Airspan AS4000 Guide

605-0000-452 Issue 1.3dr Date 7/02/00
AS4000
Wireless Local Loop System
Demand Assignment
Central Terminal
Installation and Commissioning

AS4000 Central Terminal
Installation and Commissioning Preface
605-0000-452
Issue 1.3dr Date 7/02/00
Page 2of 8
This Page Intentionally Blank

AS4000 Central Terminal
Installation and Commissioning Preface
605-0000-452
Issue 1.3dr Date 7/02/00
Page 3of 8
Notice
1. This manual is subject to revision.
2. All rights reserved.
3. Right of modification reserved.
4. This manual is supplied without liability for errors or omissions.
5. No part of this manual may be reproduced or used except as authorised by contract or
other written permission.
6. This equipment is conditioned by the requirement that no modifications will be made to
the equipment unless the changes or modifications are expressly approved by ACC
Communications
7. Prerequisite skills: Personnel installing, commissioning, and maintaining the Airspan
products must have a basic knowledge of telephony and radio communications, and
have experience in installing, commissioning and maintaining telecommunications
products. ACC provides a range of comprehensive training courses specifically aimed
at providing operators/users of Airspan products with the prerequisite skills to install,
commission and or maintain the product. The courses can be tailored to provide the
level of training required by the operator/user.
8. Airspanand Sitespanare Registered Trademarks of Airspan Communications
Corporation.
For additional information on Airspan Systems, please call your ACC Representative, or
contact ACC at: Cambridge House
Oxford Road
Uxbridge
Middlesex
UB8 1UN
Call (44) 1784 886700

AS4000 Central Terminal
Installation and Commissioning Preface
605-0000-452
Issue 1.3dr Date 7/02/00
Page 4of 8
This Page Intentionally Blank

AS4000 Central Terminal
Installation and Commissioning Preface
605-0000-452
Issue 1.3dr Date 7/02/00
Page 5of 8
Safety Instructions - Warnings and Cautions
SAFETY
1. Read and follow all warning notices and instructions marked on the product or included in
this manual
2. Do not allow anything to rest on any power cord and do not locate the product where
persons could step or walk on a power cord.
3. When installed in the final configuration, the product must comply with the applicable Safety
Standards and regulatory requirements of the country in which it is installed. If necessary,
consult with the appropriate regulatory agencies and inspection authorities to ensure
compliance.
4. No hazardous RF radiation is emitted from the equipment. Measured at the surface of
the CRU radome, when transmitting, the maximum total power radiated from the CRU is
0.01% of the UK National Radiological Protection Board basic restriction per kg. of body
part.
WARNING - HAZARDOUS VOLTAGES
On AC installations, hazardous voltages exist. Use caution when verifying or working with
AC power. Remove metal jewellery that could come into contact with AC power.
On DC sections, short circuiting the low voltage, low impedance circuits can cause severe
arcing that may result in burns or eye damage. Remove rings, watches etc. to avoid shorting
DC circuits.
Electro-Static Discharge ESD
Electro-Static Discharge. Many circuits contain devices which are susceptible to damage from
high impedance voltage sources. To avoid such risks always follow anti-static procedures
where marked.

AS4000 Central Terminal
Installation and Commissioning Preface
605-0000-452
Issue 1.3dr Date 7/02/00
Page 6of 8
NOTE
Airspan products do not contain hazardous substances (as defined in UK ‘Control of
Substances Hazardous to Health Regulations 1989’, and the ‘Dangerous Substances
Regulations 1990’). At the end of any Airspan product’s life cycle, the customer should
consult with DSC to ensure that the product is disposed of in conformance with the relevant
regulatory requirements
The Symbol on an Airspan product signifies that it has been certified according to the EMC
directive 89/336/EEC. The product fulfils the requirements according to the following
standards:
EN50082-1 for Immunity.
EN55022 Group 1 Class A for the Central Terminal Emissions.
EN55022 Group 1 Class B for the Subscriber Terminal Emissions.
NOTE
The Subscriber Terminal equipment has been tested and found to comply with the limits for a
Class B digital device, pursuant to part 15 of the FCC Rules.
CAUTION PA INSERTION
Care should be taken when installing PAs to ensure that the card connector mates with the
backplane connector correctly. Any attempt to ram the card home or force the
card into he slot may cause damage to the connector. Insert the card until the connectors
engage, ease the card into the backplane until fully engaged. Lock top and bottom with a
screwdriver. If resistance is met remove the card and reinsert. If difficulty persists contact the
Airspan service centre.
CAUTION DIP/LNA INSERTION
Care should be taken when installing DIP/LNAs to ensure that the card connector mates with
the backplane connector correctly. Any attempt to ram the card home or force the
card into he slot may cause damage to the connector. The board extractor levers mat be used
to assist with insertion, when the card is home press the body of the DIP/LNA to ensure that
the connector is fully engaged. If resistance is met remove the card and reinsert. If difficulty
persists contact the Airspan service centre

