USP DuraMax Series User manual

OWNER’S MANUAL /
Instructions for Assembly
Call us for any missing or damaged parts.
Do not return to the store.
Storage Shed
Storage Shed Patent #416.091
Size 4’ x 6’
Customer
Service Hotline
(800) 483-4674
www.uspolymersinc.com
Ver. 1.1
• All Weather Durable PVC
• High Head Room For Garden Implements
• Won’t Dent, Rust, Rot or Mildew
• Never Needs Painting
• Wide Single Door
• Easy Assembly
• Pad Lock Ready (Lock not included)
• Wooden or Cement Foundation Needed
Requires two people and takes about
2-3 hours for Installation.
Available Kits
• Foundation Kit Available
• Window Kits Available
Your Total Solution To Maintenance Free Storage Sheds.

Note: Check all parts prior to installation.
CODE DESCRIPTION QTY
B1C FRONT ‘U’ CHANNEL 1
B21 SIDE ‘U’ CHANNEL 1
B2B SIDE ‘U’ CHANNEL 1
B3C BACK ‘U’ CHANNEL 1
B4D SIDE ‘U’ CHANNEL 1
CMB MIDDLE COLUMN SHORT 2
CMC MIDDLE COLUMN LONG 1
CCB CORNER COLUMN SHORT 2
CCC CORNER COLUMN LONG 1
CDLC DOOR COLUMN LEFT SHORT 1
CDRC DOOR COLUMN RIGHT LONG 1
CB1C FRONT CENTER BAND 1
CB2C BACK CENTER BAND 1
CB2B LEFT SIDE CENTER BAND 1
CB4C FRONT BOTTOM CROSS CENTER BAND 1
CB5D RIGHT SIDE CENTER BAND 1
CB6C FRONT TOP CROSS CENTER BAND 1
RS1C RS1 ROOF STRUCTURE 2
RS2FC RS2 FRONT ROOF STRUCTURE 1
RS2BC RS2 BACK ROOF STRUCTURE 1
RS3LC RS3 ROOF STRUCTURE LONG 1
RS4C RS4 ROOF STRUCTURE 1
RS5C RS5 ROOF SRTUCTURE 2
RS8C RS8 ROOF STRUCTURE SUPP. LONG 2
RS9C RS9 ROOF STRUCTURE SUPP. SHORT 2
RS14C SAGGING SUPPORT 4
DSHC DOOR STOPPER HORIZONTAL 1
FSP HALF SIDE PANEL 2
SP SIDE PANEL SHORT 3
SPC SIDE PANEL LONG 2
FPLC FACIA PANEL LEFT 1
FPRC FACIA PANEL RIGHT 1
RP ROOF PANEL 2
RRSC RIDGE COVER 2
DR DOOR 1
Parts List
Cordless Drill - Philips Head
Hammer or Rubber mallet
Carpenters Square
8’ Step Ladder
Adjustable pliers
Level - 3ft.
Tape Measure
Caulk Gun
Waterproof Clear Silicon
Sealant
Hand Gloves
Tools You Will Need
MIDDLE COLUMNS (CMB)
(CMC)
U-Channels (B1C)(B3C)
(B21) (B2B) (B4D)
ROOF STRUCTURE (RS5C)
ROOF STRUCTURES (RS -
1C, 3LC, 8C, 9C)
(CB- 1C, 2C, 3LC, 4C, 6C)
PVC 90 DEGREE JOINT
(RJ)
ROOF PLUG (PPG)
ROOF PIN (PIN) ROOF PLUG WASHER
(PWS)
END PLUG SQUARE (EPS)
ROOF SUPPORT (RS2FC)
(RS2BC) ROOF SUPPORT (RS4C)
CENTER BAND FITTING
(FCB)
MIDDLE COLUMN FITTING
(FMC)
DOOR COLUMN FITTING
(FDCLC)
‘L’ BRACKET (FRLC)
CORNER COLUMN FITTING
(FCC)
ACCESSORIES
CODE DESCRIPTION QTY
FDCLC DOOR COLUMN FITTING LEFT 1
FCC CORNER COLUMN FITTING 2
FMC MIDDLE COLUMN FITTING 2
FCB CENTER BAND FITTING 3
FMRC ROOF STRUCTURE FITTING 3
FRLC ‘L’ BRACKET 2
FRTC ‘T’ BRACKET 1
FCB5C CB5 FITTING 1
RJ 90 DEGREE JOINT 2
PPG ROOF PLUG 41
PWS ROOF PLUG WASHER 41
PIN ROOF PIN 41
EPS END PLUG SQUARE 4
S1 DIA. 4.2 x 16mm. (5/32” x 5/8”)
SHEET METAL SCREW 120
S2 DIA. 4.2 x 32mm. (5/32” x 1 1/4”)
SHEET METAL SCREW 5
S3 M4 x 10mm. (M5/32” x 3/8”)
MACHINE SCREW WITH NUT 1
DOOR COLUMN LEFT
(CDLC)
CORNER COLUMNS (CCB)
DOOR STOPPER (DSHC)
CB5 FITTING (FCB5C)
DOOR COLUMN RIGHT
(CDRC)
CORNER COLUMN (CCC)
‘T’ BRACKET (FRTC)
ROOF STRUCTURE FITTING
(FMRC)
SAGGING SUPPORT (RS14C)

