manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. AccessPRO
  6. •
  7. Safety Equipment
  8. •
  9. AccessPRO INDUSTRIAL XB220H06K Owner's manual

AccessPRO INDUSTRIAL XB220H06K Owner's manual

Popular Safety Equipment manuals by other brands

Lanex PB-20 instruction manual

Lanex

Lanex PB-20 instruction manual

SKYLOTEC ANCHOR ROPES Instructions for use

SKYLOTEC

SKYLOTEC ANCHOR ROPES Instructions for use

Besto Buoyancy Aid 50N Instructions for use

Besto

Besto Buoyancy Aid 50N Instructions for use

TEUFELBERGER NODUS Manufacturer's information and instructions for use

TEUFELBERGER

TEUFELBERGER NODUS Manufacturer's information and instructions for use

Troy Lee Designs Tbone Product owners manual

Troy Lee Designs

Troy Lee Designs Tbone Product owners manual

Innova Xtirpa Instruction and safety manual

Innova

Innova Xtirpa Instruction and safety manual

bolle SAFETY B810 quick start guide

bolle SAFETY

bolle SAFETY B810 quick start guide

SHENZHEN FANHAI SANJIANG ELECTRONICS A9060T instruction manual

SHENZHEN FANHAI SANJIANG ELECTRONICS

SHENZHEN FANHAI SANJIANG ELECTRONICS A9060T instruction manual

Hiltron security POWER8E Installation and use manual

Hiltron security

Hiltron security POWER8E Installation and use manual

Salewa MTN SPIKE user manual

Salewa

Salewa MTN SPIKE user manual

Hatco B-950P installation guide

Hatco

Hatco B-950P installation guide

Sitec TX MATIC operating manual

Sitec

Sitec TX MATIC operating manual

TEUFELBERGER GRIP 12 Manufacturer's information and instructions for use

TEUFELBERGER

TEUFELBERGER GRIP 12 Manufacturer's information and instructions for use

MSA PremAire System Operation and instructions

MSA

MSA PremAire System Operation and instructions

AMC 1022M Series instruction manual

AMC

AMC 1022M Series instruction manual

Trinity CASS S3 Assembly manual

Trinity

Trinity CASS S3 Assembly manual

CMC Helitack HotSeat quick guide

CMC

CMC Helitack HotSeat quick guide

ACM SAFETY D200 Instructions and warnings

ACM

ACM SAFETY D200 Instructions and warnings

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

XB220H06K
TECHNICAL INSTRUCTIONS
WARNINGS FOR THE INSTALLER – GENERAL SAFETY OBLIGATIONS
1
ATTENTION! It is very important for the safety of people to follow all instruc-
tions strictly. A wrong installation or use of the product could cause serious
damage to people.
17
ªéåËÃåÄÞå½½åËÄÞªËé½ªôå½ÞåËÄ½¥ªåÄ¥ôĸĪģąÞªÄ¥½¥ªåÞ
integrated in the crosshead of the bollard) and a signal placard, along with the device
quoted at point “16” 2 Read carefully this manual before starting installation and save it
for future reference. 18 In each automatic installation the installer must consider.
2Read carefully this manual before starting installation and save it for future
reference. 18 In each automatic installation the installer must consider and install appropriate safety
devices.
3Packaging materials (i.e. plastic, polystyrene, etc.) must be out of children’s
reach, because potentially dangerous. 19 For maintenance works use only original parts supplied by AccessPRO INDUSTRIAL.
4
This product has been designed and manufactured exclusively on the purpose
indicated in this manual. Any different use not here indicated could damage the
integrity of the product and/or be potentially dangerous.
20