AS4000 Central Terminal
Installation and Commissioning Preface
605-0000-452
Issue 1.3dr Date 7/02/00
Page 7of 8
User Response Form
Mail: Airspan Communications Limited Fax: (44) 01895-467182
Cambridge House
Oxford Road
Uxbridge
Middlesex
UB8 1UN
Document Rating Excellent Good Average Below Average Poor
Accuracy / Completeness qqqqq
Clarity / Organisation qqqqq
Figures qqqqq
Table of Contents/Index qqqqq
The nature of this response is Addition qDeletion qCorrection q
Please enter details of response below (include precise reference to Section, Page, Paragraph)
Please Complete the following for acknowledgement/response:
Name: ........................................ Address ..........................................
Company ........................................ ..........................................
Job Title ........................................ ..........................................
Department ........................................ ..........................................
Telephone ........................................ ..........................................
Thank you for your co-operation and assistance.

AS4000 Central Terminal
Installation and Commissioning Preface
605-0000-452
Issue 1.3dr Date 7/02/00
Page 8of 8
This Page Intentionally Blank

AS4000 Central Terminal
Installation and Commissioning ICL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 1of 2 © Copyright Airspan Communications Corporation 2000
ISSUE CONTROL LIST
Title Issue Date Issue Details
Title Page 1.3dr February 2000
ICL-001 1.3dr February 2000
IXL-001 1.3dr February 2000
GSI-001 1.3dr February 2000
GSI-002 1.3dr February 2000
GSI-003 1.3dr February 2000
DLP-001 1.3dr February 2000
DLP-002 1.3dr February 2000
DLP-003 1.3dr February 2000
DLP-004 1.3dr February 2000
DLP-005 1.3dr February 2000
DLP-006 1.3dr February 2000
DLP-007 1.3dr February 2000
DLP-008 1.3dr February 2000
DLP-009 1.3dr February 2000
DLP-010 1.3dr February 2000
DLP-011 1.3dr February 2000
DLP-012 1.3dr February 2000
DLP-013 1.3dr February 2000
DLP-014 1.3dr February 2000
DLP-015 1.3dr February 2000
DLP-016 1.3dr February 2000
DLP-017 1.3dr February 2000
Appendix 1 1.3dr February 2000
Appendix 2 1.3dr February 2000
Appendix 3 1.3dr February 2000
Appendix 4 1.3dr February 2000
1.3dr February 2000

AS4000 Central Terminal
Installation and Commissioning ICL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 2of 2
CHANGE TYPE/DATE PURPOSE PAGES AFFECTED
Issue #, Month Year
1.0 Initial Document All
1.1 April 99 Commissioning details
added DLPs6-17 and Appendix’s
1.2 August 99 Update to
commissioning for
Sitespan 3.4
DLPs 6-14
1.3 December 99 Modification to
commissioning process DLPs 6-12