RS9C RS8C
DR
RRSC
RRSC
RS3LC RS2FC
RS5C
DSHC
RS1C
FPLC
CCC
CCB
CDLC
CDRC
CMC
CMB
CMB
FSP
FSP
SPC
SPC
CB1C
CB4C
B1C
CB6C
CB2B
CB2C
CB5D
B3C
B4D
RS4C
B2B
RS1C
CCB
FPRC
RS2BC

Duramax Storage Shed
Limited Fifteen Year Warranty
U.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and or
workmanship for a period of fifteen years from the date of purchase.
This warranty is extended only to the original purchaser. A purchase receipt or other proof of date of original
purchase will be required before warranty service is rendered. In no event shall we pay the cost of flooring,
labor, installation or any other costs related thereto.
This warranty only covers failures due to defects in material or workmanship which occurs during normal
use and does not extend to color change arising due to normal weathering or to damage resulting from
misuse or neglect, commercial use, failure to follow assembly instructions and the owner’s manual (including
proper anchoring of the shed), painting, forces of nature and other causes which is beyond our control.
Claims under this warranty must be made within the warranty period by calling 1-800-483-4674 or mail in
a dated sales slip and clear photograph of the part to:
U.S. Polymers, Inc.
6915 Slauson Avenue
Commerce, CA 90040
We reserve the right to discontinue or change components. If a component has been discontinued or is
not available,
U.S. Polymers, Inc. reserves the right to substitute a component of equal quality as may be compatible.
Limits and Exclusions
There are no express warranties except as listed above. The warrantor shall not be liable for incidental or
consequential damages resulting from the use of this product, or arising out of any breach of this warranty.
All express warranties are limited to the warranty period set forth above. Some states do not allow the
exclusion or limitation on how long an implied warranty lasts, so the above limitations may not apply to
you.
This warranty gives you specific legal rights and you may also have other rights which vary from state to
state or country to country.

A. Foundation & Base Frame
1. Use pressure treated 2” x 4” (5cm x 10cm) to build a
foundation structure that has an outside dimension of
48” x 65” (1219.2mm x 1651mm).
3. Start with U-Channel bases (B3C) to insure a quick
and accurate layout.
Position all U channel bases on wood foundation. It
is critical that you allow 30 1/4” (767mm) between
front bases (B1C) and (B4D) for door placement.
Measure in all directions as shown in fig.1. Make sure
the U-channel assembly is a perfect square.
DuraMax must be installed on a level wooden platform
or a level concrete foundation.
Left Side Right Side
Door Opening
30 1/4” (767mm)
B1C
The following are a list of lumber and sizes you will need.
2. Using exterior grade CDX 3/4” (19mm) plywood, cut
and fit together the sheets to form solid plywood floor
as shown. Foundation must be square and level.
Wooden Platform (Not Included)
Pressure Treated-Wood Studs: Exterior Grade (CDX):
3ea 2”x 4”x 58” (50 x 88.9x 1473.2mm) 3/4 plywood
2ea 2”x 4”x 48” (50 x 88.9 x 1219.2mm) 1ea 3/4”x 48”x 65”
(19 x 1219.2 x 1651mm)
L-Brackets: 4ea
Note: It is important that these instructions
are followed step by step.
(1) Front U channel (B1C)
(1) Side U channel (B21)
(1) Side U channel (B2B)
(1) Back U channel (B3C)
(1) Side U channel (B4D)
(16) Dia. 4.2 x 16mm Screws (S1)
Parts needed:
1
Wooden platform is extra and is not included.
Don’t install under windy conditions.
Note
Lay 2” x 4” Flat (5 x 10cm)
Note
48” (1219.2mm)
65”
(1651mm)
18 3/4”
(476.2mm)
L- BRACKET
L- BRACKET L- BRACKET
L- BRACKET
B3C
B2B B21
B4D
48” (1219.2mm)
61 1/8” (1553mm
)
45 5/8” (1158mm)
45 5/8” (1158mm)
Fig.1
61 1/8” (1553mm
)
18 3/4”
(476.2mm)
65”
(1651mm)
Foundation Structure
Plywood Floor
U-Channel Layout

