Parts Needed:
1.Slide door column (CDLC) into the U-Channel
Base (B1C). Line up the pre-drilled holes on (CDLC)
Column with pre-drilled holes on U-Channel Base.
Secure with two (S1) screws from inside.
(See blowup detail)
Layout all required parts near shed foundation.
4. Using a carpenters square, line up all corners.
Secure base to wood foundation using (S1) screws.
4a. (Concrete foundation) Using a carpenters square,
line up corners.Align U-Channel base, mark the
concrete at the holes in the base and drill concrete
with 1/4” (dia. 6mm) concrete bit to accept anchor
bolts to a 1 3/4” (44mm) depth. Replace base and
secure with 1/4” x 1 3/8” (M6 x 35mm) anchor bolts
(not provided).
Concrete foundation
B. Walls & Columns
2
B3C
B4D
(2) Corner Column Short (CCB)
(1) Corner Column Long (CCC)
(1) Door Column Left Short (CDLC)
(1) Door Column Right Long (CDRC)
(2) Middle Column Short (CMB)
(1) Middle Column Long (CMC)
(2) Half Side Panel (FSP )
(3) Side Panels Short (SP )
(2) Side Panel Long (SPC )
All panels are clearly marked and care
should be taken to use the correct one.
Note
TIP
Left
(1) Front Center Band (CB1C)
(1) Back Center Band (CB2C)
(1) Left Side Center Band (CB2B)
(1) Front Bottom Cross Center Band (CB4C)
(1) Right Side Center Band (CB5D)
(1) Front Top Cross Center Band (CB6C)
(3) Center Band Fitting (FCB)
(1) CB5 Fitting (FCB5C)