Setting the volume flow
•Inthefactorythestrokemarks,i.e.thelowestvolume
flows,arepreset.⇒Nomograms,page5or6
•Othersettingstothestrokemarkscanbemade
onsite:
0132
Construction and function
- Thefireprotectionvalveisessentiallymadeupofaninte-
gratedductforinstallationinwallsorceilings(1).
- Thevalvedisc(3)isinsertedinit.
- Intheeventoffirethereleaseelement(4)reactsandcloses
thevalvediscwithsprings(3).
BV90 fire protection valves
Function,volumeflowsetting
Removingthevalvedisc(3)
Highestvolumeflow
Insertingthevalvedisc(3)
- Todoso,removethevalvedisc(3)fromtheintegratedduct(1)
byturningittotheleft.
- Unfastenthelocknut(7)andsetthesettingsleeve(6)toamark
whichmatchesthedesiredvolumeflow.
- Tightenthelocknut(7)uptotheundersideofthesettingsleeve(6).
- Turnthevalvedisc(3)totherightasfarasitwillgotoinsertit
backintotheintegratedduct(1).
•Avoidsettingastrokemarkgreaterthan!
Theinterlocks(5)thenengageandthevalvedisc(3)isclosed
whenscrewingitintotheintegratedduct(1).
Lowestvolumeflow
Strokemarks
4
Constructionofthefireprotectionvalvesofthe
seriesBV92
1 Integratedduct
3 Valvedisc
4 Releaseelementwithfusiblelinkcapfor
70°C
5 Interlockforclosedvalveposition
6 Volumeflowsettingsleeve
7 Locknut
Theinterlocks(5)arereleasedbyunscrewingthem. In the pro-
cesstheinnerlockingpinsarereleased.
⇒seeoperatinginstructions
1
2
0
3
4
4
Left turn
1
3
Left turn
1
3
4
Raising the guide mechanics
against spring pressure
makes it easier to turn the
setting sleeve.
5
3
6
7
4

UserManual5.51(2021-07)3Subject to change Series BV92
Productandinstallationdetails⇒Page4
Dimensioning:
- Supplyair(radialwall,ceilingorfreestream)⇒Pages5,6
- Exhaustair ⇒Page7
Dryandwetinstallationin:
- rigidwallsandceilings ⇒Page8
- lightshaftwalls ⇒Page9
- metalstudwalls ⇒Pages10,11
- fire-resistantsuspendedceilings ⇒Pages12,13
BV90 fire protection valves as per DIN EN 15650
NewseriesBV92
Fireclassifications: EI30/60/90(ve-ho,i↔o)S
Fireresistanceperiod: 30,60and90minutes
Declarationofperformance: DoPno.:CPR/BV90/002
Constructionmaterialcertification
non-combustible: CertificateMPA-BS6000/593/18
Installationinsuspendedceilings: GeneraltypeapprovalZ-41.8-697
BV90 fire protection valves
Description
Sizes
DN 100, DN 125, DN 160, DN 200
Steel fire protection valve. Shade: pure white RAL 9010.
Installation housing with volume flow adjustable valve disc. A large free
cross section makes for low pressure losses and low noise level.
Enclosed thermal release 70°C with stainless steel mechanics.
Accessories(options):
- Electrical limit switch.Forsignalling"Valveisclosed".
Changeover250VACor24VDC,5A,IP67,with1mconnectioncable3x0.5mm².
⇒Page14
-
Backing boards30 mm or 50 mm in thickness,madeofmineralbuildingmaterial.
Fordryinstallationinmetalstudwallsandinsuspendedceilings.
- SizesDN100,DN125,DN160,DN200
OuterdimensionsDN+150mm ⇒Pages9,12and14
- Installation pipe 100 mm in length,madeofmineralbuildingmaterial.
Fordryinstallationinmetalstudwallsandinmetalsuspendedceilings.
- SizesDN100,DN125,DN160,DN200
OuterdimensionsDN+160mm ⇒Pages11,13and14
- Insulating jacketmadeofgalvanizedsheetsteel.
Withinnerinsulation30mminthickness,madeofmineralwool,40kg/m³.
- SizesDN100,DN125,DN160,DN200
OuterdimensionsDN+75mm ⇒Pages13,14
Limitswitch
onthefireprotection
valve
Insulatingjacket
Installationpipe
Backingboard