Parts Needed:
1.Slide door column (CDLC) into the U-Channel
Base (B1C). Line up the pre-drilled holes on (CDLC)
Column with pre-drilled holes on U-Channel Base.
Secure with two (S1) screws from inside.
(See blowup detail)
Layout all required parts near shed foundation.
4. Using a carpenters square, line up all corners.
Secure base to wood foundation using (S1) screws.
4a. (Concrete foundation) Using a carpenters square,
line up corners.Align U-Channel base, mark the
concrete at the holes in the base and drill concrete
with 1/4” (dia. 6mm) concrete bit to accept anchor
bolts to a 1 3/4” (44mm) depth. Replace base and
secure with 1/4” x 1 3/8” (M6 x 35mm) anchor bolts
(not provided).
Concrete foundation
B. Walls & Columns
S1
fig.1
CDLC
B1C
Inside
B1C
CDLC
2
B3C
B4D
(2) Corner Column Short (CCB)
(1) Corner Column Long (CCC)
(1) Door Column Left Short (CDLC)
(1) Door Column Right Long (CDRC)
(2) Middle Column Short (CMB)
(1) Middle Column Long (CMC)
(2) Half Side Panel (FSP )
(3) Side Panels Short (SP )
(2) Side Panel Long (SPC )
All panels are clearly marked and care
should be taken to use the correct one.
Note
TIP
Left
(1) Front Center Band (CB1C)
(1) Back Center Band (CB2C)
(1) Left Side Center Band (CB2B)
(1) Front Bottom Cross Center Band (CB4C)
(1) Right Side Center Band (CB5D)
(1) Front Top Cross Center Band (CB6C)
(3) Center Band Fitting (FCB)
(1) CB5 Fitting (FCB5C)

Always place panels into frame at an angle
on top and slide in sideways and
downward for easy insertion.
2. Insert the front side panel (FSP ) into the groove
of column (CDLC).Start at the bottom of the panel
at an angle then push into place.
0utside
S1
3.Slide corner column (CCB) into side panel
(FSP ) pushing the column to the side panel.
4.Working outside use (S1) screws to secure
column to bases (B1C) and (B2B).
Inside
FSP
CDR
Note
Make sure panels are right side up
with panel shingles facing down.
Check the stamped label on top.
of all panels.
Note
B1C
CDLC
CDLC
CCB
CCB
CCB
B1C
B2B
FSP
Inside
FSP
FSPFSP
FSP
3

5.To stabilize the front panel attach the front center
band (CB1C).
Start with the center band fitting (FCB), fix to corner
column (CCB) with (S2) screws.To continue See figures
(fig.1) (fig.2) and (fig.3).
4
Inside
CCB
CDLC
B1C
CB4C
6.Attach center band (CB4C) to door
column (CDLC) and base channel (B1C).
Fig.2: Use (S1) screw.
Fix (CB4C) to base (B1C)
CB4C
B1C
Fig.1: Use (S1) screw.
Fix (CB4C) to (CDLC)
CDLC
CB4C
CB1C
Fig.3: Use(S1) screw.
Fix (CB1C) to (CDLC).
Fig.2: Use (S1) screw.
Fix (CB1C) to (FCB).
FCB
Fig.1: Use (S2) screw.
Fix (FCB)to (CCB).
Leave it loose.
CCB
Inside
CB1C
CDLC
CCB
CB1C
31&2
1&3
2
FSP
CB1C
EPS
EPS
CB4C
Fig.3: Fix the (EPS) at the end
of (CB1C) & (CB4C).
CB1C
CB4C
CB1C
CDLC
CB1C
FCB
CCB

5
CCB
CCB
B2B
B3C
9.Working outside Use (S1) screws to secure
column to bases (B2B) and (B3C).
8.Slide corner column (CCB) into side panel (SP )
pushing the column to the side panel.
B2B
CCB
0utside
S1
B3C
7. Working from inside Continue connecting the two
side panels (SP ) and columns (CMB) in sequence
along (B2B) base. Use (S1) screws to fix columns to
base.
Inside
Inside
B2B
CMB
CMB
S1

