Vaisala Optimus OPT100 User manual

M211857EN-A
Installation
Guide
Vaisala Optimus™DGA Monitor for Transformers
OPT100
DRAFT
24 May 2017

PUBLISHED BY
Vaisala Oyj
Street address: Vanha Nurmijärventie 21, FI-01670 Vantaa, Finland
Mailing address: P.O. Box 26, FI-00421 Helsinki, Finland
Phone: +358 9 8949 1
Fax: +358 9 8949 2227
Visit our Internet pages at www.vaisala.com.
© Vaisala 2017
No part of this manual may be reproduced,
published or publicly displayed in any form
or by any means, electronic or mechanical
(including photocopying), nor may its
contents be modified, translated, adapted,
sold or disclosed to a third party without
prior written permission of the copyright
holder. Translated manuals and translated
portions of multilingual documents are
based on the original English versions. In
ambiguous cases, the English versions are
applicable, not the translations.
The contents of this manual are subject to
change without prior notice.
Local rules and regulations may vary and
they shall take precedence over the
information contained in this manual.
Vaisala makes no representations on this
manual’s compliance with the local rules
and regulations applicable at any given
time, and hereby disclaims any and all
responsibilities related thereto.
This manual does not create any legally
binding obligations for Vaisala towards
customers or end users. All legally binding
obligations and agreements are included
exclusively in the applicable supply
contract or the General Conditions of Sale
and General Conditions of Service of
Vaisala.
This product contains software developed
by Vaisala or third parties. Use of the
software is governed by license terms and
conditions included in the applicable
supply contract or, in the absence of
separate license terms and conditions, by
the General License Conditions of Vaisala
Group.
This product may contain open source
software (OSS) components. In the event
this product contains OSS components,
then such OSS is governed by the terms
and conditions of the applicable OSS
licenses, and you are bound by the terms
and conditions of such licenses in
connection with your use and distribution
of the OSS in this product. Applicable OSS
licenses are included in the product itself
or provided to you on any other applicable
media, depending on each individual
product and the product items delivered
to you.

Table of Contents
1. About This Document........................................................................................ 5
1.1 Version Information............................................................................................... 5
2. Planning The Installation...................................................................................7
2.1 Installation Safety...................................................................................................7
2.2 Installation Phases................................................................................................. 8
2.3 Required Personnel................................................................................................8
2.4 Required Materials................................................................................................. 9
2.5 Recommended Tools........................................................................................... 10
2.6 Storing and Transporting the DGA Monitor....................................................... 11
2.7 Preparations for Reinstalling a DGA Monitor..................................................... 11
2.8 Installation Site Requirements............................................................................. 11
2.8.1 Installation Location of DGA monitor........................................................... 11
2.8.2 Recommended Locations of Oil Connections............................................ 13
3. Mechanical Installation.....................................................................................15
3.1 Unpacking DGA Monitor......................................................................................15
3.2 Mounting with Ground Mounting Set.................................................................15
3.2.1 OPT100 Parts with Ground Mounting Set................................................... 17
3.2.2 OPT100 Dimensions with Ground Mounting Set........................................19
3.3 Mounting with Wall Mounting Set.....................................................................20
3.3.1 OPT100 Parts with Wall Mounting Set........................................................22
3.4 Installing the Oil Lines......................................................................................... 23
3.5 Attaching the Power Supply Unit...................................................................... 24
3.6 Attaching the Radiation Shield.......................................................................... 25
4. Electrical Installation........................................................................................27
4.1 Cable Glands and Connectors............................................................................ 27
4.2 Grounding the DGA Monitor.............................................................................. 28
4.3 Connecting DC Power to DGA Monitor.............................................................29
4.4 Connecting Relay Control to Power Supply Unit..............................................31
4.5 Connecting RS-485............................................................................................. 33
4.6 Connecting Ethernet........................................................................................... 35
4.7 Connecting Relays...............................................................................................36
4.8 Connecting AC (Mains) Power........................................................................... 38
4.9 Verifying Tightness of Cable Glands.................................................................40
5. Commissioning...................................................................................................43
5.1 Turning On the DGA Monitor............................................................................. 43
5.2 Connecting to the User Interface...................................................................... 43
5.3 Initializing the DGA Monitor...............................................................................44
5.4 Starting Measurement Mode..............................................................................45
5.5 Finalizing the Installation....................................................................................45
6. Installation Verification...................................................................................47
6.1 Installation Checklist........................................................................................... 47
6.2 Safety Checklist................................................................................................... 48
Technical Support.......................................................................................................51
Warranty......................................................................................................................... 51
Recycling........................................................................................................................ 51
Table of Contents
1