UserManual5.51(2021-07)4 Subject to change
Series BV92
Example:
Dry installation suspended in rigid ceilings
Holes∅D1⇒Pages8to13
Wall anchors (2)on the integrated duct(1)arehingedand
rotatable.
Theycanbeusedasmortaranchors(topimage)orasfasten-
inglugsattherear(bottomimage).
BV90 fire protection valves
Productandinstallationdetails
1
2
1 Integratedduct
2 Wallanchoronintegratedduct
3 Thermallyinsulatedvalvedisc
4 Releaseelementwithfusiblelinkcapfor70°C
5 Interlockforclosedvalveposition
6 Settingsleeveforvolumeflow
7 Locknut
8 Spacerforrelease
9 Electricallimitswitch
10 Connectingpieceforventilationduct
11 Screwsmin.4x45mm.
Theymustbeinstalledwithdowelsasnecessary.
8pcs.Drywallscrews4x45mmareincludedinthescopeof
deliveryofthefireprotectionvalves
12 Valvediscseal
13 Intumescentsealonintegratedduct
1
2
Example shownwithoutvalvedisc
Wetinstallationsuspendedinsolidceilings
Connectingelbowwithsocketonthefireprotec-
tionvalve,plugconnectionforpipeconnection
Sizes DN 100 125 160 200
Connectingpiece∅Da[mm] 99 124 159 199
Quantityofwall anchors (2)
on the integrated duct (1) 3 3 4 4
Valveweight[kg] 1.7 2.2 3.0 3.8
1)
TheresistanceofthematerialstofungiandbacteriahasbeenverifiedbytestingthemicrobialmetabolicpotentialaccordingtoDINENISO846.
2)ForfurtherinformationseeoperatinginstructionsBV90fireprotectionvalve
BV90 fire protection valves
• satisfythehygienerequirementsaccordingtoVDI6022-1,VDI3803-1,DIN1946-4,DINEN16798-3,SWKIVA104-01,
SWKIVA105-01,ÖNORMH6020,ÖNORMH6021
• areresistanttomicrobes,andthereforedo not promote the growth of
microorganisms (fungi, bacteria) 1)
• areresistant to cleaning agents and disinfectants2)
• aresuitableforuseinhospitalsandsimilarfacilities!
• meettherequirementsforsurfacedesignandgeometricdesign
9
Ø Da
56
031
Valve stroke
Ø DN + 62
81≈
4
8
13
2
5
6
7
12
3
11
11
10
1
Ø D1
031
73 56
001
DN + 50
001
(Recommendation)

V
X
Y
vmax
v
UserManual5.51(2021-07)5Subject to change Series BV92
X [m] Horizontalairstreampath
Y [m] Verticalairstreampath
v [m/s] FlowvelocityatpointX,Y
vmax[m/s] Max.flowvelocitydownstreamofairstreampathX
V [m³/h] Volumeflow
Maximum flow velocity
Relative flow velocity
BV90 fire protection valves
Dimensioning:Supplyairunderneathceilings
Example
Specified:
Volumeflow V = 120 m³/h
AirstreampathX = 2 m
AirstreampathY =0.125 m
Result:
Max.flowvelocityfromdiagram
v
max =0.18m/s
Calculateairstreampathratio
X/Y =2/0.125=16
Velocityratiofromdiagram
v/vmax=0.82
CalculatetheflowvelocityatpointX,Y
v =(v/vmax)·vmax
v =0.82·0.18=0.15m/s
Theflowvelocitiesofafreestreamarelowerbyafactor
of0.7.
Theflowvelocitiesapplyforallsizesandliftstrokesof
theBV90fireprotectionvalves.
20 30 40 50 70 100150200300400600
Volume flow V [m³/h]
]/m[ svFlow velocity
xam
0,05
0,1
0,2
0,3
0,4
0,5
0,7
1,0
Horizontal air stream path X = 1 m
2
3
5
10
5 10 20 30 40
0,1
0,2
0,3
0,4
0,6
0,8
1,0
0,9
0,7
0,5
v/vVelocity ratio
xam
Stream ratio X / Y