6
CCB
CB2B
Inside
CB2B
B2B
23
CMB
1&5
CCB
1 & 4
Fig.3: Use (S1)
screws.Fix (CB2B)
to (CMB) columns.
10. Stabilize the side panels with center bands (CB2B). Fix (FCB) fitting to corner column (CCB). See Fig.1
Follow the Fig. 2, 3 & 4.
Fig.4: Use (S1) Screws.
Fix (CB2B) to (FCB) fitting.
CB1C
CCB
CB2B
FCB
Fig.2: Use (S1)
screws. Fix (CB2B) to
(FCB) and (CB1C)
Fig.1: Use (S2)
screws.Fix (FCB)
fitting to (CCB).
Leave it loose.
CCB
FCB
CMB
CB2B
FCB
CB2B

11. Working from inside continue connecting the side
panels (FSP ) and (SP ) with columns (CMB) in
sequence along (B3C) base. Use (S1) screws
to fix columns to base.
12. Slide corner column (CCC) into the side
panel (SP ) pushing the column into position.
13. Working from outside use (S1) screws to secure
the corner column (CCC) to bases (B3C) and (B21).
7
B3C
CCC
B21
S1
SP
Inside
SP
FSP
CMB
B3C
CCB
CMB
S1
SP CCC
CCC SP
Inside
B21
B3C B21

14. Stabilize the side panels with center band (CB2C).
Fix (FCB) to column (CCC).
See (fig.1) (fig.2) (fig.3) and (fig.4) for details.
8
Fig.2: Use (S1)
screws. Fix (CB2C)
to (FCB) and (CB2B).
CCB
CB2C
CB2B
FCB
Fig.1: Use (S2)
screw. Fix (FCB)
to (CCC). Leave
it loose.
CCC
FCB
Fig.4: Use
(S1) screw.
Fix (CB2C) to
(FCB).
CCC
CB2C
FCB
Fig.3: Use (S1)
screws. Fix (CB2C)
to (CMB) column.
CMB
CB2C
Back Wall
CMB
CCB
CB2C
CCC
1&4
3
2
B3C

18. Fix door column (CDRC) to last panel
and base.
19. Working from inside use (S1) screws to secure
the door column (CDRC) to base (B4D).
17. Continue connecting the panels and columns in
sequence along base (B21) and (B4D). Fix columns to
base with (S1) screws.
CDRC
CMC
9
B4D
S1
SPC
SPC
CDRC
CDRC
B4D
CDRC
Inside
Inside
Inside
CMC
SPCSPC
CCC
B21 B4D
CMC
S1

10
Fig.2: Use (S1)
screws.Fix (CB5D)
to (CMC) columns.
20.Stabilize the side panels with center bands (CB5D).
Follow the Fig. 1, 2, 3 & 4.
Fig.3: Use (S1) screw.
Fix (FCB5C) to (CDRC). Fig.4: Fix the (EPS) at
the end of (CB5D).
CDRC
CB5D
FCB5C
CDRC
CB5D
FCB5C
EPS
CB5
D
FCB5C
CMC
CB5D
CB2C
CCC
CB5D
FCB
Fig.1: Use (S1)
screws. Fix (CB2C) to
(FCB) and (CB5D)
Note After completing the center band assembly fully tighten
the three center band fittings (FCB) to the corner column
(CCB) & (CCC).
CMC
B21
CB5D
3
Inside
12
CMC
CB2C
B4D

11
C. Roof Frame
Parts Needed:
(2) RS1 Roof Structure (RS1C)
(1) RS2 Front Roof Structure (RS2FC)
(1) RS2 Back Roof Structure (RS2BC)
(1) RS3 Roof Structure Long (RS3LC)
(1) RS4 Roof Structure (RS4C)
(2) RS5 Roof Structure (RS5C)
(2) RS8 Roof Structure Support Long (RS8C)
(2) RS9 Roof Structure Support Short (RS9C)
(1) Door Stopper Horizantal (DSHC)
(1) Door Column Fitting Left (FDCLC)
(2) Corner Column Fitting (FCC)
(2) Middle Column Fitting (FMC)
(2) 90 Degree Joint (RJ)
(2) ‘L’ Bracket (FRLC)
(3) Roof Structure Fitting (FMRC)
(1) ‘T’ Bracket (FRTC)
1. Insert the middle column fitting (FMC) into top of
middle columns (CMB) square tubing inserts. Fix the
columnfittings(FMC) to columns (CMB) with (S1) screws.
S1
FMC
FMC
CMB
Inside Inside
2.Insert the corner colum fittings (FCC) into the corner
column’s (CCB) insert square tubing. Fix (FCC)to (CCB)
with (S1) screws.
CCB
CCB
S1
FCC FCC
Outside Outside
FMC
FMC
FCC
FCC

