AFL Hyperscale U Series User manual

Installation Guide
2RU
Front-Access
V-Panel (FVP)
Series

2© AFL Hyperscale. All rights reserved Series
Safety Precautions
Laser Precautions
Warning: The laser light used to transmit information over optical ber cables can cause severe eye
damage. Because this light is invisible, it will not cause the iris of the eye to contract involuntarily as when
viewing a bright visible light, and no pain is felt as the retina is burned.
Never look into the end of a ber or connector which may have a laser coupled to it. Should accidental
eye exposure to laser light be suspected, arrange for an eye examination immediately.
General Precautions
Personnel must be thoroughly familiarized with all applicable Occupational Health and Safety (OH&S)
regulations, local regulations, and your company safety practices and policies.
Warning: To reduce the chance of accidental injury:
Before work begins, all personnel must be thoroughly familiar with the operation of all equipment
and procedures to be used during the installation.
Before use, all equipment, especially safety gear, must be inspected and tested for proper operation.
Replace and repair as necessary.
U-Series 2RU Front-Access V-Panel (FVP)
Before installing or adjusting this product, please read these instructions carefully.
Please keep this guide for future reference.

U-Series 2RU Front-Access V-Panel (FVP)
3
© AFL Hyperscale. All rights reserved
Series
Component Overview
02
04
04
06
01
03

4© AFL Hyperscale. All rights reserved Series
(12) Ø10mm OD Fiber
Braid Tube (1m)
Cross-Head and
Flat-Head Screwdriver
Scissors
(13) Electrical Tape (14) Velcro
Socket Wrench/
Spanner-13mm
FVP Pre-Terminated
Replacement Cassette
Measuring Tape
(15) Hose Clip (16) M6 x 10 Screw
(11) Cable Ties
In the Box
What You Will Need Related Products
(07) M6 Cage Nut
+ Screws (10) Nylon Braid
(08) 12f Ribbon Splice
Protector
(09) 24f 200μm SpiderWeb Ribbon®(SWR®)
LC Pigtail (Pre-Installed)
Item
Number Item Qty
01 Front-Access V-Panel (FVP) 1
02 288f Modular Drawer 1
03 Front Door 1
04 24f LC Dust Seal Shuttered
Adapter Module 12
05 Cable Breakout Box/Cover with
Brush Strip & Screws 1
06 144f Ribbon Mass Splice Tray 2
07 M6 Cage Nuts + Screws 2
08 12f Ribbon Splice Protector 2
09 24f 200μm SpiderWeb Ribbon
(SWR) LC Pigtail (Pre-Installed) 12
10 Nylon Braid 5m
11 Cable Ties 4
12 Ø10mm OD Fiber Braid Tube
(1m) 1.5
13 Electrical Tape 1
14 Velcro 2m
15 Hose Clip 2
16 M6 x 10 Screw 4
250 μm WTC with SWR®
One-Click®Cleaner
D-LC, Duplex LC
U-Series 3456f & 6912f
Breakout Box

U-Series 2RU Front-Access V-Panel (FVP)
5
© AFL Hyperscale. All rights reserved
Series
Panel Mounting
Slide out drawer and de-latch rail.
1
Activate black lever to detach slide rail
2RU
1RU
1RU
Insert cage nuts in positions shown on both
left- and right-hand-side of rack.
2
Partially tighten cage nut screws in positions
shown using screwdriver.
3Insert 2RU panel into 19” rack, insert and
tighten all cage nut screws.
4

6© AFL Hyperscale. All rights reserved Series
Panel Mounting
Remove rear door.
5

U-Series 2RU Front-Access V-Panel (FVP)
7
© AFL Hyperscale. All rights reserved
Series
Slide hose clamps over cable and strip cable
jacket 4m according to manufacturer’s
guidelines.
6Cut 2.5m/8” approx. length of nylon braid, slide
braid onto ber braid tube, then tape braid at
both ends of tubing to secure.
7
Separate out and tape up 144f ber bundle
ends as per splicing schedule and feed into
ber braid tube.
8Slide ber braid tube up to jacket strip point
and remove tape, allowing braid to feed onto
ber.
9
4m/13”
approx.
Braid
Tube
Tape
Cable Installation