UserManual5.51(2021-07)6 Subject to change
Series BV92
BV90 fire protection valves
Dimensioning:Pressuredrop,soundpowerlevelwithsupplyair
Volume flow with fully opened fire protection valve
V [m³/h] Volumeflow
Dpt [Pa] Totalpressuredrop
LWA [dB(A)] A-ratedsoundpowerlevel
Example
Size DN200,valveposition2
Volumeflow V =171m³/h
Soundpowerlevel LWA = 35dB(A)
Pressuredrop Dpt = 36Pa
Volume flow
withfullyandpartiallyopenedvalveposition(0)
150
[Pa]
2003004006001000
Volume flow V [m³/h]
20
30
40
50
70
100
150
200
Pressure drop t
10
50
45
40
35
30
25
55
20 30 40 50 70 100
Valve position:
DN 10
0
DN 12
5
DN 16
0
DN 20
0
20 30 40 50 70 1001502003004006001000
Volume flow V [m³/h]
20
30
40
50
70
100
150
200
Pressure drop t
10
50
45
40
35
30
25
55
Exhaust air
DN 100
[Pa]
Valve position:
Sound power level L
[Pa]
1000
20
30
40
50
70
100
150
200
Pressure drop t
Valve position:
20 30 40 50 70 100150200300400600
Volume flow V [m³/h]
10
Exhaust air
DN 125
55
35
30
25
50
45
40
Sound power level L
[Pa]
20 30 40 50 70 1001502003004006001000
Volume flow V [m³/h]
20
30
40
50
70
100
150
200
Pressure drop t
10
50
45
40
35
30
25
55
Exhaust air
DN 160
Valve position:
Sound power level L
150
[Pa]
2003004006001000
Volume flow V [m³/h]
20
30
40
50
70
100
150
200
Pressure drop t
10
50
45
40
30
25
55
20 30 40 50 70 100
Valve position:
Exhaust air
DN 200
35
Sound power level L
Supply air
∆pt

UserManual5.51(2021-07)7Subject to change Series BV92
V [m³/h] Volumeflow
DpS [Pa] Staticpressuredrop
LWA [dB(A)] A-ratedsoundpowerlevel
Example
Size DN125,valveposition2
Volumeflow V =168m³/h
Soundpowerlevel LWA = 50dB(A)
Pressuredrop DpS = 95Pa
Volume flow with fully opened fire protection valve
Volume flow
withfullyandpartiallyopenedvalveposition(0)
BV90 fire protection valves
Dimensioning:Pressuredrop,soundpowerlevelwithexhaustair
150
[Pa]
2003004006001000
Volume flow V [m³/h]
20
30
40
50
70
100
150
200
Pressure drop
10
50
45
40
35
30
25
55
20 30 40 50 70 100
Valve position:
DN 10
0
DN 12
5
DN 16
0
DN
200
S
Sound power level
Valve position:
20 30 40 50 70 1001502003004006001000
Volume flow V [m³/h]
20
Zuluft
DN 100
30
40
50
70
100
150
200
Pressure drop S
10
50
45
40
35
30
25
55
Exhaust air
DN 100
[Pa]
Sound power level L
[Pa]
Exhaust air
DN 125
Valve position:
20 30 40 50 70 1001502003004006001000
Volume flow V [m³/h]
20
30
40
50
70
100
150
200
Pressure drop
10
50
45
40
35
30
25
55
S
Sound power level L
[Pa]
20
30
40
50
70
100
150
200
Pressure drop
Valve position:
S
20 30 40 50 70 1001502003004006001000
Volume flow V [m³/h]
10
50
45
40
35
55
30
Exhaust air
DN 160
25
Sound power level L
[Pa]
1502003004006001000
Volume flow V [m³/h]
20
30
40
50
70
100
150
200
Pressure drop
10
50
45
40
35
30
25
55
Exhaust air
DN 200
20 30 40 50 70 100
Valve position:
S
Sound power level L
Exhaust air
∆pS