AS4000 Central Terminal
Installation and Commissioning IXL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 1of 8 © Copyright Airspan Communications Corporation 2000
INDEX TASK LIST
PREFACE:
Safety Instructions Warnings and Cautions
User Response Form
ACCESS: ICL, IXL
Issue Control List ................................................................................................ICL-001
Index Task ListIXL-001
GENERAL SYSTEM INFORMATION: GSI
Introduction. ........................................................................................................GSI-001
1. Purpose of Document..............................................................................................1
2. Prerequisite skills ....................................................................................................1
Overview...............................................................................................................GSI-002
1. Installation Tasks ....................................................................................................1
2. Safety......................................................................................................................1
2.1. Electromagnetic Radiation.......................................................................................1
2.2. Hazardous Voltages................................................................................................2
2.3. ESD........................................................................................................................2
Technical Specifications.......................................................................................GSI-003
1. Central Terminal .....................................................................................................1
1.1. RF Parameters.........................................................................................................2
1.1.1. 2.0-2.3GHz Band ............................................................................................2
DETAIL LEVEL PROCEDURES.
Preparatory Tasks. ..............................................................................................DLP-001
1. Installation Tools and Equipment ............................................................................1
1.1. Required Tools........................................................................................................1
1.2. Required Equipment................................................................................................2
2. Site Readiness.........................................................................................................2
2.1. Power Availability...................................................................................................2
2.2. Site Earth................................................................................................................3
2.3. Flooring..................................................................................................................3
2.4. Cable Trays.............................................................................................................3

AS4000 Central Terminal
Installation and Commissioning IXL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 2of 8
2.5. Delivery Inspection .................................................................................................3
2.6. Unpacking Inspection..............................................................................................4
Rack Installation..................................................................................................DLP-002
1. Positioning and Securing Racks...............................................................................1
1.1. Rack Preparation.....................................................................................................1
1.2. Installing Rack in a Suite.........................................................................................1
1.3. Securing Rack Base.................................................................................................2
1.4. Securing the rack using overhead Ironwork.............................................................3
1.5. Securing a Rack to a Wall .......................................................................................4
Central Terminal DA Rack Cabling...................................................................DLP-003
1. DC Power...............................................................................................................1
1.1. Rack Earthing .........................................................................................................2
2. Alarm Unit (Type 55B) External Connections .........................................................4
3. 2Mbit/s Cabling.......................................................................................................5
Central Terminal Expansion Rack Cabling. ......................................................DLP-004
1. DC Power...............................................................................................................1
1.1. Rack Earthing .........................................................................................................3
2. Alarm Unit (Type 55B) External Connections .........................................................4
3. 2Mbit/s Cabling.......................................................................................................4
4. Inter-rack connections.............................................................................................6
Card Installation .................................................................................................DLP-005
1. Preliminary..............................................................................................................1
2. Card Insertion.........................................................................................................3
3. Card Provision for New Installation.........................................................................6
4. Fit RF Coupler if using a DACU..............................................................................7
5. Connect Antenna.....................................................................................................7
5.1. Two Antenna Installations.......................................................................................7
5.2. Single Antenna Installations.....................................................................................8
6. Card Provision into existing installation...................................................................9
Commissioning Tests...........................................................................................DLP-006
1. General ...................................................................................................................1
2. Commissioning rack................................................................................................1
Turn -Up and DC measurements .......................................................................DLP-007
1. Rack Turn-Up and Measuring Input Voltage(Test 1a).............................................1
2. Switching on the racks. (Test 1b) ............................................................................2
3. PSU Voltage Combiner Shelves: (Test 2)................................................................3
4. PSU Voltage Modem Shelves: (Test 2a).................................................................4
Setting Up system Using Sitespan ......................................................................DLP-008
1. Setting up Site Configuration on Sitespan................................................................1