List of Figures
Figure 1 Possible Locations of Oil Connections..........................................................13
Figure 2 Assembly of the Mounting Stand...................................................................16
Figure 3 OPT100 Front Parts with Ground Mounting Set........................................ 17
Figure 4 OPT100 Rear Parts with Ground Mounting Set..........................................18
Figure 5 OPT100 Dimensions with Ground Mounting Set....................................... 19
Figure 6 OPT100 Front Parts with Wall Mounting Set..............................................22
Figure 7 OPT100 Rear Parts with Wall Mounting Set............................................... 22
Figure 8 OPT100 DGA Monitor Cable Glands and Connectors..............................27
Figure 9 OPTPSU1 Power Supply Unit Cable Glands and Connectors.................28
Figure 10 Terminal Block Y3 Wiring................................................................................ 29
Figure 11 Terminal Block X5 Wiring................................................................................30
Figure 12 Terminal Block Y2 Wiring................................................................................ 32
Figure 13 Terminal Block X4 Wiring................................................................................ 33
Figure 14 Terminal Block Y1 Wiring Example................................................................35
Figure 15 Terminal Block X3 Wiring for Normally Open (NO) Relay
Connection...........................................................................................................37
Figure 16 Terminal Block X1 Wiring.................................................................................40
OPT100 Installation Guide M211857EN-A
2

List of Tables
Table 1 Document Versions................................................................................................. 5
Table 2 Terminal Block Y3 Wiring....................................................................................29
Table 3 Terminal Block X5 Wiring....................................................................................30
Table 4 Terminal Block Y2 Wiring.................................................................................... 32
Table 5 Terminal Block X4 Wiring....................................................................................33
Table 6 Terminal Block Y1 Wiring.....................................................................................35
Table 7 Terminal Block X3 Wiring.................................................................................... 37
Table 8 Terminal Block X1 Wiring.................................................................................... 40
List of Tables
3

OPT100 Installation Guide M211857EN-A
4

1. About This Document
1.1 Version Information
Table 1 Document Versions
Document Code Date Description
M211857EN-A - First version.
Chapter 1 – About This Document
5

OPT100 Installation Guide M211857EN-A
6

2. Planning The Installation
2.1 Installation Safety
Read the installation instructions carefully before installing the product. If
you encounter the following marking during installation, consult product
documentation to find out the nature of the potential hazards and any actions which
have to be taken to avoid them:
WARNING!
Only licensed experts may install electrical components. They must
adhere to local and state legislation and regulations.
WARNING!
Make sure that you prepare only de-energized wires.WARNING!
Keep away from live circuits. Operating personnel must observe safety
regulations at all times.
WARNING!
Ground the DGA monitor chassis as instructed in the wiring instructions.
Verify the grounding before and after performing maintenance on the unit.
WARNING!
Do not modify the DGA monitor or use it in ways not described in the
documentation. Modifications may lead to safety hazards, equipment damage, failure to
perform according to specification, or decreased equipment lifetime.
CAUTION!
Chapter 2 – Planning The Installation
7

Surfaces inside the DGA monitor that are marked with the symbol below
heat up during normal operation. Avoid touching the hot surfaces and wear protective
gloves when working inside the enclosure. Whenever possible, allow the device to cool
down before starting the work.
CAUTION!
Wear protective eyewear and gloves.
Follow the safety regulations of the installation site.
The safety of any system incorporating this equipment is the responsibility of the
assembler.
2.2 Installation Phases
Perform the installation of the DGA monitor in the following phases:
• Planning
• Mechanical installation
• Electrical installation
• Commisioning
• Installation verification
These phases correspond to chapters of the Installation Guide. As part of the final
installation verification phase, use the provided installation checklists to make sure you have
done all of the required installation steps.
2.3 Required Personnel
Installation of the DGA monitor requires two persons. While most of the installation and
commissioning tasks can be done by a single person, safe carrying and lifting of the DGA
monitor requires two persons.
Installers must have the necessary training to legally perform all required tasks. For example,
connecting the DGA monitor to mains power must be done by a licensed electrician.
OPT100 Installation Guide M211857EN-A
8