11
1D
2
W
1
1
1
2
20
X
W
05+ND
1
2
1
1
2 11
11
D
D1
1
UserManual5.51(2021-07)8 Subject to change
Series BV92
BV90 fire protection valves
Installationinrigidwallsandceilings
Installation openings DN [mm] 100 125 160 200
• forwetinstallation 150 175 210 250
Openingroundorrectangular
• (Core)hole∅D1[mm] 120142180220
fordryinstallation
Rigid wallscanbeconstructedasmasonryorfromwallboards.They
canbemanufacturedfromconcrete,light-weightconcrete,gypsum
etc.,andalsobedesignedasfirewalls,shaftwalls,shafts,ductsetc.
Aminimumbulkdensityof450kg/m³isrequired.
Solidbrick,perforatedbrick,hollowblockandevergreaterthickness-
es,higherdensitiesandmultipleshellscanalsobeused.
Rigid ceilingsaregenerallymadeofcast-in-placeconcreteorlight-
weightconcrete.
Installationgapsforwet installationmustbefullysealedwithmortar
ofgroupIIorIIIaccordingtoDIN1053ormortarofclassesM2.5
toM20accordingtoEN998–2;orwithappropriatefireprotection
mortarorgypsummortar.
Dry installation requires exact-fitting holes ∅ D1. The integrated
ducts(2)mustbefastenedwithscrews(11).
Requiredfireresistance
durationinminutes 30,60,90
RigidwallsW ≥95 mm
RigidceilingsD ≥100 mm
Minimum thicknesses W, D [mm] for
installationofBV90fireprotectionvalves:
Dry installation inwalls
Wet installation inwalls
Wetinstallationinrigidceilingscanbeperformedinthesameway
Dimensionsinmm
Dry installationsuspendedin
ceilings
Installation examples
Thefireprotectionvalvesare
shownherewithoutvalvediscs.
Tolerance+2mm
DN+approximately50mm
1 Integratedduct
2 Wallanchoronintegratedduct
11 Screwsmin.4x45mm.
Theymustbeinstalledwithdowelsas
necessary.
8pcs.Drywallscrews4x45mmare
includedinthescopeofdeliveryofthefire
protectionvalves.
20 Gapfillingwith
mortar
Xalternative
Wallanchor(2)turned,mortaredand
fastenedwithscrews(11)attherear.
Verticalinstallation,wetordry,inrigidceilingscanbeperformedinthesameway.
Thevalvediscmustbeequippedwithakickplateonsiteasnecessary.
Thefireprotectionvalvesmustbeinstalledwith
spacingof≥200mmbetweentheintegrated
ducts(1).

22
05+ND
2
X
≥100
20
W
051+ND
1
1D
W
≥100
21/22
1
1
11
2
051+ND
1
2
11
≥100
1
1
1D
22
UserManual5.51(2021-07)9Subject to change Series BV92
BV90 fire protection valves
Installationinlightshaftwalls
Dry installation
Required
fireresistanceperiod
inminutes
30,60,90
Shaftwallsmadeof
gypsumorequivalent
boards
≥40 mm
Minimum thicknesses W [mm] forin-
stallationofBV90fireprotectionvalves:
Theshaft wallsmustbemadeupofatleast2x20mmDFgypsum
boardsaccordingtoEN520orequivalents.
Metalstudsandmineralwoolcanbearrangedononeside.
Installationgapsforwet installationmustbefullysealedwithmortar
ofgroupIIorIIIaccordingtoDIN1053ormortarofclassesM2.5
toM20accordingtoEN998–2;orwithappropriatefireprotection
mortarorgypsummortar.
Thewallsaretobefilledintheareaoftheinstallationopeningswith
slabsofwall-buildingmaterial,size≥DN+150mm.
Dry installationrequiresexact-fittingholes∅D1.Integratedduct(1)
fastenedwithscrews(11)atfrontandrear.
Installation openings DN [mm] 100 125 160 200
• forwetinstallation 150 175 210 250
Roundorsquareopening
• (Core)hole∅D1[mm] 120142180220
fordryinstallationwithwallfilling
X a lternative
Wallanchor(2)turned,mortared
andfastenedwithscrews(11)at
therearoronbothsides.
Tolerance+2mm
DN+approximately50mm
Wet installation
1 Integratedduct
2 Wallanchoronintegratedduct
11 Screwsmin.4x45mm,
8pcs.Drywallscrews4x45mmarein-
cludedinthescopeofdeliveryofthefire
protectionvalves
20 Gapfillingwith
mortar
21 Chuckplates30mmor50mm
⇒Pages3,14
or
22Panelsofwall-buildingmaterial
Installation examples
Thefireprotectionvalvesare
shownherewithoutvalvediscs.
Double up walls in the area of the in-
stallation openings with panels ≥DN +
150mm made of wall-building material
(22)to≥100mm;shownherescrewed
in3layers.
Chuck plates(21),30mmand50mm,
canalsobeused.
For wet installation, their installation
openings must be enlarged to ≥ DN +
50mm!
Doubles and walls must be properly
screwedtogether.
Dimensionsinmm
Thefireprotectionvalvesmustbeinstalledwith
spacingof≥200mmbetweentheintegrated
ducts(1).