AccessPRO INDUSTRIAL is not responsible for safety and good functioning of the
product , in case of use of components not manufactured or distributed by AccessPRO
INDUSTRIAL.
5AccessPRO INDUSTRIAL is not responsible for any damage caused by impro-
per or different use from the indicated one. 21 ËÄËå××½ûÄûÃËĄåËÄåËåª×ÚåÞËÃ×ËÞÄ¥åªéåËÃå×ÚËéåÞÞ-
PRO INDUSTRIAL.
6ËÄËåÄÞå½½åªôÄÄú×½ËÞôÚģgÞÄ¥/ÄąÃÃ½¥ÞÞËé½
be not safe. 22
The installer must provide the Customer with all information related to the manual relea-
se of the automatic bollard in case of emergency and give the User a warning manual
attached to the product.
7Installation must be according to the local Laws. 23 Do not allow children or others to stop close to the bollard during operation.
8
In order to have an adequate safety level in the extra-CEE
countries, in addiction to the national laws, the above mentioned laws must be
followed.
24 Keep remote controls or other impulse-giving devices out of children’s reach, in order to
avoid involuntary activation.
9
AccessPRO INDUSTRIAL is not responsible if someone does not observes the
correct method of installation of the AccessPRO INDUSTRIAL products and
related devices, included deformations coming during the use.
25 Thoroughfare over the AccessPRO INDUSTRIAL bollard allowed only at complete
lowering of the bollard.
10 Before any actions on the automatic installations take power off. 26
Semiautomatic bollards are not adviceable for multiple installation (two or more) on
main streets where the frequent passage of vehicles over the lowered bollards can
break the lock block and make the bollard lifting without control.
11
An Omni polar switch should be foreseen on the alimentation’ s net of automatic
installations. Its connections should have an opening range of 3 mm. A magne-
totermical differential with 6A Omni polar switch is adviceable
27 The User must avoid any repairing actions or direct operations on the bollard, and must
ÚÞÞåËÙé½ĄÄéåªËÚĀ×ÚÞËÄÄ½ËĽûĪ
12 Assure that a differential switch with 0,03° is present at the
beginning of the automatic installation. 28 Do not waste exhausted batteries in the garbage, but dispose them in the apposite con-
tainers to allow recycling. Disposal costs have already been paid by the manufacturer.
13
The main electrical alimentation of the control unit of automatic installations
must be connected directly to at the beginning of the apposite principal switch
ÞåÄÞåªËÄåÚ˽éÄåįéÞÄåĽąÃ½Þ××ÚËôûå½ÞåËÄˤ
åªéÚË×Ä/ÄÞååéåÞĪcªÃÄÞËÄˤåªĄÚÞå½ÃÄååËÄ½ÄÃéÞå
minimum 3x2,5mm,but evaluated by the installer according to the number of
AccessPRO INDUSTRIAL bollards (400W each AccessPRO INDUSTRIAL
bollard) and the distance from the output point in order to guarantee a correct
alimentation (230V +/- 10% for moving AccessPRO INDUSTRIAL bollard).
29
The product is packaged on Euro pallet; use pallets’ movers or shunters for movement;
handle
with care.
14 Test that the earthing is workmanlike and connect the metallic parts. 30 The product has been manufactured with IP 56 protection’s level, and could therefore
be stored everywhere; storage in internal or covered places is anyway preferable.
15
The automatic installations include a standard safety device: an inversion
pressure switch in case of at least 40 kg of load. It is anyway necessary to test
the activation level every six months, according to what laws establish.