Applicable legislation and site safety guidelines may require additional personnel to be
present in the installation.
2.4 Required Materials
In addition to the items delivered by Vaisala, installation of the DGA monitor requires
various materials that you must supply yourself.
Items Delivered by Vaisala
• DGA Monitor (Vaisala item OPT100)
• DGA Monitor enclosure
• Swagelokâfitting SS-10M0-61-6M (2 pcs)
• Protection shell for Ethernet connector
• Relay control cable (marked RELAY, Vaisala cable CBL210539)
• Enclosure key
• Power Supply Unit (Vaisala item OPT100PSU)
• Power Supply Unit enclosure
• DC power cable (Vaisala cable CBL210544)
• Enclosure key
Optional items (must have either Wall Mounting Set or Ground Mounting Set):
• Wall Mounting Set (Vaisala item OPTMSET1)
• Installation beam (2 pcs)
• Cradle for Power Supply Unit
• Screws and washers
• Ground Mounting Set (Vaisala item OPTMSET2)
• Mounting stand (delivered in three parts)
• Wedge anchors (6 pcs) for securing the mounting stand to ground
• Screws, washers, and nuts
• Radiation Shield (Vaisala item OPTSHLD1)
• Radiation shield (delivered in three parts)
• Screws and washers
DGA Monitor Installation and Commissioning
• Grounding cable with max 16 mm2conductor. Enough to reach from the DGA monitor
and the power supply unit to the grounding point(s).
• AC power cable with 2.5 mm2(AWG10) wires and 9 ... 16 mm external diameter. Must be
compliant with local regulations for mains power cables.
• Relay cable
• RS-485 cable
Chapter 2 – Planning The Installation
9

• Shielded outdoor Ethernet cable with a RJ-45 connector for the permanent Ethernet
connection
• Laptop computer with:
• RJ-45 Ethernet connector
• Web browser (Google Chrome, Microsoft Internet Explorer, or Mozilla Firefox)
• Ethernet cable with RJ-45 connectors for temporary use
Oil Pipe Construction
The amount of required oil pipe construction materials depends on the intended pipe
length. Two pipes are needed, one for intake and one for returning the oil. Using the
recommended pipe material, the maximum allowed length of a single pipe is 10 m (33 ft). If
you are using a smaller pipe (minimum inner diameter 4 mm (0.157 in)), the maximum
length is 5 m (16 ft).
• Recommended oil pipe material: stainless steel pipe with 10 mm (0.393 in) outer
diameter, at least 6 mm (0.24 in) inner diameter. Enough to connect the inlet and outlet
valves to the DGA monitor.
• Adapters for connecting the oil pipes to the valves on the transformer
• Adapters for connecting the oil pipes to the DGA monitor (if not using recommended
oil pipe size). For 3/8 inch pipe, use Swagelokâadapter SS-600-R-10M.
• Pipe fittings for joining pipe sections
• Pipe supports
• Oil pipe insulation (if necessary)
• Oil absorption material for controlling possible leaks
• Rags for wiping o oil
Other
• Personal safety equipment as required by installation site and applicable legislation
2.5 Recommended Tools
Hand Tools
• Screwdrivers with slotted and Phillips heads
• Wrenches of various sizes
• Socket wrench and socket set
• Hex keys
• Cutting tools
• Cable stripping tool
• Metal file
• Measuring tape
• Impact drill and bits
• Bubble level
• Multimeter
Tools for Oil Pipe Construction
• Pipe bending tool
OPT100 Installation Guide M211857EN-A
10

• Pipe cutting tool
• Pipe deburring tool
• Pressurized air, either a bottle or a compressor
• Degreasing cleaning spray
• Container for waste oil (at least 5 liter capacity)
2.6 Storing and Transporting the DGA
Monitor
Keep the DGA monitor and any installation accessories in their original packaging during
storage and transport. Keep the items dry and in conditions allowed by the storage
specification. Honor any handling instructions marked on the outside of the packaging.
After installation, store the packaging in a dry place. You can reuse it if the DGA monitor is
stored and/or transported again.
2.7 Preparations for Reinstalling a DGA
Monitor
If you want to relocate an already installed DGA monitor, you must prepare it for transport
and reinstallation by following the uninstallation procedure. See OPT100 User Guide for
details.
2.8 Installation Site Requirements
DGA monitor can be installed and successfully operated in a wide variety of environments.
Operation in cold environments may require trace heating elements and thermal insulation
to be placed over the exposed sections of the oil pipes. If you have any questions, contact
Vaisala for more information.
Performing a site inspection in person is a good idea. Take photographs of the intended
installation location, oil connections, and electrical connections. Measure the amount of
cable and oil pipe needed.
2.8.1 Installation Location of DGA monitor
The DGA monitor can be attached to the transformer chassis or to its immediate vicinity. The
location must fulfill the following requirements:
• The location must be close to the oil connections to minimize the length of the oil lines.
The maximum length of the lines is 10 m (33 ft) each.
• The location must be safely accessible from the floor without the need to climb or
reach.
Chapter 2 – Planning The Installation
11