UserManual5.51(2021-07)10 Subject to change
Series BV92
BV90 fire protection valves
Installationinmetalstudwallscladonbothsides(1)Standardinstallation
2
W
all-round joint on
one side permitted
1
1
11
1D
051+ND
1
20
05+ND
2
X
W
all-round joint
on one side permitted
051+ND
1
Themetal stud wallsmustbemadeupofatleast2x12.5mmDF
gypsumboardsaccordingtoEN520orequivalents.Thewallsmay
bewithoutorwithmineralwoolfilling.
Installationgapsforwet installationmustbefullysealedwithmortar
ofgroupIIorIIIaccordingtoDIN1053ormortarofclassesM2.5
toM20accordingtoEN998–2;orwithappropriatefireprotection
mortarorgypsummortar.
Intheareaoftheinstallationopenings,thewallsaretobefilledwith
panelsmadeofthewall-buildingmaterial,size≥DN+150mm.
Dry installationrequiresexact-fittingholes∅D1.
Dry installation
2
1
1 1
1
1D
Wet installation
Required
fireresistanceperiod
inminutes
30,60,90
Metalstudwallswithat
least2-layercladdingon
bothsides
≥95 mm
Minimum thicknesses W [mm] forthe
installationofBV90fireprotectionvalves:
Installation openings DN [mm] 100 125 160 200
• forwetinstallation 150 175 210 250
Roundorsquareopening
• (Core)hole∅D1[mm] 120142180220
Dryinstallationwithwallinfill Tolerance+2mm
DN+approximately50mm
1 Integratedduct
2 Wallanchoronintegratedduct
11 Screwsmin.4x45mm
8pcs.Drywallscrews4x45mmarein-
cludedinthescopeofdeliveryofthefire
protectionvalves
20 Gapfillingwith
mortar
Installation examples
Thefireprotectionvalvesareshownherewithoutvalvediscs.
Xalternative
Wallanchor(2)turned,mortaredand
fastenedwithscrews(11)attherear.
Dimensionsinmm
Thefireprotectionvalvesmustbeinstalledwith
spacingof≥200mmbetweentheintegrated
ducts(1).

