Universal UTC-3306 User manual

Installation Manual
Barrier Operator UTC-3306

This barrier operator is not for pedestrians!
Automatic gate openers are designed for vehicular traffic. They are powerful and can cause
serious bodily injury or death. Accordingly direct all pedestrian traffic to a separate walk-
through gate.
Cut off the power supply before starting installation, operation or maintenance.
The barrier operator must be secured to the ground.
As for the electric cable type and section, we suggest to use the cable type of with a minimum section
of 2.0mm2
Do not change the original inside wiring.
If there is power failure, please switch off the power supply first, then open the door and rotate the
handle on the motor to manually open the boom completely.
Keep the automatic control (push-button, remote control, etc.) out of the reach of children. The control
system must be installed a minimum height of 1.5m from the ground surface.
Use transmitters or button only where you can see the gate clearly.
Never open the door or the cover of the cabinet when the machine is running.
Do not permit children to play on or around the gate.
Technical Specifications
DC Series - UTC-3306
Power Supply: 120V 60Hz
Motor’s Power: 80W / 24V DC
Motor’s Rotaon: 1400r/min
Time for up/down:
2 seconds (for 1-3M)
6 seconds (for 4-6M)
Max boom’s length: 20 feet

1
Installation and Adjustments
1) Installing the barrier on the ground:
2) Installing the boom (Fig. 2)
3) Adjust the limit position. The barrier is supplied with the magnet limit switch and the mechanical limit
switch for optimum boom movement. Do not chance the limit position.

2
Boom Length
1) Adjust the vertical and horizontal line of the boom. If the boom needs to be shorter.
The boom may slope upwards aer becoming shorter.
The strength of the spring may have to be decreased,
refer to appendix.
Manually put up the boom perpendicularly. 1) Loosen the adjusng nuts.
2) Adjust the tuning screw and check the boom. If the
boom is perpendicular to the ground when it is open,

3
Boom Length (Continued)
2) If the boom needs to be longer.
The boom may slope downward aer becoming
longer.
The strength of the spring may have to be in-
creased, refer to appendix.
Manually put up the boom perpendicularly. 1) Loosen the adjusng nuts.
2) Adjust the tuning screw and check the boom. If the
boom is perpendicular to the ground when it is open,
Adjust the balance of the spring with boom.
The springs have been already adjusted to balance
with the 16’ boom. If the length of boom needs to
be chanced, the springs should be re-adjusted.

4
Electrical Safety Devices
1) The barrier’s limit switches, motor, and control unit are already connected.
2) One the photo cells, loop detector, and the supply voltage have not been connected.
UTC-3306
3-4m 15x440mm
4.5m 16x440mm
5m 25x440mm
6m 35x440mm
Spring Ratio Per Boom Length

Control Box (DC Motor) Technical Data
Power Supply AC 120V 60Hz
Max. Consumpon 120W
Accessories Power Supply 24V DC 10W Max
Environment Temperature -20C ~ +5-C
Frequency of Remote Control 433.92 MHz
Auto-close Delay Time 1 –120 seconds
5
Wiring Diagram (DC Motor)
1. F1: 8A Fuse
2. VR1: Potentiometer
of pause time
3. VR2: Potentiometer
for opening force
4. VR3: Potentiometer
for closing force
5. DIP switch
6. Light power switch
7. Receiver module plug
8. Terminal for antenna
9. Push button
(2) 12VDC Baeries Wired in Series

Dip Switch Setup
6
Dip1:
ON: Enable auto close. The pausing time is adjustable when rotating the VR2
OFF: Disable auto-close
Dip2:
ON: The light flashes off when the boom stops.
OFF: The light flashes on when the boom stops.
LED Definitions
NO DefinitionsName
1 Opening limit switch LED. Light up when the boom has completely openedDS2
2 Closing limit switch LED. Light up when the boom has completely closedDS3
3 Air wave switch LED. Light up when the car is in range of the loopDS4
4 Loop detector LED. Light up when the car is in range of the loopDS5
5 Power LED. Lights. Lights up when the power is on.DS1
Transmitter’s Code Setting:
Press “Learn button” until the Learn LED light turns on, then press button of your choice on the transmitter
until the Learn LED light flashes and goes out. The transmitter is now coded. Other transmitters can be cod-
ed in this manner.
Erase Transmitter’s Code:
Press the “Lean Button” and hold to make the “Lean LED” light go off. Now all the codes on the transmitter
have been cleared.

Safety Device Wiring (Sold Separately)
7
Photocell (N.C.)
If the infrared ray is shut off when the gate is closing,
the gate opens instantly.
If the infrared ray is shut off when the gate is open-
ing, the gate remains open.
Loop Detector (N.C.)
If a car is in range of loop while gate is closing, the
gate will open.
If a car is in the range of loop when the gate is open,
the gate remains open.
NOTE: If auto-closing function is valid, when an obstacle passes through the sensor
range, the gate will close automatically after a set delayed time. The delay time can
be adjusted from 1-120 seconds.

8
Wiring (Continued)
Loop Detector (N.O.)
Dip1 should be Off
If a car is in range of the sensor, the gate remains
open.
When a car passes through the range of the sensor,
the gate closes.
External Terminal
When a IC card reader is used, it must be connected with OPN and GND
Table of contents
Popular Automatic Barrier manuals by other brands

ZKTeco
ZKTeco SBTL2000 instructions

BFT
BFT Maxima Ultra 68 Instructions for installation

Politec
Politec MANA IR SMA installation manual

Roger Technology
Roger Technology BIONIK4 Brushless Instruction and warnings for the installer

UNAC
UNAC ART90 BAR PS Installation and user manual

Elvox
Elvox ZBR1 Series instruction manual