
YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
Page 3NJEX EUR ver.08-2021
Section 1: First Things To Know About The NJEX
Theory of Operation
CAUTION:
Excessive tubing lengths should be avoided. Instal-
lation of the NJEX Odorization system should be as
close to the point of injection and Odorant Storage
Tank as possible. Maximum tubing length should not
exceed 4.5 meters with the tubing size maintained as
indicated in this manual. If longer tubing lengths are
required consult YZ Systems Technical Services at;
800.653.9435 or 1.281.362.6500.
System Accessories