
Contents
2Installation instructions aroTHERM 0020217827_03
Contents
1 Safety .................................................................... 3
1.1 Action-related warnings ......................................... 3
1.2 Intended use.......................................................... 3
1.3 General safety information .................................... 3
1.4 Regulations (directives, laws, standards).............. 5
1.5 Regulations............................................................ 5
1.6 Other regulations ................................................... 5
2 Notes on the documentation .............................. 6
2.1 Observing other applicable documents ................. 6
2.2 Storing documents................................................. 6
2.3 Validity of the instructions...................................... 6
3 System overview.................................................. 6
3.1 Safety devices ....................................................... 6
3.2 Design of the heat pump system ........................... 6
3.3 Functionality........................................................... 6
3.4 System diagram (VWL 55/3 A 230 V).................... 7
3.5 Basic system diagram (VWL 85/3 A 230 V) .......... 7
4 Product overview................................................. 8
4.1 Type designation and serial number ..................... 8
4.2 Information on the data plate................................. 8
4.3 CE marking............................................................ 8
4.4 Local regulations.................................................... 8
5 Assembly and installation .................................. 9
5.1 Preparing for fitting and installation ....................... 9
5.2 Carrying out the installation ................................. 13
5.3 Hydraulics installation.......................................... 14
5.4 Carrying out the electrical installation.................. 15
6 Start-up ............................................................... 16
6.1 Run the start-up................................................... 16
6.2 Heat pump operating concept ............................. 17
6.3 Running through the installation assistant........... 17
6.4 Calling up Live Monitor (checking status
codes).................................................................. 17
6.5 Calling up statistics.............................................. 17
6.6 Filling the heating circuit ...................................... 17
6.7 Checking and treating the heating water/filling
and supplementary water .................................... 18
6.8 Filling the heating installation .............................. 19
6.9 Activating the heat pump..................................... 19
6.10 Checking the product's operation ........................ 19
6.11 Operating noises.................................................. 19
6.12 Adjusting the heating circuit................................. 20
6.13 Installing the side casing ..................................... 21
6.14 Instructing the end user....................................... 21
7 Maintenance ....................................................... 21
7.1 Observing maintenance intervals ........................ 21
7.2 Preparing for maintenance .................................. 21
7.3 Instructions before carrying out maintenance
work ..................................................................... 21
7.4 Yearly maintenance............................................. 21
7.5 Cleaning the product............................................ 22
7.6 Draining the product ............................................ 22
7.7 Checking the product's status codes................... 23
7.8 Checking the electrical installation ...................... 23
7.9 Start-up following maintenance ........................... 23
8 Troubleshooting ................................................ 23
8.1 Troubleshooting................................................... 23
8.2 Fault codes .......................................................... 23
8.3 Carrying out the actuator test .............................. 23
8.4 Carrying out check programmes ......................... 24
9 Decommissioning.............................................. 24
9.1 Temporary decommissioning .............................. 24
9.2 Permanently decommissioning............................ 24
10 Recycling and disposal..................................... 24
10.1 Arranging disposal of refrigerant ......................... 24
11 Customer service............................................... 24
Appendix ............................................................................ 25
A Connection diagrams........................................ 25
A.1 Wiring diagram (VWL 55/3 A 230 V, VWL 85/3
A 230 V)............................................................... 25
B Heat pump schematic........................................ 26
B.1 Heat pump basic diagram (VWL 55/3 A
230 V) .................................................................. 26
B.2 Heat pump basic diagram (VWL 85/3 A
230 V) .................................................................. 27
C Heat pump setting parameters......................... 27
D Status codes ...................................................... 28
E Technical data.................................................... 30
F Overview of fault codes .................................... 32
G Commissioning Checklist................................. 35
Index ................................................................................... 38