
M-SQ PRO 15/18 kVA Marine Diesel Generator 13
However,thenegaveofallthebaeriesonthevesselshouldbe
interconnected(whenonearth)toavoiddierenceinthevoltage
leveloftheearthondierentplacescausingtroubletoelectronic
deviceswhichmightbeinthesystem.
Theaboverecommendaonisnotvalidforshipshavingthestart-
erbaeryofthepropulsionengineorotherauxiliaryequipment
posivegrounded.Whenthisisthecaseanexpertshouldbe
consulted.
Abaeryswitchmaybeusedtointerrupttheposiveconnec-
on.
Thestarterbaeryischargedbythealternatorontheengine.An
addionalbaerychargerwillhelptokeepthebaeryingood
condionwhenthegenerangsetisnotused.Abaerycharger
isnotincludedinthestandardsupply.Ahigheciencybaery
chargingunitcanbeorderedfromWhisperPowerwhichisable
tochargeboththeship’smainbaeryandthestarterbaery.
Alsoasmallchargercanbeusedtochargethestarterbaery
only,suchastheWBCHandy70.Abaeryswitchandacharger
areincludedinthebaeryinstallaonkit(referto2.5).
3 OTHER RECOMMENDATIONS AND WARNINGS
Thebaeryshouldbesecuredforseagoingcondionsandthe
terminalsshouldbeinsulated.Forextrasafetythebaerycan
beenclosedinawooden,plasc,breglassetc.(non-metal)box.
Evenwhentheearthreturnsystemisappliedanegavebaery
cableshouldbeusedandthevesselshouldnottobeusedasa
conductor.
Thebaerycablesaresuppliedinastandardlengthof1.5m,if
longercablesarerequiredalargercrossseconalareashouldbe
consideredtocompensateforvoltagereducon.
Whentwobaeriesareusedinseriestoprovidea24Voltsupply
system,nevertakeo12Volt(starng)powerfromoneofthese
baeries.Thiswillresultinseveredamagetothebaerieswithin
ashortme.
Disconnectthebaeryleadsifelectricalweldingistobecarried
out,otherwisedamagewillbecausedtothediodesofthealter-
nator.
Asexplosivehydrogengasesaredischargedduring
charging,thebaeryshouldbelocatedinawell
venlatedroom.Ensurethatthesuppliedbaery
cableconnectorsareproperlyedandnever
removeduringorshortlyaerchargingassparking
canoccur,whichmayignitethehydrogengases.
1.5.5 AC power system (230 / 400 Volt)
Beforeworking(installaon)onthesystemreadthe
seconsonsafetyintheuser’smanual.
Besurethatallelectricalinstallaons(includingallsafetysys-
tems)complywithallrequiredregulaonsofthelocalauthori-
es.Allelectricalsafety/shutdownandcircuitbreakingsystems
havetobeinstalledonboardasthegenerangsetitselfcannot
beequippedwithsuchequipmentforeverypossiblevariaon.
Thevessel’spowersupplysystemshouldbesuitableandsafefor
theACvoltagewhichisappliedandthepowerthatwillbegen-
erated.Specialaenonhastobepaidondividingthesystemin
brancheswhicharefusedindividually.
Itisabsolutelyessenalthateachandeverycircuitinthe
on-boardelectricalsystemisproperlyinstalledbyaqualied
electrician.
TheM-SQ15andM-SQ18canbeconnectedasasinglephase
230Voltgeneratorbyanarrangementofthewiringindouble
DELTA.WhenthewiresarearrangedinSTARtheoutputwillbe
230/400Volt.
Connectedasathreephase230/400Voltgenerator,3x400
Voltisavailablebetweenthephases.Atthesameme230Voltis
availablebetweeneveryphaseandneutral.
Whenapplying3phasestheinstallaonshouldbelaidoutin
suchawaythatthereisareasonablebalanceofloadbetween
thethreephases.
Toavoidproblemswithunbalancedloadsonecouldapplya400V
3phaseto230Voltsinglephasetransformer.
1 FUSE
Aninputfuse(fromthegenerangsettothesystem)shouldbe
installedtoprotecttheinstalledelectricalsystem.
FortheWhispersthemaximumsinglephasecurrentat230V
is87Amps.Usingthreephasesthefusesshouldbecapableof
withstandingthreemes29Ampsandmechanicallyconnected.
Thefusesmustbeoftheslowreacngtype.Forelectricalmotors
connectedtothesystem,amotorproteconswitchmustbe
installed.
2 GROUNDING
TheACalternatorwindingsarenotgrounded.Thehousingofthe
alternatorandallothermetalpartsaregrounded.
Tomakeaconneconbetween“neutral”and“ground”isneces-
saryaspartofaspecicinsulaonfailureproteconsystem.
SmallpleasurecrainEurope(lengthupto24meter)issubmit-
tedtoTheRecreaonalCraDirecve94/25/EC.Theguidelines
ofthisdirecvereferto(ISO13297).
Whentheinstallaoncomplytothisstandardthe“neutral”and
“ground”shouldbeconnectedonthegenerangsetbyconnect-
ingtheblue(neutral)wirewiththeterminalonwhichtheyellow/
greenwireisconnected.
AGroundFaultCircuitInterrupter(GFCI)orsimilardevicemust
beapplied