Walton 01OVLPA0806SDFW-V1 Instruction manual

N/A
Overlap
Cladding
Shiplap
Cladding
Solid Sheet
Roof
T&G Roof
Solid Sheet
Floor
T&G Floor
Fixed
Windows
Opening
Windows
No
Windows
For Assistance Please
Contact Customer Care on
01636 880514
2mm Drill bit
x2
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
All building’s should be erected by two
adults
For ease of assembly, it is advisable to
pilot drill all screw holes and ensure
all screw heads are countersunk.
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be aected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to
protect the product during transit and for up to 3 months against mould. To
validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
building is treated with a wood preserver within the rst three months of
assembly and thereafter in accordance with the manufactures recommenda-
tions. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Whilst all products manufactured are made to the
highest standards of Safety and in the case of children's
products independently tested to EN71 level, we cannot
accept responsibility for your safety whilst erecting or
using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
www.merciagardenproducts.co.uk
CAUTION
Every eort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timer.
**Protim Fentex E5**
Biocidal Product Regulation (EU 528/2012) Article 58 Information
Protim Fentex E2 preserved wood is a “treated article”which incorporates biocidal products.
Wood correctly preserved with Protim Fentex E2 is protected against mould in storage.
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
Wear gloves when handling freshly treated wood.
Avoid breathing dust when cutting treated or untreated wood.
Dispose of o-cuts responsibly – do not burn.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer
to diagrams for the base dimensions, The base should be slightly smaller than
the external measurement of the building, i.e. The cladding should overlap the
base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Please retain product label and instructions for future reference
P 1
General Instructions
01OVLPA0806SDFW-V1
8x6 Overlap apex shed with single door, fixed windows, solid sheet floor and roof.
01OVLPA0806SDFW-V1-NW
8x6 Overlap apex shed with single door, no windows, solid sheet floor and roof.
01OSBA0806SDFW-V1
8x6 Shiplap apex shed with single door, fixed windows, solid sheet floor and roof.
01OSBA0806SDFW-V1-NW
8x6 Shiplap apex shed with single door, no windows, solid sheet floor and roof.
Refer to the instructions pages for you specic product code
14/01/2014

P 7
01OSBA0806SDFW-V1 & 01OSBA0806SDFW-V1-NW
Please retain product label and instructions for future reference
Before assembly
please make sure you have a
suitable base ready to erect your
building
MADE IN GREAT BRITAIN
Overall Dimensions:
Length = 2414mm
Width = 1905mm
Height = 1986mm
Base Dimensions:
Length = 2350mm
Width = 1753mm
01OSBA0806SDFW-V1
01OSBA0806SDFW-V1-NW
Building content
10
11
12
13
14
Fascia 1016mm x4
Fixed Window Strip 546mm x5 FW-V1 ONLY
Cover Trims 1575mm x4
Ridge Bar 2304mm
Finial x2
Door Gable Back Gable Plain Side
Qty 2 -NW only
Window Panel
FW-V1 ONLY
Floor Roof
x2
Door
x2
8
1 2 34
5
6 7
9
17
Door Beading Strip 1590mm x2
T Hinge
Qty 3
Plastic Window Cill
FW-V1 ONLY
Felt
Styrene Qty 2
FW-V1 ONLY
18 19 21
L-Bracket
Qty 2
16
Capping
Felt
Turn Button
Qty 2
20
15
Eaves Frame 1195mm x4
Nail Bag Felt Tacks x 100
20mm Screw x 8
30mm Black Screw x 2
30mm Screw x 62
50mm Screw x 28
40mm Screw x 44
Remove transportation
blocks from the bottom
of each panel before
beginning assembly. Each
Panel should have two
Pre Assembly
Fix the T Hinges onto the
doors and door frame as
shown. Ensure that the
screws go through the
cladding and into the
framing behind.
21x30mm screws
1
7
15
30mm
screw
Pre drill
hole