• There must be enough room and suitable supporting structures to install the DGA
monitor in a vertical orientation. The DGA monitor must not be tilted more than 5
degrees.
• If the Ground Mounting Set will be used to install the DGA monitor, there must be a
level concrete surface that is at least 100 mm thick.
If you have many suitable locations, prefer the following:
• Locations that are protected from rain and solar radiation.
• Locations where the vibration and heat from the transformer are not directly conducted
to the DGA monitor.
OPT100 Installation Guide M211857EN-A
12

2.8.2 Recommended Locations of Oil Connections
You must build two oil lines between the DGA monitor and the transformer: one for intake of
fresh oil, and an outlet line for returning the measured oil. Make sure you have appropriate
adapters for connecting the oil lines to the valves. The maximum allowed length of an oil line
is 10 m (33 ft). The location of oil connections on the transformer impacts the performance
of the DGA monitor.
2
3
4
5
1
Figure 1 Possible Locations of Oil Connections
1Oil reservoir. Not recommended.
2Side of the oil tank, top level. Good for returning the measured oil.
3Side of the oil tank, high enough from the bottom to enable proper oil movement. Good
for oil intake. Moisture response time is moderate depending on the oil volume.
4Straight section in the radiator’s outlet pipe. Good location if the pipe has guaranteed
oil flow.
Oil flow guarantees that the sampled oil is representative, and the cooling flow carries
the outlet oil from the monitor away from the inlet. Compared to the radiator inlet pipe,
oil in the outlet pipe is cooler, preventing unnecessary heating of the DGA monitor.
5Drain valve of the oil tank. Not recommended.
Measurement response time is poor due to static oil flow. There is also risk of separated
water (leading to wrong results) and oil sludge (risk of sensor contamination and
clogged filter).
Chapter 2 – Planning The Installation
13

DGA monitor needs to pump oil in both directions during initialization and maintenance.
To make sure this is possible, check that:
• Intake and outlet valves are both below oil level in the transformer. There should be
no risk of drawing gas into the pipes even when the flow is reversed.
• There are no flow direction control valves on the oil lines.
OPT100 Installation Guide M211857EN-A
14

3. Mechanical Installation
3.1 Unpacking DGA Monitor
• Wire cutters
Two persons are required to lift the DGA monitor out of the packaging.
1. Cut the packing straps and remove the cover.
2. Remove the top padding from the box.
3. Lift the DGA monitor out of the box and place it on a stable surface with the door
pointing up.
The cable glands and oil connections of the DGA monitor are located
on the bottom of the enclosure. When unpacking and moving the DGA monitor,
avoid putting the bottom of the DGA monitor on the ground. Putting the weight of
the unit on the cable glands and oil connections may damage them.
CAUTION!
3.2 Mounting with Ground Mounting Set
• Ground Mounting Set (Vaisala item OPTMSET2)
• Mounting stand (delivered in three parts)
• Wedge anchors (6 pcs) for securing the mounting stand to ground
• Screws, washers, and nuts
• 6 mm hex key
• 13 mm wrench
• Impact drill and bits
Use the Ground Mounting Set when a free standing installation of the DGA monitor is
needed. The mounting surface must allow the use of wedge anchors to secure the mounting
stand. A concrete surface that is at least 100 mm thick is recommended.
Chapter 3 – Mechanical Installation
15

3
2
1
4
Figure 2 Assembly of the Mounting Stand
1Mounting holes on the top are for attaching the DGA monitor.
2Mounting holes on the side join the parts of the mounting stand together.
3Holes on the bottom (three on each side) are for anchoring the mounting stand to the
ground.
4Attach the power supply unit to the middle part using these four holes.
1. Assemble the mounting stand. Tighten the screws to finger tightness at this point, not
all the way.
2. Using the assembled mounting stand as the template, mark the locations of the six
anchors on the mounting surface.
3. Drill holes for the anchors using an impact drill and an 8 mm drill bit. The holes must be
60 mm deep.
4. Install the anchors in the holes.
5. Verify that the mounting stand is securely anchored.
6. Attach the mounting stand to the anchors.
OPT100 Installation Guide M211857EN-A
16

7. Attach the DGA monitor to the top of the mounting stand.
8. Tighten the screws to 20 Nm tightness.
3.2.1 OPT100 Parts with Ground Mounting Set
1
2
3
4
5
6
Figure 3 OPT100 Front Parts with Ground
Mounting Set
1Status LEDs
2OPT100 DGA Monitor
3Door lock (3 pcs)
4Power Supply Unit
5Door lock
6Mounting stand
Chapter 3 – Mechanical Installation
17

1
2
3
Figure 4 OPT100 Rear Parts with Ground
Mounting Set
1Radiation shield
2Cable glands and oil connections for DGA
Monitor
3Cable glands for power supply unit
OPT100 Installation Guide M211857EN-A
18
Other manuals for Optimus OPT100
4
Table of contents