12
3. Insert the door column fitting (FDCLC) into the
door column (CDLC) square tubing inserts.
FDCLC
CDLC
FDCLC
CDLC
4. Fix the roof structure fitting (FMRC) to middle
column (CMC) with (S1) screws through the middle
hole. See (Fig.1).
CMC
FMRC
Fig.1
FMRC Fig.2
CCC
5. Fix the roof structure fitting (FMRC) to corner
column (CCC) with (S1) screws through the left
hole. See (Fig.2).
6. Fix the roof structure fitting (FMRC) to door
column (CDRC) with (S1) screws through the
right hole. See (Fig.3).
FMRC
Fig.3
CDRC
Note Do not fix any screws in this position
Inside
Inside
CCC
CMC
FMRC
3
1
CDRC
2
FMRC

ROOF STRUCTURE EXPLODED VIEW
13
RS9C
RS5C
DSHC
RS1C
RS2FC
RS4C
RS3LC
RS8C
FRLC
FRLC
RS8C
RS9C
RS2BC

14
Front roof structure assembly
7. Assemble the roof support (RS8C) & (RS9C) to (RS1C) with 2 (S1) screws. Fix (FRLC) to (RS1C) with 2
(S1) screws.
Back roof structure assembly
FRLC
RS2FC
RS1C
RS8C
RS9C
8. Assemble roof structure (RS2FC) to (RS8C) & (RS9C) with (S1) screws.
U-Channel Opening
U-Channel Opening
RS8C
RS9C
RS1C
FRLC Step 2 Step 3Step 1
These holes up
9. Assemble the roof support (RS8C) & (RS9C) to (RS1C) with 4 (S1) screws. Fix (FRLC) to (RS1C) with 2
(S1) screws.
U-Channel Opening
U-Channel Opening
RS8C
RS9C
RS1C
FRLC Step 2 Step 3Step 1
These holes up
10. Assemble roof structure (RS2BC) to (RS8C) & (RS9C) with (S1) screws.
RS2BC
RS9C
RS8C
RS1C
FRLC

15
RJ
12. Insert the roof supports (RS3LC) into the U-channel
of roof structures (RS1C). See (Fig.1).
Follow (fig.2) & (fig.3)
Note Do not fix any screws in this position
fig.1
RJ
RS1C
RS3LC
RS2FC
RJ
RS3LC
RS2BC
RJ
fig.3
Fix 90 degree joint (RJ) to
(RS1C) with (S1) screw.
RS1C
Front Side Back Side
RS1C
fig.2
Note Notice the U-channel up position
on roof structures (RS1C).
11. Insert 90 degree joint (RJ) into the (RS3LC) U-
channel Roof support. Use a hammer to push in. Use
(S1) screws to fix. Repeat on other end .
fig.2fig.1
RS3LC
RS2FC
RS2BC
RS3LC
Note Make sure (RS3LC) roof structure
U-Channel is positioned down.
RS3LC
1&21&2

16
RS5C
Front Inside
RS5C
RS2FC
fig.1
RS8C
1
2
RS9C RS9C
RS5C RS5C
fig.3fig.4
Inside
Front Inside
Back
3
4
13. Place the roof structure (RS5C) into position on
roof supports (RS8C).
Use (S1) screws to fix (RS5C) to (RS8C) & (RS2FC),
(RS2BC). See Fig.1 & 2.
14. Place the roof structure (RS5C) into position on roof supports (RS9C).
Use (S1) screws to fix (RS5C) to (RS9C) & (RS2FC), (RS2BC). See (Fig.3 & 4).
RS9C RS8C
RS8C
RS9C
RS2FC RS2BC
RS5C
Back Inside
RS5C
RS2BC
fig.2
RS8C
Other manuals for DuraMax Series
1
Table of contents
Popular Other manuals by other brands

Epson
Epson 1705C - PowerLite XGA LCD Projector user guide

Globisens
Globisens Labdisc Gensci quick start guide

Buyers Products Company
Buyers Products Company LT22 installation instructions

Domo
Domo DO342DH Instruction booklet

Hamilton/Buhl
Hamilton/Buhl Spectra VIP manual

Thetford
Thetford C-200 CW D3 installation instructions