P 8
Place the floor on a firm and level base,
ensure the base has suitable drainage free
from areas where standing water can collect.
See the front page for base requirments.
Step 1
5
Do not secure the building to the
floor until the roof is fitted. Fix the
panels onto the floor using 50mm
screws in alignment with the floor
joists
Fix the corners with 50mm screws
as shown in diagram.
Position the panels so there is equal spacing
between the floor and cladding on all 4 sides
Step 2
3
2
3x50mm Screws
Pre drill
hole
50mm
screw
Step 3
9x50mm Screws
Fix the corners with 50mm
screws as shown in diagram.
1
4
Use for no
window buildings
3
Pre drill
hole
50mm
screw
Step 4
8x20mm Screws
Place the ridge bar in between the front
and back gables. Ensure the top corners
of the ridge bar sit flush with the top
points of the door gable. Fix the ridge bar
to the gable using one L bracket for each
end.
Fix with 4x20mm screws each
12
21
20mm
screw Pre drill
hole

P 9
Step 5
Fix two eaves frames to each roof sheet
using 3x30mm screws per eave.
Fix the roof sheets to the roof ensuring
they come together at the top using
40mm screws directly through the roof
sheet at the top. Make sure to attach the
roofs to the ridge bar.
13
6
30mm
screw
13
12x 30mm Screws
28x 40mm Screws
40mm
screw Pre drill
hole
Pre drill
hole
Step 6
bOnce the roof is fixed
attach the building to
the floor with 50 mm
screws.
16x 50mm Screws
50mm
screw Pre drill
hole
100x Tacks
Felt
tacks
18
19
192
18
Step 7
Cut the felt into 2 sheets at 2490mm and
fix onto the roof using felt tacks as shown
in diagram ensuring there is 50mm
overhang around the sides. Cut the
capping felt to 2490mm and fix over the
centre of the apex as shown in the
diagram ensuring there is 50mm over-
hang around the sides.
HANDLE
WITH CARE
12
3
4

P 10
Fit the Cover Trims to the front
and back of the building as
shown in the illustration using
30mm screws.Trim the length
of the cover trims to the
required size before fitting if
necessary.
Pre drill to avoid splitting.
12x30mm Screws
10
Step 8
10
10
30mm
screw
Pre drill
hole
Step 9
16x40mm Screws
Attach the faiscas to the roof
leaving a slight overhang at the
top.
Fit the fascias to the roof over
the felt and secure in place with
40mm screws as shown.
Pre drill to avoid splitting.
8
14 88
14
8
40mm
screw
Pre drill
hole
Step 10
16
19
Side View Place the
plastic window
cill onto the
Window Panel
in the same
way as shown
on both
diagrams to the
left.
Fit the styrene sheets on top of
the window cill.
When positioning the styrene
sheets ensure there is an equal
distance between them and at
either side of the windows.
Fix the window strips to the
two pieces of framing that sit
alongside the outside edges
of the window with 3x30mm
screws for each strip.
Attach the three window strips
at either side of the windows
using 3x30mm screws each.
Make sure the screws enter the
framing in the window panel
and not the styrene.
9x30mm Screws
For the no window version go to step 11
9
9
9
9
9
9
30mm
screw Pre drill
hole
6x30mm Screws
30mm
screw Pre drill
hole
9
9
This manual suits for next models
3
Table of contents
Other Walton Outdoor Storage manuals
Popular Outdoor Storage manuals by other brands

LIVING AND HOME
LIVING AND HOME 0735940285711 user guide

USP
USP DURAMAX 10 Ft x 8 Ft StoreMax Plus owner's manual

rollaway container
rollaway container ARPCA24 manual

Duratuf
Duratuf GL105 Assembly instructions

Viking
Viking SD5300SS Use & installation guide

USP
USP DURAMAX Apex Pro 10.5 Ft x 8 Ft 40116 owner's manual