counter-Sunk Screws
(M6x12mm)
Counter-Sunk
Screws (M4x12mm)
Allen Key (4mm) Allen Key (2.5mm)
IF SCREWS ARE SUPPLIED WITH TV, PLEASE USE THOSE IN PREFERENCE

TV Installation Kit
- Vesa 100x100
Step
8c
Page 10 of 20
Loosen Tighten
i.
ii.

90º HDMI
ADAPTER
IF REQUIRED
TV Power Lead
supplied with your TV
PLUG IN - KEEP ALL
CABLES TIGHT - USE
CLIPS & TIES PROVIDED.
Keep wires tight - peel off
cover from cable clips &
adhere to back of TV.
Note: For illustration purposes
only, TV connections may vary.
Electrical & Cable Connections
Page 11 of 20
9
Step
16
17
17
21
22
23
OPTICAL
REMOVE DUST-CAP

Electrical & Cable Connections
Page 12 of 20
10
Step
TV Power Lead
supplied with your TV
Step
11
Bed Assembly
13
13
IMPORTANT: Be careful to keep the two HDMI Leads (17) on top of the Base Boards. Main power lead (15) and
Aerial lead (16) should be kept under the base
boards & fed out under the headboard so you can connect to your wall
sockets.
16
Press the “DOWN” button once
to lower TV Lift to the bottom.
STOP
UP
DOWN
19

Step
13
Media Tray Assembly- Use Pack 'C'
Gx7
Gx2
G
Gx11
F
Fx4
12
11 9
9
10
10
Page 13 of 20
Step
12
Bed Assembly - Use Pack 'B'
A
B
CD
4
4
Gx2
F
Ax4 Bx4
Cx4
D
x1
WHEN ALL BOLTS HAVE BEEN FITTED AND THE BED
IS SQUARED UP AS IN THE DIAGRAM, TIGHTEN 100%
100%
1&2
4

Page 14 of 20
Step
14
Media Tray Assembly - Use Pack 'C'
F
Step
15
Fx7
12
AD
C
Ax4
Cx4
Dx1
Fx7

Page 15 of 20
Mattress Base Board Assembly -
Use Pack 'D'
16
B
A
C
D
C
J
K
B
6
7
7
7
5
5&6
8
8
8
14
14
Step
Ax12 B
x16C
J
x16
Dx1 x1 Kx4

.
Mattress Base Board Assembly -
Use Pack 'D'
Page 16 of 20
1
Step
17
Hx2 Jx1
J
SMALL GAP
H
OR
19 20
24
FIT THE REMOTE CONTROL HOLSTER

Page 17 of 20
Step
Ax6 B
x6 Cx6 Dx1
Mattress Base Board Assembly -
Use Pack 'D'
18
Note: Be very careful what you store
under the bed -the top of an item, like
a suitcase or a box, must not touch
the slats or they shall be damaged.
Maximum storage height is 280mm.
Overall Dimensions
DOUBLE: W143.5cm X L226cm X H128/84cm
KING: W158.5cm X L235cm X H128/84cm
SUPER KING: W188.5cm X L235cm X H128/84cm
W
L
84
128
31.5
B
A
C
D

TV Bed - Safety Information
Page 18 of 20
GENERAL INFORMATION
It is very important not to place any vessel containing liquids, e.g. drinks or vase of flowers, on top of the TV footboard
which may accidentally spill and enter the TV compartment as this could cause damage to the TV and/or the TV lifting
equipment. If this happens, please contact your retailer.
Do not expose the bed to an undue level of heat - keep away from radiators.
Never allow anyone to sit on the foot end of the bed - keep children well away from moving parts.
To keep bed clean, we recommend that it be wiped over with a slightly dampened cloth or if fabric, use a light vacuum cleaner;
always disconnect power before cleaning.
Supplied with the bed are remote controls to operate the Music system and TV Lift , When you fit your own TV there is a remote
control to operate it as well. All these remotes use batteries - there are no batteries in the rest of the equipment.
There are strict controls for disposal of batteries - your local council can advise on how to safely dispose of them.
Never burn batteries on an open fire as they could explode.
IMPORTANT POWER INFORMATION
It is essential that the Mains Power Lead (15) is connected to an earthed socket be it a wall socket or extension lead otherwise
there is risk of damage or even electric-shock.
The socket providing the power must be accessible at all times in case you need to switch off the power quickly.
During an electrical or lightening storm - disconnect the power completely as a precaution.
Always un-plug the power when going on holiday or when the bed is not used for an extended period.
If you have young children in the home always disconnect the power at the wall socket for extra safety.
Power outlets, extension leads or adapters must not be overloaded beyond their limit - this can result in fire or electric shock.
Leads supplied with this bed, or other approved mains powered extension leads used to power the equipment must not be
placed where they can be walked on - this is dangerous and could lead to accidents.
Do not interfere with or modify any cables already fitted and do not add any extra media leads unless they are routed
through the ducts as shown in Step 6. All leads must be tightly fixed to back of TV with clips (21), never hanging loose.
Never touch moving parts or any part of the equipment - if something needs to be checked, disconnect the power first.
Do not insert anything into the footboard as this could seriously damage the TV and/or the TV lifting equipment and could, if
done carelessly, cause serious damage or injury.
If the equipment doesn't operate normally or if there is any unusual noises, disconnect the power.
IMPORTANT: Care should be taken when connecting electrical items. If you are in any doubt about the
connections please consult an approved electrician. If you still have a problem please contact your retailer for advice.
TELEVISION INSTALLATION
Please follow the television installation instructions below.
Raise the TV Lift by pressing the Up button of the remote control.
19
Connect the Aerial & HDMI cable (16&17) by passing down the appropriate duct - see Step 6.
Connect the TV to the mounting bracket as in Step 7 or 8, as appropriate.
If necessary mounting bracket can easily be adjusted up or down to align with upper fixing holes on rear of TV.
Connect the TV Power Lead (supplied with TV) by passing plug down one of the ducts, plugging it into an adapter (if
supplied with TV) then into the TV power socket which is on the face of footboard - see Step 10.
This socket is only to be used for the TV as the power supply is not constant.
If required, connect your own media cables through either of the ducts - connect your media equipment when ready.
Please use the cable clips (21) & cable ties (22) to make certain there are no loose wires to snag.
The TV can now be operated following the TV Operation Guide supplied with your TV.
When finished viewing, lower the TV back into the footboard by pressing Down button of the remote control.
The TV will retract into the footboard automatically - power shall be turned off when TV reaches the bottom.
When the Up button is pressed - the TV Lifting Column rises and power to the TV turns back on automatically.
19