AS4000 Central Terminal
Installation and Commissioning IXL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 3of 8
2. Setting up CT Rack and Shelf configuration on Sitespan .........................................4
3. Assign Central terminal Card Slots..........................................................................6
3.1. DTU Card...............................................................................................................6
4. Setting up AC Rack and Shelf configuration on Sitespan.........................................8
5. Assign Access Concentrator Card Slots.................................................................11
6. Configure AC Cards..............................................................................................12
6.1. CTU......................................................................................................................12
6.2. CAS......................................................................................................................12
6.3. DATA...................................................................................................................13
6.4. V5.1......................................................................................................................14
Shelf Controller Software Downloads ................................................................DLP-009
1. Shelf Controller Software Downloads .....................................................................1
2. Alarm and Status Indications (Test 3)......................................................................4
3. Self Test (Test 4) ....................................................................................................8
4. System Soak ...........................................................................................................8
5. Preparation for Commissioning at the Central Terminal...........................................8
Setting the receive sensitivity 2.0-2.3Mhz Band using DA Commissioning Unit
(DACU) DLP-010
1. Setting Up The DACU............................................................................................1
1.1. RF Interconnect ......................................................................................................2
1.2. Shelf Controller Communications............................................................................2
1.3. DC Connections......................................................................................................3
1.4. Connect Power Meter .............................................................................................3
1.5. Connect LAT Terminal ...........................................................................................4
2. Forcing the DA Commissioning Unit to acquire a link .............................................4
3. Rx Sensitivity..........................................................................................................4
4. Restoring shelf connections.....................................................................................6
Power Measurements and RX sensitivity ..........................................................DLP-011
Test TX Output Power (Test 5)......................................................................................1
Tools and equipment needed...........................................................................................1
1. CT Output Power....................................................................................................1
2. Rx Sensitivity (Test 6).............................................................................................4
Setting the system into service ............................................................................DLP-012
1. Set E1 link to Access Concentrator.........................................................................1
2. Set Sitespan to use direct Com................................................................................2
3. Reset Free list Entries..............................................................................................4
4. Check ST Acquisition..............................................................................................6
5. Remove Test Equipment .........................................................................................8
Commissioning Test Results ...............................................................................DLP-013
1. Commissioning Test Results....................................................................................1
1.1. Test Equipment Calibration.....................................................................................1

AS4000 Central Terminal
Installation and Commissioning IXL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 4of 8
Site Acceptance ...................................................................................................DLP-014
1. Site Inspection ........................................................................................................1
2. Site Acceptance Forms............................................................................................1
2.1. Purpose...................................................................................................................1
BNC Terminations to Coax............................................................................ Appendix 1
Procedure in case of Power Control Loop failure.......................................... Appendix 2
1. Output Power Level Detection................................................................................1
Procedure in case of card boot-up failure...................................................... Appendix 3
1. Procedure in case of card boot-up failure.................................................................1
Programming the Test ST-v2 CRU (Type 2 PSU and Type 4 PSU) Using a Test
Telephone Appendix 4
1. ST Programming.....................................................................................................1
LAT .............................................................................................................Appendix 5
1. LAT connected to SC .............................................................................................1
2. LAT connected to an ST.........................................................................................2
Setting-up Shelf Backplane ............................................................................Appendix 6
1. LAT Settings...........................................................................................................1
2. Setting-up Shelf Backplane......................................................................................1

AS4000 Central Terminal
Installation and Commissioning IXL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 5of 8
List of Figures
Figures Page
DLP-001
Figure 1. Packaging for CT Site 3
DLP-002
Figure 2. Central Terminal Racks. 1
Figure 3. Securing Rack Base 2
Figure 4. Typical Overhead Ironwork Support 3
Figure 5. Securing Rack To Wall 4
DLP-003
Figure 6. DC Termination On Combiner Shelf. 2
Figure 7. Rack Earthing 3
Figure 8. AS4000 Alarm Unit Connections 4
Figure 9. Station Alarm Connection 4
Figure 10. E1 Rack Cable Runs 5
Figure 11. Shelf Interface Connections. 6
Figure 12. 120 ohm connection to CT modem shelf. 7
DLP-004
Figure 13. DC Termination On Combiner Shelf. 2
Figure 14. Rack Earthing 3
Figure 15. AS4000 Alarm Unit Connections 4
Figure 16. Shelf Interface Connections. 4
Figure 17. 120 ohm connection to CT modem shelf. 5
Figure 18. Combiner Shelf Ribbon Connections 6
DLP-005
Figure 19. Part of RF Combiner Shelf showing Circuit Breakers. 2
Figure 20. Expansion Rack Fuse and Alarm Panel 2
Figure 21. Card Insertion DA Rack 4
Figure 22. Card Insertion Expansion Rack 5
Figure 23. Card installation for DA Modem Shelf 6
Figure 24. RF Antenna Connections 8
Figure 25. Coupler Connection 9
DLP-007
Figure 26. Test Voltage (CT Rack) 1
Figure 27. Test Voltage (Expansion Rack) 2
Figure 28. PSU Voltage Test. 3
Figure 29. Modem Shelf PSU 4
DLP-009
Figure 30. Modem Shelf Backplane 1
Figure 31. Combining Shelf Alarm Indications 7
DLP-010
Figure 32 DACU Connections to AS4000 DA CT Rack 1
DLP-011

