Propane Gas Piping Sizes ............................................................................................................... 29
Propane Gas Piping Connections....................................................................................................29
Propane Gas Supply Pressure Requirements.................................................................................. 29
4.10 Flow And Return Pipe Connections............................................................................................................ 29
4.11 Pressure Relief Valve................................................................................................................................. 30
4.12 CSD-1 Manifold Assembly (Supplied)......................................................................................................... 30
4.13 Determination Of Primary Boiler Pump or Boiler System Pump.................................................................. 32
4.14 Condensate Piping And Drain.................................................................................................................... 33
4.15 Water Treatment......................................................................................................................................35
4.16 Important Installation Warnings................................................................................................................ 35
4.16.1 Oxygen Levels in the System Water Warning ..................................................................................35
4.16.2 Antifreeze Compatibility Warning................................................................................................... 35
4.16.3 Lime Scale and Corrosive Water Damage Warning .......................................................................... 35
4.16.4 Connection to Refrigeration System Warning..................................................................................36
4.17 Optional Air Intake Connection .................................................................................................................36
4.18 Flue Manifold Installation..........................................................................................................................36
4.19 Flue Exhaust Piping To Vent ......................................................................................................................38
4.20 Vent Starter Pieces.................................................................................................................................... 39
4.21 Combustion Air and Ventilation Openings ................................................................................................. 40
4.21.1 Insufficient Ventilation and Combustion Air....................................................................................40
4.21.2 Room Air Combustion..................................................................................................................... 41
4.21.3 Sealed Combustion......................................................................................................................... 41
4.22 Installing the Exhaust and Air Intake System.............................................................................................. 42
4.22.1 Important Factors for Terminal Orientation and Location................................................................ 42
4.22.2 Minimum and Maximum Wall Thickness......................................................................................... 43
4.23 Vent Pipe Sizing ........................................................................................................................................43
4.24 Electrical Connections............................................................................................................................... 45
4.24.1 Regulations in Force .......................................................................................................................45
4.24.2 Mains Electrical Supply Connection (120 V –60 Hz).........................................................................45
4.24.3 Service Relay Requirement ............................................................................................................. 46
4.24.4 Electrical Requirements.................................................................................................................. 46
4.25 Functional Wiring Diagram page 1............................................................................................................. 48
4.26 Functional Wiring Diagram, page 2............................................................................................................ 49
4.27 Module Ladder Diagram............................................................................................................................ 50
4.28 General Ladder Diagram ........................................................................................................................... 51
4.29 Input/Output Box Terminal Assignments................................................................................................... 52
4.30 Starting Up: Filling and De-Aerating The Boiler ..........................................................................................53
4.30.1 Necessary Precautions for Safety.................................................................................................... 53
4.30.2 Supply Voltage, Gas Pressure, and Water pressure..........................................................................53
4.31 Filling The System .....................................................................................................................................53
4.31.1 Necessary Precautions While Filling the System ..............................................................................53
4.31.2 Filling Locations and Preparation ....................................................................................................54
4.32 Testing The Ignition Safety Shut-Off Device ............................................................................................... 56
4.33 Burner Calibration..................................................................................................................................... 57
4.33.1 Installing Gas Analyzer Probe into Flue Outlet................................................................................. 57
4.33.2 Maximum Output Calibration .........................................................................................................58
4.33.3 Minimum Output Calibration.......................................................................................................... 59
4.33.4 Final Check and Ignition Failure Adjustment Procedure...................................................................59
4.34 Sweeper Mode (Manual Control) ..............................................................................................................61
4.35 High Altitude Adjustment..........................................................................................................................63
4.36 High Altitude Conversion Label..................................................................................................................64
4.37 Conversion From Natural Gas to Propane Gas ........................................................................................... 64
4.38 Controls And Emergency Functions ........................................................................................................... 65
4.39 Initial Boiler Ignition.................................................................................................................................. 65
4.39.1 Preliminary Checks ......................................................................................................................... 65
CHAPTER 5: UFLY CONTROLLER & BCM MODULES......................................................................67