Troubleshooting
Page 19 of 20
RED LED
Audio Remote Control V2 (20)
①. Disconnect all mains electric power to the bed, for at least 60 seconds.
②. Press UP or DOWN Button on TV Lift Remote Control (19) and keep holding button down,
simultaneously re-connect mains electric power to bed keeping button down for at least a further
5 seconds. TV Lift unit receives signal from Remote Control and lift will begin to move UP or
DOWN whichever direction was chosen.
③. Re-connection is now completed.
If your equipment does not operate please check all the power connections from wall to the socket in the footboard.
Make sure TV is switched on. (Note: TV will only work when it is in the up position).
If you cannot resolve an issue or still have a problem or need help, please contact your Retailer for advice.
Occasionally you may find the radio wave connection between remote control and TV Lift is lost, probably due to
atmospheric conditions. In that case please follow these simple instructions:
STOP
UP
DOWN
19
TV Lift
Annecy & Lyon Audio System
Occasionally you may find the radio wave connection between Remote Control and Audio
System is lost, probably due to atmospheric conditions.
In that case please follow these simple instructions:
1. Make certain batteries are in good condition and fitted correctly.
2. Press VOL+ & VOL- at exactly the same time keeping both pressed down until the RED LED
flashes 3 times.
3. Re-pairing is now complete and the audio system and remote control is now a unique set, it
cannot be used with another audio system, in another bed.
4. Note, if two beds were purchased for same home, make sure power is only connected to the
bed being re-paired.
5. When finished with first bed and all is working satisfactorily, turn power on to the second bed.
O

NO. BUTTON BUTTON INSTRUCTIONS
1 ON/OFF button, touch to switch on, and touch again to switch off.
2 MODE button, touch to change and to cycle through each mode
3
PLAY/PAUSE 1) Playing music in Bluetooth mode, lightly press to
pause; lightly press again to resume. Long press to disconnect Bluetooth.
2) Under optical mode, lightly press to mute speaker, lightly press again to
PREVIOUS button, in Bluetooth mode lightly press to step back
a track. (NOTE: under OPT Mode button is invalid).
5 NEXT button, in Bluetooth mode lightly press to step forward to
next track. (Note: under OPT Mode, button is invalid).
6 Increase Volume
7 Decrease Volume
8 Increase Bass
9 Decrease Bass
10 MUTE button: in any play mode lightly press key to cut-off sound,
lightly press again to continue with sound.
11 Touch to enter BLUETOOTH MODE (select sound from a
Bluetooth device)
12 Touch to enter OPTICAL MODE (select sound from the TV
4
resume.
Optical output)
1. Follow the instructions in this Assembly Guide for assembling your Audio TV Bed.
2. Once power is connected to bedsystem voice shall report “power on”.
3. The default setting is Bluetooth mode. Bluetooth name is “Remo 4.9A or 4.9ASW”.
4. After a successful connection, system voice shall report “paired”.
5. Bluetooth can connect two devices at same time, last player has priority.
6. Press play/pause button for a few seconds to disconnect devices, then system voice
shall report “pairing”.
7. Optical function: Select OPT button to enter optical mode to receive sound direct from TV.
Audio Remote Control Instruction s as below.
USB Charger Guide
Page 20 of 20
DUAL USB CHARGING SOCKETS
PLUG A STANDARD USB INTO EITHER
SOCKET TO CHARGE ANY DEVICE
5V 1A (each USB).
NOTE THIS SOCKET IS FOR CHARGING
ONLY, CANNOT PLAY MUSIC OR
VIDEOS THROUGH THE SYSTEM.
USB EACH SIDE OF HEADBOARD
Audio System Features and Instructions
Table of contents
Other TV Bedstore Indoor Furnishing manuals
Popular Indoor Furnishing manuals by other brands

Walker Edison
Walker Edison BU36LENBC Assembly instructions

TUHOME Furniture
TUHOME Furniture BOLTON 120 CWZ5950 Assembly instructions

Next
Next SOPHIE 833978 Assembly instructions

Coaster
Coaster 215961KE Assembly instructions

moemax
moemax MOUSE II Assembly instructions

GSC
GSC KidCo ConfigureGate G80d user guide

RiverRidge
RiverRidge Ashland 06-088 Assembly instructions

Enwork
Enwork Affinity Desk Shell installation instructions

Mocka
Mocka Porto Assembly instructions

Gautier Office
Gautier Office 112-TWIN 280 quick start guide

Tennsco
Tennsco 7218 Assembly Instructions/Parts Manual

BIG FURNITURE WAREHOUSE
BIG FURNITURE WAREHOUSE CRG954 quick start guide