AS4000 Central Terminal
Installation and Commissioning IXL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 6of 8
Figure 33. Power Level measurement Test Set-Up 2
Figure 34. Test Set-up 2.0-2.3GHz, 3.4-3.6GHz, and 2.3-2.5GHz Bands. 4
Figure 35. Test Set-up 1.8-1.9GHz Band 5
List of Tables
Table Page
GSI-003
Table 1. Physical Characteristics. 1
Table 2. Environmental Specifications. 1
Table 3. Power Requirements. 2
Table 4. RF Parameters. 2
DLP-001
Table 1-1. Required Test Equipment. 2
DLP-003
Table 2. DC Power Cables. 1
DLP-004
Table 3. DC Power Cables. 1
DLP-007
Table 4 4
DLP-009
Table 5. RF Combiner Shelf Card LED Indications. 5
Table 6. Modem Shelf Card LED Indications. 7
Appendix 4
Table 7. CRU Programming Information 1

AS4000 Central Terminal
Installation and Commissioning IXL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 7of 8
Abbreviations
AC Alternating Current
AGC Automatic Gain Control
AU Analogue Unit
A/D Analogue/Digital
CPE Customer Premises Equipment
CRU Customer Radio Unit
CT Central Terminal
CTU Concentrated Tributary Unit (Access Terminal Shelves)
CU Compression Unit
DA Demand Assignment
DC Direct Current
DMM Digital Multi Meter
DRS Digital Radio System
DTU Demand Assignment Tributary Unit
FA Fixed Assignment
ISDN Integrated Services Digital Network
ITU-T International Telecommunications Union -Telecommunications
LD Loop Disconnect
LED Light Emitting Diode
MF Multi-Frequency
MSTP Modem Shelf Termination Panel
MU Modem Unit
NTU Network Termination Unit
PC Power Control
PSU Power Supply Unit
RF Radio Frequency
SC Shelf Controller
SPU Signalling Processing Unit
ST Subscriber Terminal
Rx Receive
Tx Transmit
TU8 Tributary Unit Eight E1 ports
VDU Video Display Unit
VF Voice Frequency
XTU Exchange Tributary Unit (E1 protocol: CAS, V5.1, V5.2)

AS4000 Central Terminal
Installation and Commissioning IXL 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 8of 8
Related Documentation
605-0000-450 System Overview
605-0000-451 System Operations and Maintenance Manual
605-0000-453 Access Concentrator - Installation & Commissioning
605-0000-433 Central Terminal - Antenna/Feeder Installation & Commissioning
605-0000-454 Subscriber Terminal - Installation & Commissioning
605-0000-437 D128 Terminal Converter
605-0000-435 Material Return and Repair
605-0000-427 Sitespan

AS4000 Central Terminal
Installation and Commissioning GSI 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 1of 2 © Copyright Airspan Communications Corporation 2000
INTRODUCTION
1. Purpose of Document
This document describes the installation and commissioning of the ACC AS4000
Central Terminal (CT) Rack and associated shelves to Demand Assignment
specifications. This document covers new rack installations and the incremental addition
of modem shelves.
2. Prerequisite skills
Personnel installing and commissioning the AS4000 products must have a basic
knowledge of telephony and radio communications, and have experience in installing
telecommunications products. ACC provides a range of comprehensive training
courses specifically aimed at providing operators/users of AS4000 products with the
prerequisite skills to install, commission and or maintain the product. The courses can
be tailored to provide the level of training required by the operator/user.
This manual is intended for use by persons familiar with the AS4000 product having
attended the ACC CT Installation and Commissioning Training course prior to
performing the procedures in this practice.

AS4000 Central Terminal
Installation and Commissioning GSI 001
605-0000-452
Issue 1.3dr Date 7/02/00
Page 2of 2
This Page Intentionally Blank
Other manuals for AS4000
6
Table of contents
Popular Touch Terminal manuals by other brands

Network Computing Devices
Network Computing Devices ThinSTAR 300 user guide

XAC
XAC PINPAD 8006L1-1CRA Series installation guide

Epson
Epson IM-800 user manual

Protech Systems
Protech Systems PA-3170 Quick reference guide

Bosch
Bosch rexroth IndraControl VAC 08.1 operating instructions

Sam4s
Sam4s SPS-1000 Programming manual