
Assembly/ perating Instructions
StageTek™Guardrail
©Wenger Corporation 2013 Printed in USA 04/13 Part #281A442-03
Wenger Corporation, 555 Park Drive, P. . Box 448, watonna, Minnesota 55060-0448
Questions? Call.....USA: 800-4WENGER (493-6437) • Worldwide: 1-507-455-4100 • www.wengercorp.com
Note: Please read and understand the instructions before starting the assembly or installation.
Note: If you need additional information, contact Wenger Corporation using the information below.
Visit the StageTek web page at www.wengercorp.com
for detailed instructions and videos.
Basic Instructions only!
For Replacement arts and more detailed product information,
refer to the StageTek™Owner’s Manual 280A099.
ASSEMBLY WITHOUT OTIONAL INFILL ANELS
To assemble the Guardrail without the optional Infill Panels, attach Rails to the top, middle and
bottom positions of both Upright Weldments using 3/8-16 x 3-3/4” Carriage Bolts, Tube Saddles
and 3/8-16 Acorn Nuts as shown.
Make su e anyone assembling
o installing the StageTek
component has ead and
unde stands the inst uctions.
!CAUTION
Always comply with Wa nings
o Cautions in the inst uctions
o posted on the equipment.
!CAUTION
Gua d ails a e ecommended
fo instances whe e the deck
height is 12” (30 cm) o mo e.
!CAUTION
Tube
Saddle
Upright
Weldment
3/8-16
Acorn
Nut
3/8-16 x 3-3/4”
Carriage Bolt
Top
Rail
End Caps
may need to
be installed
in Rail Ends
Middle
Rail
Bottom
Rail
Tube Saddle
Orientation