31 The product does not require availability of spare parts; AccessPRO INDUSTRIAL’s
warehouse can send by express any needed spare parts.
16
Safety devices (Law EN 12978) allow protection of potentially dangerous areas
where activities such as squashing, conveyance, shearing are possible to
occur.
32
In case of maintenance and/or reparation, Pay attention not to give improper raising
signals; to avoid any problems, disconnect the bollard’s moving by the switch set inside
the control management station.
33 Everything not mentioned in this manual is not allowed.
Technical datasheet of hydraulic XB220H06K - FE 6mm
Drive Hydraulic
Driven cylinder Steel FE 37 *1- thickness 6 mm
Treatment undergone by driven cylinder Polyester powder painting-color grey anthracite *2
Driven Cylinder Diameter 220 mm
Driven Cylinder Run 600 mm
Treatment undergone by cylinder top Polyester powder painting-color light grey (RAL7006)
Drive Speed Rise speed 10 cm/sec
Fall speed 20 cm/sec
Hydraulic pump ČčĊr½ÃÄååËÄŢċĊűďĊ,Ā
Protection class IP 67
Capacitor for pump 18 μF
Electrical input 220 W 230 V
Work frequency - Resistance class Intensive use > 2.000.000 life cycle
2.000 daily operations
Refractive adhesive band Standar height 55 mm
Work temperature -15 a 70 ºC (5 to 158 °F)
Overall weight with pit 120 kg
Manual lowering YES *4
Resistance to impact (without permanent damage) 20,000 Joules
Resistance to Impact (with permanent damage) 250,000 Joules
Dimensions of pit to be walled 500 x 440 x 1010 H
Standard cable length 10 m *5
AUTOMATIC AccessPRO INDUSTRIAL BOLLARD XB220H06K
INSTALLATION SEQUENCE
1) Ensure that the laying point of the AccessPRO INDUSTRIAL Bollard does not fall within an impluvium area; in cases when,
no matter why, this circumstance occurs, you need to partially shelter the AccessPRO INDUSTRIAL Bollard by means of a
draining channel, equipped with
covering grid.
2) Dig a hole (using a miniature excavator or your hands) down to 1.40m in depth approx. A sector side shall be 1.30m
approx.
3) Ensure that the ground features a good water absorption (try by introducing about 40 litres of water and rate that the drain
takes place in less than 30 minutes); otherwise, drain rain water through a pipe that is 60 mm in diameter connected to the
sewer or, as an alternative, connected to a pit (equipped with a pumpdown system, such as, for instance, an electric pump)
being deeper than the cement pipe that collects and drains rain water)
4) Introduce gravel (grain 8 to 20 mm. in diameter approx.) until a thickness of 30 cm approx. is reached, taking care to
compress it well to avoid eventual “settling shrinkages”.
5) Install the metallic pit with counterframe and steel rods, as showed in the detailed drawing (16 steel rods 14 mm in
diameter type FeB44K with butt-welded threaded pieces to high resistence type 8.8 M14) assuring to plumb it reminding
that the superior side of the counterframe must be 10mm higher than the walking level (in order to limit water rain enter in to
the pit). Install the pit checking the counterframe reference is in the correct direction.
6) In addiction to the a.m. steel rods, add 6 brackets 14 mm in diameter (see enclosed drawing).
đĹKÄåª×åÞÄÞå½½Ä¤ËÚËÄÚåÞåÄ¥ĤÞåąú½åéĎĊÃÃÄÄåÚÄ½ÃåÚ½ĺÄ¥åª½åÚ½
input of the pit to the control moving unit.
