
2. Drill the Mounting Holes
Drill 4 equally spaced holes on a 10.5” (267mm) bolt circle into the mounting wall using a 3/4”
(19mm) drill bit. The bolt circle must be concentric and on center with the operating nut of the
non-rising stem gate valve.
3. Mount the Wall Post Indicator
Bolt the fl ange of the Body (18) of the Wall Pot Indicator to the wall using 4 bolts provided by the
customer.
4. Remove the Cover
With the Body (18) fl ange of the Wall Post Indicator securely bolted to the mounting wall, remove
the Cover (8) by removing the two Bolts (5) and Nuts (6). Slide the Cover (8) off of the Wall Post
Indicator body (18).
5. Insert and measure the Stem Rod
With the Cover (8) still separated from the Body (18), slide the Stem (19) , Cotter Pin (21) and
Crane Coupling (20) assembly through the Wall Post Indicator Body (18) and through the wall
such that the Crane Coupling (20) fully engages with the operating nut of the non-rising stem gate
valve. With the Crane Coupling (20) fully engaged on the operating nut of the non-rising stem
gate valve, put a mark on the Stem (19) that is between 1.25” (32mm) below the top surface of the
Body (18) but not more than 2” (50mm) above the top surface of the Body (18).
6. Cut the Stem Rod
Cut the stem rod at the mark made in Step 5.
7. Adjust the Target Plates
Adjust the “Open” Target Plates (15) such that they are squarely centered in the Windows (11)
when the non-rising valve is in the fully open position, Repeat this procedure with the “Shut” Tar-
get Plates (15) when the non-rising stem gate valve is fully closed. Adjustment is made by loosen-
ing Hex Bolt (16) and Nut (17).
8. Re-assemble the Wall Post Indicator
Insert the cover (8) back onto the Body (18) such that the ears on either side on the Target Nut
(10) fi t into the grooves on the side edges of the Body (18). Tighten the two Nuts and Bolts (5) (6).
Verify that the “Open” and “Shut” Target (15) is in the proper position by fully opening and closing
the non-rising stem gate valve using the Handwheel (4). Adjust as necessary.
MAINTENANCE
Lubrication
Oil the bearing in the Body (18) at least once a year by adding several drops of oil in the hole lo-
cated on the top of the Operating Nut (9).