8© AFL Hyperscale. All rights reserved Series
Cable Installation
Remove tape from the tube, feed nylon
braid onto ber towards cable, and remove
tube from ber.
10
Attach cable to clamp with hose clips and
place braid tails into slots.
12 Position and screw cable breakout unit onto
side of panel.
13
Repeat steps 6-10, ensuring all ber has braided
sleeve and tape braid sleeve at cable jacket end.
11
Tape
25mm/1”
approx.
Hose
Clamps
Cable
Braids

U-Series 2RU Front-Access V-Panel (FVP)
9
© AFL Hyperscale. All rights reserved
Series
Cable Installation
Cut
Grommet
Cable
Braid
Cut grommets halfway through. Route cable
braid tails though grommet in 2 x 144f bundles
and slot grommets into panel (do not pull tight,
leave natural slack curve).
14 Feed all cable braid tails through to front of
panel and cable tie braids to T-slots (do not
over-tighten).
15
Fit cable cover.
16 Fit rear door.
17
Screw
Positions
Cable
Tie
Cable Cover

10 © AFL Hyperscale. All rights reserved Series
Cable Installation
Remove drawer cover.
18
Cassette to splice tray ber map: cassettes 1-6 into Splice Tray 1 (BOTTOM), cassettes 7-12 into Splice Tray 2
(TOP).
19
Splice Tray 2
(Top)
Splice Tray 1
(Bottom)
Cassette/
Pigtail Tail
Number
Splice Tray 2
(Top Tray)
Splice Tray 1
(Bottom Tray)

U-Series 2RU Front-Access V-Panel (FVP)
11
© AFL Hyperscale. All rights reserved
Series
Cable Installation
Re-t drawer cover, ensuring cable braid tail
passes though cut-out. Use cut-out on right-
hand-side for alternate side cable entry.
20 Ensuring drawer runners are retracted, slide
spliced drawer into runner of 2RU panel – an
audible click sounds when runners are engaged.
21
Push drawer back into panel so that it is fully
retracted.
23
Ensure drawer runners
are retracted
Push/Pull Handle
Slide drawer back out to fully extended, gently
pull braid tail to straighten, and make slack
coil, securing with Velcro as shown.
22

12 © AFL Hyperscale. All rights reserved Series
Cable Installation
Splice Tray 2 (TOP): Tie off cable braid to splice tray. Starting with internal pigtail #7 (RED), splice to cable
ber (GREEN), place splice protector into YELLOW holder. Coil ber in suggested route shown.
25
Splice Tray 1 (BOTTOM): Tie off cable braid to splice tray. Starting with internal pigtail #1 (RED), splice to cable
ber (GREEN), place splice protector into YELLOW holder. Coil ber in suggested route shown.
24
Internal SWR®Pigtail
Fiber Slack Loop
(Pre-Installed)
Internal SWR®Pigtail
Fiber Slack Loop
(Pre-Installed)
Tail
Identication
Labels
Cable Fiber
Slack Loop
Splice Tray 1
(Bottom Tray)
Splice Tray 2
(Top Tray)
Cable Braid
Cable
Tie-Off Point
Cassette
Identication
Labels
Cable Fiber
Slack Loop
Cable Braid
Cable
Tie-Off Point
Tail
Identication
Labels
Cassette
Identication
Labels

U-Series 2RU Front-Access V-Panel (FVP)
13
© AFL Hyperscale. All rights reserved
Series
Cable Installation
Slide door mount bracket behind screw heads and tighten. Repeat for other side.
26
Attach front door to mounts with spring plungers. Door pivots and latches closed with swell latches. Stick
relevant port label to rear of door.
27
Labels

14 © AFL Hyperscale. All rights reserved Series
Braided tail routing example for splicing cable/
conduit between two panels.
Cable Tie
Point
Cable
Braid
Screw
Positions
Braid Tails
Panel Dimensions
Braided tail routing for splicing cable/conduit
between three panels.
Braided tail routing example for bottom feed cable
routing - t cable cover as shown.
Cable
Braid
Additional Steps
Braid can route
through aperture
cover
Braid can route
through aperture
cover

U-Series 2RU Front-Access V-Panel (FVP)
15
© AFL Hyperscale. All rights reserved
Series
Notes

Thank you for choosing AFL Hyperscale
AFLHS2RUFAVPAN240620
www.aflhyperscale.com
AFL Hyperscale reserves the right to make changes in this Installation Guide at any time without notice
Other manuals for U Series
10
This manual suits for next models
1
Table of contents