8) Cast concrete Rck = 25N,00/mm² all around the pit using a truck up to 15cm from walking level and vibrate the casting with
Þ×ĄÄÞåÚéÃÄåĪ
ēĹ^å½½åªËåªÚåéÞ½ĺÄ¥åªÃËôÄ¥ËÄåÚ˽éÄååËåª¤¤ÚÄå×ÚåˤåªÞûÞåÃĸúĪåÚ¤Ą½¥ªåÞĤÄéåôåéÚÄÞ
etc...), arrange for electrical connection, earthing and other commands if needed.
P. S.1: all tubes and steel reinforcements FeB44K must be set in full compliance with the regulations in force.
P.S. 2: all materials used for foundation, steel FeB44K and cls RCK= 25,00 n/mm2ĤÃéÞåÚåĄÄËÄåÚ˽½Ä
õËÚºÞÞ×ÚÚåĄåˤÙé½åûÚ½Þ¤ÚËÃ×ÚËéÄ¥ĄÚÃÞÄ¤é½½ËÃ×½ÄõåªåªÚ¥é½åËÄÞÄ¤ËÚĪ
NOTES ON MAKING THE MAGNETIC LOOP WITH A 9 m CABLE
If using the automatic AccessPRO INDUSTRIAL bollard, two inductive magnetic loops must be created
to detect metal
weights (cars), one in front of and another behind the bollard. The standard dimensions of these loops is:
width 1.80 m - length 3.00 m.
KåªÚÞĀÞÚ×ËÞÞ½¤åªÞõÚÚÄåÞåªÞĪcª½ËË×ÞÚåûéÞÄ¥Þ×½½åÚ½õåª
diameter of approximately 9mm and suitable protection, laid directly in the ground without the
need for conduits.
When laying the loop, it’s necessary to check that there are no electrowelded metal meshes nearby. If this is
the case, it’s essential that the mesh is at least 25 cm below the loop (otherwise, a 30 cm section of the mesh
below the loop must be removed).
The loop needs to be placed 5-7 cm below the road surface. If there is any porphyrite or similar, the blocks
of porphyrite must be lowered to allow for the loop to be laid at this depth. Alternatively, the loop can be laid
between one block and another with a fret pattern.
The loop is connected to a line that transmits the signal to the movement control station.This consists of a
special insensitive cable to be laid in a conduit with a 20-25 mm diameter.
TECHNICAL DATASHEET OF SP CONTROL STATION
Electronic control circuit Micro-processor-operated, with dedicated software that
manages the AccessPRO INDUSTRIAL units
SP control station case Wall-mounted
ÞÞĀ See attached table
Protection class IP 54
Work temperatures -15°C + 70°C
Control station power supply ČčĊrĪŘċĊűĽďĊ,Ā
Protection cut-off Differential thermo magnetic switch
Service transformer DC 24V Standard power 150 W
ORDINARY ROUTINE MAINTENANCE PROCEDURE FOR ACCESSPRO INDUSTRIAL BOLLARD
cªÞåÄÚÚËéåÄÃÄåÄÄÞÙéÄÞÞ¤Ë½½ËõÞģ½ÄÄ¥ˤ×åõåªÞéåËÄˤ½½ÃåÚ½Þåå½ÃÄåÞĪ
Ģ Cleaning of water drains located on the pit bottom
Ģ Cleaning and greasing of the central sliding rail
Ģ Testing (and replacement, if needed) of the lower beat gaskets
Ģ Testing and repair (if required) of the handling piston for oil leaks
Ģ General testing of the pop-up element’s screws for correct tightening
Ģ General cleaning of the driven cylinder and painting touch-ups, if needed
Ģ Testing of the hydraulic station, top-up of oil level and checks over working pressure settings
Ģ Testing and possibly setting of safety pressure switch for proper operation (40 Kg.
MOREOVER, IF THE FOLLOWING ITEMS ARE IN THE SYSTEM ,PERFORM THE FOLLOWING
CHECKS AND TESTS:
Ģ cÞååªąÞª½¥ªååªåÞÄËÚ×ËÚåÄåª½ÃÄåňÞª¤ËÚ×ÚË×ÚË×ÚåËÄ
Ģ K×ÚåÄ¥åÞåˤåÚ¤ĄĽ½¥ªåÞ½ÄåÚÄÞ
Ģ Operating test of inductive safety turns
Ģ Check over the power failure procedure for proper operation
Ģ Operating test over the control radio receiver
Ģ Operating test of the emergency lowering sound analyser
Ģ Operating test of the remote control GSM effector
Ģ ^¥ªåªºˤåª½åÚËÄªÄ½Ä¥ÃÄ¥ÃÄåéÄåĸĪ¥ĪģńąËËŅ
Ģ Ú½ûËÄååÞËúĀ½Ã×ÞļåĪĹ