
1
EN
Only a person qualied in the technical elds concerned (electricity, hydraulics or refrigeraon) is authorised to
perform this procedure. The qualied technician working on the appliance must use/wear personal protecve
equipment (such as safety goggles and protecve gloves, etc.) in order to reduce the risk of injury occurring
when working on the appliance.
Before handling the machine, ensure that it is switched o and isolated.
Parts supplied
1 metal sheet to aach the duct
to the heat pump
1 strip of aluminium adhesive
tape
4 long screws + 4 washers
1 duct (3.3 meters maximum) +1 metal sheet to aach the
duct to the heat pump + 1 frame to aach the duct to the wall
in the technical premises
1 metal cable + 1 plasc duct + 1 tensioner
4 self-boring screws
2 grill aachment frames (to be
sealed)
2 grills
Installaon procedure
• It is vital that this procedure is carried out to the end to ensure that the appliance operates correctly,
• The appliance must be installed in a venlated technical room, free from freezing temperatures, all traces
of damp and stored pool maintenance products.
• Only the connecon kit supplied must be mounted on the blowing machine.
• Bring in the fresh air using the second grill provide in the kit; this fresh air must come directly from the
exterior ambient air and not from a room adjacent to the technical room.
• The exterior air must be brought in by lowering the pressure in the technical room.
• Check that this type of assembly does not hinder the other technical appliances in this room.