17
14
2D
19
2Y
100
W
15
11
Z
18
11 16
11
1
801+ND
14
16
11
15
17
19
11
14
≥10
UserManual5.51(2021-07)11Subject to change Series BV92
DetailY
DetailZ
alternativelyfor
100<W≤110
Sizes DN 100 125 160 200
additionalwallanchors(19)
totheinstallationpipe(14)Pieces 3 3 4 4
Front installation view
shownwithoutvalvedisc!
1116 15
2 171918 14
BV90 fire protection valves
Installationinmetalstudwallscladonbothsides(2)Installationwithinstallationtube
Installation examples
Thefireprotectionvalvesareshownherewithoutvalvediscs.
1 Integratedduct
2 Wallanchoronintegratedduct
11 Screwsmin.4x45mm
8pcs.Drywallscrews4x45mmareincludedinthe
scopeofdeliveryofthefireprotectionvalves
14 Installation pipemadeofmineralbuildingmaterial⇒Pages3,13,14
15 Steelcoverplate,painted,purewhitecolour-RAL9010
16 Panheadscrew4x40mm,lacquered,purewhitecolour-RAL9010
17 Drywallscrews4x25mm
18 Drywallscrews4x45mm
19 Additionalwallanchors
Items15to19areincludedinthescopeofdeliveryoftheinstallationpipe(14).
Requiredfireresistance
periodinminutes 30,60,90
Metalstudwallswithat
least2layercladdingon
bothsides
70 mm
to
110 mm
Minimum thicknesses W [mm] forthe
installationofBV90fireprotectionvalves:
Tolerance+2mm
Rear installation view
Themetal stud wallsmustbemadeupofatleast2x12.5mmDF
gypsumboardsaccordingtoEN520orequivalents.Thewallsmay
bewithoutorwithmineralwoolfilling.
The installation of the installation pipes requires precisely fitting
boreholes∅D2.
Themountingsupports(1),mountingpipes(14)andcoverplates(15)
mustbefastenedwithscrews(11)or(16)!
Dimensionsinmm
Thefireprotectionvalvesmustbeinstalledwith
spacingof≥200mmbetweentheintegrated
ducts(1).
Installation openings DN [mm] 100 125 160 200
• (Core)hole∅D2[mm] 160185220260
fordryinstallationwithinstallationpipe

D1
2
11
001≥
D
21/22
11
DN + 150
1
X
DN + 50
2
001≥
D
20
22
D1
11
DN + 150
1
20 11
2
11
UserManual5.51(2021-07)12 Subject to change
Series BV92
BV90 fire protection valves
Installationinsuspendedorself-supporting,independentlyfire-resistantsuspendedceilings(1)
Suspended ceilings made of screwed and trowelled slab building materials andslab ceilings as inlaid con-
structionswithfireresistanceclassesF30,F60orF90
Buildingmaterialsofthesuspendedceilingscanbe,forexample,calciumsilicate(Promat),vermiculite(Miprotec),gypsum(Rigips,
Knauf,etc.).
Thesuspendedceilingsmustcomplywithageneralbuilding authority test certificate (AbP) or be designed in accordance with
DIN4102-4.
Dry installation
Installation openings
for DN [mm] 100 125 160 200
• forwetinstallation 150 175 210 250
Roundorsquareopening
•hole∅D1[mm] 120142180220
fordryinstallation Tolerance+2mm
DN+approximately50mm
1 Integratedduct
2 Wallanchoronintegratedduct
11Drywallscrew4x45mm
20 Gapfillingwith
mortar
21 Chuck plates30mmor50mmthick.
⇒Pages3,4
22 Multi-layerscrewedslabbuilding
materialsmadeofceilingmaterial
Wet installation
Installation examples
Thefireprotectionvalvesareshownherewithoutvalve
discs.
Xalternative
Wallanchor(2)turned,mortared
andfastenedwithscrews(11)at
therearoronbothsides.
Intheareaoftheinstallationopenings,the
suspended ceilingsaretobedoubledup
to≥100mmwithpanels≥DN+150mm
madeofceilingconstructionmaterial(22).
Chuck plates(21),30mmand50mm,
canalsobeused.
Forwetinstallation,theirinstallationopen-
ingsmustbeenlargedto≥DN+50mm!
Doublesandsuspendedceilingsmustbe
properlyscrewedtogether.
Dimensionsinmm
Thefireprotectionvalvesmustbeinstalledwithspacingof
≥200mmbetweentheintegratedducts(1).

