Door Drive
MIDI / SUPRA
Operating instructions
Blatt/
sheet
D823MGB.003
Datum/
date
01.03.2004
Stand/
version
01.03.2004
Geprüft/
approved
WAT/MZE
EXCELLENCE IN COMPONENTS
Änderungen vorbehalten! Subject to change without notice!
1.1 Description and function
WHD SUPRA car door operators are used for mid
and high duty elevators. The Drive can move panel
masses up to 1200kg complete door package
weight.
1.2 Liability and guarantee
This instruction handbook is written for people
who are familiar with lift servicing and installa-
tion. Sufficient knowledge of lifts is essential. WIT-
TUR accept no responsibility for damage caused by
inproper handling, or for damage caused as a
result of actions other than those stated in these
operating instructions. The WITTUR guarantee may
be voided if parts other than those described in
these instructions are installed.
1.3 Safety precautions
WITTUR machine installation or repair engineers
are chiefly responsible for the safe operation of
machinery. It is essential to comply with and keep
abreast of all safety rules and legal obligations in
order to avoid personal / product damage during
installation, maintenance and repair work.
Important safety advice and danger warnings are
emphasized with the following symbols:
General danger warning
High danger risk warning (i.e. crushing
edge, cutting edge etc.).
Risk of damage to machinery parts (i.e. due
to incorrect installation, or such like).
Important information sign
These operating instructions belong with the
whole installation and must be kept in a safe place
at all times (i.e. drive room)
1.4 Related documents
•Catalog D823CDEGB
•Betriebsanleitung D823MDE
1.5 Preparation for operation
Before installation work begins, it is in your own
interests to clarify what structural and spatial con-
ditions are available for installation work, so that
you can see which installation procedures should /
must be carried out. Therefore it is recommended
that all circumstances be taken into consideration,
and to men-tally plan the installation sequence
before any rash or badly planned work is carried
out. Check the goods or parts for correct and full
delivery upon receipt.
Installation tools
Following tools are needed:
•“T”-handled hexagon keys 4 mm, 5 mm and 6
mm
•Screw drivers (flat and crossheaded)
The drive unit is preadjusted at the factory. No
other mechanical and electrical adjustments other
mentioned in this instruction are required at site!
1.6 Delivery
Complete preassembled drive unit. Only to be
stored in the original package (plastic wrap). The
components must not be unpacked until the
installation begins.
1General information prior to installation