
Assembly Instructions / Power2 800-M
© Copyright 2016 ABB. All rights reserved.
This document is valid for different design variants of low and high-pressure stages. There
may be sections and descriptions of components that are not relevant for a specific low or
high-pressure stage.
ABB Turbocharging Service Stations will be happy to provide information about questions re-
garding a design variant (see "Contact Information" on our website
www.abb.com/turbocharging).
Accuracy of illustrations
The illustrations in this document are general in nature and intended for ease of understand-
ing. Differences in detail are therefore possible.
ABB Turbo Systems Ltd is identified as ABB Turbo Systems in this document.
Official service stations of ABB Turbo Systems
Official service stations are identified in this document as ABB Turbocharging Service Sta-
tions. They are regularly audited and certified by ABB Turbo Systems. See "Contact Infor-
mation" on our website at www.abb.com/turbocharging.
The following pictograms can occur in this document. These point out actions that must be
taken in accordance with the meaning of the relevant pictogram.
Tighten with specified torque
Oil free, grease free and dry
Tighten over specified tightening
Hand-tight, tighten without tools
Apply screw locking paste (e.g.
Apply high-temperature grease
See document
Apply other paste in accordance
with specifications
Dispose of in an environmentally
compatible, professional way and
in compliance with locally applica-
ble regulations.
Table 1: Definition of pictograms