2
11
001
D
11
D1
23
DN + 75
1
2
25
11
23
001
D
Z
D1
DN + 75
1
D1
25
2
11
17
11
14
Y
19
001
D
24
D2
1D2
11 14
UserManual5.51(2021-07)13Subject to change Series BV92
BV90 fire protection valves
Installationinsuspendedorself-supporting,independentlyfire-resistantsuspendedceilings(2)
Detail
Z
Detail
Y
Metal ceilings and suspended ceilings made of other building materialswithfireresistanceclasses
F30,F60,F90.Thesuspendedceilingsmustcomplywithageneralbuildinginspectiontestcertificate(AbP)orbeCE-marked.
Example:LINDNERtype1,3to11
F90 metal ceilings
Spans≤2.60m,widths≤400mmandD≥86mm
Example:OWAcoustic-barrierandAMF
F30 suspended ceilings made of mineral building materials
withelements≤625x1250mmorwithspans≤1800mmandwidths≤400mm,
D≥40mm.
Installation openings
for DN [mm] 100 125 160 200
• Borehole∅D1[mm] 120142180220
fordryinstallation
• Borehole∅D2[mm] 160185220
260
fordryinstallationwith
installationpipe
Tolerance+2mm
Tolerance+2mm
1 Integratedduct
2 Wallanchoronintegratedduct
11 Screwsmin.4x45mm
8pcs.Drywallscrews4x45mmareincludedinthe
scopeofdeliveryofthefireprotectionvalves
23 Insulatingjacket
24 Cavitydowels(on-site)
25 Steelcupblindrivet,4mm(on-site)
14 Installation pipemadeofmineralbuilding
material
⇒Pages3,11,14
17 Drywallscrews4x25mm
19 Additionalwallanchors
Items15to19areincludedinthescopeofdeliveryofthe
installationpipe(14).
F30 metal ceilings
Spans≤3mandD≥58mm
Example:LINDNERtype2
Installation examples
Thefireprotectionvalvesareshownherewithoutvalvediscs.
Dimensionsinmm
Thesefireprotectionvalvesmustbeinstalledwithspacing
of≥500mmbetweentheintegratedducts(1).
5kgadditionalloadispermittedperceilingelement.

UserManual5.51(2021-07)14 Subject to change
Series BV92
Installation
• BV90fireprotectionvalvesmustbeinstalledbasedon
theinstructionsinthisusermanual.
• Inaddition,therelevanttechnicalrulesandregulations
undernationallawforventilationsystemsmustbeob-
served,inparticularfortheintroductionofforcesand
loads.
• To compensate for elongation in case of fire, the fire
protection valves should be elastically connected to
ventilationducts.
Elasticconnectingpieceswithalengthofatleast10cm
wheninstalledshouldbemadeofnormallyflammable
building material (B2 according to DIN 4102-1) or of
Aluflexpipe.
•
Electricalwiringmustbeinstalledonsite.
Functional testing/servicing
• BV90Fireprotectionvalvesmustbekeptoperational
andmaintainedbytheowneroftheventilationsystem.
• They are to be viewed regularly and checked if
necessary.
Thevalvedisccanberemovedfromthemountingspigot
forthispurpose.⇒page2
Ifinspectionsrevealdeficiencies,thecausesmustbe
investigatedandremedied. Originalsparepartsmust
beusedforrepairsandmaintenance.
• Cleaning work required in ventilation systems for hy-
gienereasonsmustbeperformedinanoperation-de-
pendentmanner,andalsoincludesthefireprotection
valve.
• Anoperating manualfortheBV90fireprotectionvalve,
seriesBV92,isavailableontheinternet.
⇒www.wildeboer.de
Ordering:
Sizes: 100,125,160,200
⇒page3
Option:Limit switch E
⇒page3
Option:Backing board
50mmthickness F1
30mmthickness F2
⇒pages3,9,12
Option:Insulating jacket IM
⇒pages3,13
Option:Installation pipe ER
⇒pages3,11,13
BV90 fire protection valves
Installation/Maintenance/Electricalconnections/Orderingdata
BV92 - -
- Shut-offdevicetypeBV90
- Name(orcodenumber,ifapplicable)oftheinstallerwhoinstalled
theshut-offdevice.
- ifapplicable,nameoftheinstaller.
- No.ofthetypeapprovalZ41.8-697
- Yearofmanufacture:
Limitswitchisnotactuated:
→Fireprotectionvalveopen
Connectthelimit switch(item9)electrically
Limitswitchisactuated:
→Fireprotectionvalveclosed
Connectioncablecolourcoding
WheninstallingtheBV90fireprotectionvalvesinindependently
fire-resistantsuspendedceilings,theinstallingcontractor(installer)
shouldissuethebuildingownerwithadeclarationofconformityfor
professionalinstallationandattachanidentificationplatetothesus-
pendedceilingwiththefollowinginformation:
Formsforthedeclarationareavailableontheinternetatwww.wildeboer.de.
blue
grey
black
blue
grey
black

UserManual5.51(2021-07)15Subject to change Series BV92
Maintenance-free fire protection valve accord-
ing to EN 15650 with declaration of performance
and CE marking, up to 90-minute fire resistance
period and fire classifications EI90 (ve - ho,
i ↔o) S, K30U and K90U. Maintenance-free: Due
to complete enclosure of the operation unit
and the release element, no function-preserv-
ing cleaning or recurring lubrication and ad-
justment is necessary. For supply air (radial
wall, ceiling or free stream) and exhaust air.
For wet and dry installation in solid walls and
ceilings, in metal stud walls, shaft walls and
in independently fire-resistant suspended ceil-
ings made of panel building materials, drop-in
ceilings and in metal ceilings. Valve disc and
mounting spigot powder-coated coloured RAL 9010.
Hermetically encapsulated release element 70°C
made of stainless material. Stepless volume flow
adjustment. Certificate as proof of conformity
with the hygiene requirements according to VDI
6022-1, VDI 3803-1, DIN 1946-4, DIN EN 16798-3,
SWKI VA104-01, SWKI VA105-01, ÖNORM H6020 and
ÖNORM H6021.
Accessories: -Electrical limit switch for
CLOSE signalling.
-Lining panels 30 mm / 50 mm
for walls and suspended
ceilings.
- Installation pipe for walls
and suspended ceilings
-Insulating jacket for
suspended ceilings.
........ Pc.
Size: DN ..... mm
Volume flow: ........ m³/h
Pressure drop: ........ Pa
Sound power level: ........ dB(A)
Manufacturer: WILDEBOER
Type: BV90(series BV92)
Supply and install complete with fastenings
and other accessories.
deliver:...........
install:...........
Selecttextsnothighlightedinboldasrequired!
BV90 fire protection valves
Specificationtext

WILDEBOER BAUTEILE GMBH
Leipzig office
Telephone: +49 34444 - 310 - 0
E-mail: info@leipzig.wildeboer.de
Internet: www.wildeboer.de
Ulm office
Telephone: +49 7392 - 9692 - 0
E-mail: info@ulm.wildeboer.de
Internet: www.wildeboer.de
Utrecht office
Telephone: +31 30 767 0150
E-mail: info@utrecht.wildeboer.eu
Internet: www.wildeboer.de/nl
Factory administration
Telephone: +49 4951 - 950 - 0
E-mail: info@wildeboer.de
Internet: www.wildeboer.de
HAMBURG
HANNOVER
BERLIN
LEIPZIG
FRANKFURT
COLOGNE
STUTTGART
ULM MUNICH
MAKE USE OF OUR STRENGTHS!
UTRECHT
WEENER / EMS
This manual suits for next models
1
Popular Control Unit manuals by other brands

Sentiotec
Sentiotec A2 Instructions for installation and use

hager
hager NH00 Installation instruction

Kontron
Kontron COMe-cBT6 user guide

Ascent
Ascent HydroStat 3250-EKT Installation instructions and operating manual

WAGO
WAGO I/O-SYSTEM 750 manual

Astronics
Astronics Vertical Power Installation and operating manual

TQ
TQ COMSys COMKit quick start guide

Jefferson Solenoid Valves U.S.A. Inc.
Jefferson Solenoid Valves U.S.A. Inc. Z1314BV**AT Z1314BLV24AT Installation and Maintenance

Harvia
Harvia XENIO CX45J Instructions for installation and use

Generac Power Systems
Generac Power Systems SMM Owners & installation manual

Distech Controls
Distech Controls IO-R-16 manual

Sony
Sony CCP-9000-C installation manual